Attachment 1 Construction and Material Specifications.pdf
PDF 546 KB Posted
- Attached to
- Credille and Chumbley WRE, Graves County, KY
- Solicitation number
- 12FPC324Q0045
About this file
This document contains construction and material specifications for a Wetland Reserve Easement Hydrology Restoration Project in Graves County, Kentucky. The key details are:
The work will consist of stabilizing two degraded stream crossings totaling approximately 246 linear feet. The project is located in Graves County, Kentucky and is being solicited by the Department of Agriculture Under Secretary for Farm Production and Conservation under Solicitation Number 12FPC324Q0045. The construction specifications cover items such as clearing, pollution control, seeding and mulching, mobilization and demobilization, and removal of water. The material specifications cover rock riprap, geotextile, and other aggregates. Pricing will be based on specific unit prices or lump sum amounts. There are no set-asides mentioned, and no information on incumbents or award dates.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WETLAND RESERVE EASEMENT
HYDROLOGY RESTORATION PROJECT
Credille and Chumbley
GRAVES COUNTY, KENTUCKY
CONSTRUCTION and MATERIAL
SPECIFICATIONS
NRCS 2024
Credille and Chumbley WRE
LIST OF APPLICABLE SPECIFICATIONS
Construction Specifications
Number Title Pages 1 Clearing 1 - 3 5 Pollution Control 1 - 3 6 Seeding, Sprigging, and Mulching 1 - 3 8 Mobilization and Demobilization 1 - 1 11 Removal of Water 1 - 3 61 Rock Rip Rap 1 - 3 95 Geotextile 1 - 2
Material Specifications
Number Title Pages
523 Rock for Rip Rap 1 - 3 592 Geotextile 1 - 4
Construction Drawings
Drawing Sheets Credille and Chumbley WRE (Sheets 1 through 12)
NRCS (210-VI, May 2001) 1-1
Graves County
Construction Specification 1—Clearing
1. Scope The work shall consist of the clearing and disposal of trees, snags, logs, brush, shrubs, stumps, and rubbish from the designated areas.
2. Classification Unless otherwise specified in section 8, clearing will be classified according to the following definitions:
Class A—Requires that trees and other woody vegetation be removed so that the remaining stumps extend no higher than 4 inches above the ground surface.
Class B—Requires that trees and other woody vegetation be removed so that the remaining stumps extend no higher than 12 inches above the ground surface.
Class C—Requires that trees and other woody vegetation be removed as near the ground surface as conventional tools or field conditions will permit or as specified in section 8.
3. Protection of existing vegetation Trees and other woody vegetation designated to remain undisturbed shall be protected from damage throughout the entire construction period. Any damage resulting from the contractor's operations or neglect shall be repaired by the contractor.
Earthfill, stockpiling of materials, vehicular parking, and excessive foot or vehicular traffic shall not be allowed within the dripline of vegetation designated to remain in place. Vegetation damaged by any of these or similar actions shall be replaced with viable vegetation of the same species or as specified in section 8 and approved by the contracting officer.
Any cuts, skins, scrapes, or bruises to the bark of the vegetation shall be carefully trimmed and local nursery accepted procedures used to seal damaged bark.
Any limbs or branches 0.5-inch or larger in diameter that are broken, severed, or otherwise seriously damaged during construction shall be cut off at the base of the damaged limb or branch flush with the adjacent limb or tree trunk.
All roots 1 inch or larger in diameter that are cut, broken, or otherwise severed during construction operations shall have the end smoothly cut perpendicular to the root. Roots exposed during excavation or other operations shall be covered with moist earth and/or backfilled as soon as possible to prevent them from drying.
4. Marking The limits of the areas to be cleared will be marked by stakes, flags, tree markings, or other suitable methods. Trees to be left standing and uninjured will be designated by
NRCS (210-VI, May 2001) 1-2
Graves County special markings placed on the trunks at a height of about 6 feet above the ground surface.
5. Clearing All trees not marked for preservation and all snags, logs, brush, shrubs, stumps, rubbish, and similar materials shall be cleared from within the limits of the marked areas.
6. Disposal All materials cleared from the designated areas shall be disposed of at locations shown on the drawings or in a manner specified in section 8. The contractor is responsible for complying with all local rules and regulations and the payment of any and all fees that may result from the disposal at locations away from the construction location.
7. Measurement and payment Method 1—For items of work for which specific unit prices are established in the contract, the cleared area is measured to the nearest 0.1 acre. Payment for clearing is made for the total area within the designated limits at the contract unit price for the specified class of clearing. Such payment will constitute full compensation for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work.
Method 2—For items of work for which specific unit prices are established in the contract, the length of the cleared area is measured to the nearest full station (100 feet) along the line designated on the drawings or in the specifications. Payment for clearing is made for the total length within the designated limits at the contract unit price for the specified class of clearing. Such payment will constitute full compensation for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work.
Method 3—For items of work for which specific unit prices are established in the contract, the cleared areas are measured within the specified limits to the nearest 0.1 acre.
The cleared areas are determined by measuring the width cleared, within the specified limits, at representative sections and multiplying the average width between sections by the linear distance between sections. Payment for clearing is made at the contract unit price for the item and shall constitute full compensation for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work.
Method 4—For items of work for which specific lump sum prices are established in the contract, payment for clearing is made at the contract lump sum prices. Such payment shall constitute full compensation for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work.
All Methods—These provisions apply to all methods of measurement and payment.
Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary.
Such items and the items to which they are made subsidiary are identified in section 8.
NRCS (210-VI, May 2001) 1-3
8. Items of work and construction details
The items of work to be performed in conformance with this specification and construction details are:
a. Bid Item 1. Clearing
(1) This item shall consist of mowing (bush hogging) and clearing within the marked work limits. The bush hogging shall be completed prior to any excavation or earthfill. The approximate area to be cleared is 0.2 acres. The area to be cleared will be marked using stakes and flags.
(2) In Section 2, Classification, class “C” shall apply. The work consists of bush hogging the existing open areas to a height of not more than 6 inches.
(3) In Section 3, Protection of Existing Vegetation, any existing hardwood vegetation located in the fence rows or field borders shall not be bush hogged or disturbed. Any existing tree plantings outside of marked area shall not be disturbed.
(4) In Section 4, Marking, the areas to be cleared will be marked with wooden stakes and flags by NRCS personnel before any clearing should take place.
(5) In Section 7, Measurement and Payment, Method 1 will apply. The entire area shall be measured using handheld GPS unit to calculate the area for payment.
Chapter 2 National Standard Construction Specification Part 642 National Engineering Handbook
NRCS (210-VI-NEH, January 2014) 5–1
Graves County
Construction Specification 5—Pollution Control
1. Scope
The work consists of installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities.
The following BioPreferred® product categories are applicable to this specification:
— mulch and compost materials
— erosion control materials
— fertilizers
— dust suppressants
— agricultural spray adjuvants
2. Material
Silt fence shall conform to the requirement of Materials Specification 592, Geotextile. All other material furnished shall meet the requirements of the material specifications listed in section 8 of this specification.
3. Erosion and sediment control measures and works
The measures and works shall include, but are not limited to, the following:
Staging of earthwork activities—The excavation and moving of soil materials shall be scheduled to minimize the size of areas disturbed and unprotected from erosion for the shortest reasonable time.
Seeding—Seeding to protect disturbed areas shall occur as soon as reasonably possible following completion of that earthwork activity.
Mulching—Mulching to provide temporary protection of the soil surface from erosion.
Diversions—Diversions to divert water from work areas and to collect water from work areas for treatment and safe disposition. They are temporary and shall be removed and the area restored to its near original condition when the diversions are no longer required or when permanent measures are installed.
Stream crossings—Culverts or bridges where equipment must cross streams. They are temporary and shall be removed and the area restored to its near original condition when the crossings are no longer required or when permanent measures are installed.
Sediment basins—Sediment basins collect, settle, and eliminate sediment from eroding areas and prevent them from impacting properties and streams below the construction site(s). These basins are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Sediment filters—Straw bale filters or geotextile silt fences trap sediment from areas of limited runoff. Sediment filters shall be properly anchored to prevent erosion under or around them. Silt fences shall be installed and maintained in accordance with ASTM D6462. These filters are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Waterways—Waterways for the safe disposal of runoff from fields, diversions, and other structures or measures. These works are temporary and shall be removed and the area restored to its original condition when they are no longer required or when permanent measures are installed.
Other—Additional protection measures as specified in section 8 of this specification or required by Federal, State, or local government.
NRCS (210-VI-NEH, January 2014) 5–2
Graves County
4. Chemical pollution The contractor shall provide watertight tanks or barrels or construct a sump sealed with plastic sheets to collect and temporarily contain chemical pollutants, such as drained lubricating or transmission fluids, grease, soaps, concrete mixer washwater, or asphalt, produced as a by-product of the construction activities. Pollutants shall be disposed of in accordance with appropriate state and Federal regulations. At the completion of the construction work, tanks, barrels, and sumps shall be removed and the area restored to its original condition as specified in section 8 of this specification. Sump removal shall be conducted without causing pollution.
Sanitary facilities, such as chemical toilets, or septic tanks shall not be located next to live streams, wells, or springs. They shall be located at a distance sufficient to prevent contamination of any water source. At the completion of construction activities, facilities shall be disposed of without causing pollution as specified in section 8 of this specification.
5. Air pollution The burning of brush or slash and the disposal of other materials shall adhere to state and local regulations.
Fire prevention measures shall be taken to prevent the start or spreading of wildfires that may result from project activities. Firebreaks or guards shall be constructed and maintained at locations shown on the drawings.
All public access or haul roads used by the contractor during construction of the project shall be sprinkled or otherwise treated to fully suppress dust. All dust control methods shall ensure safe construction operations at all times. If chemical dust suppressants are applied, the material shall be a commercially available product specifically designed for dust suppression and the application shall follow manufacturer's requirements and recommendations. A copy of the product data sheet and manufacturer's recommended application procedures shall be provided to the engineer 5 working days before the first application.
6. Maintenance, removal, and restoration All pollution control measures and temporary works shall be adequately maintained in a functional condition for the duration of the construction period. All temporary measures shall be removed and the site restored to near original condition.
7. Measurement and payment Method 1—For items of work for which specific unit prices are established in the contract, each item is measured to the nearest unit applicable. Payment for each item is made at the contract unit price for that item. For water or chemical suppressant items used for dust control for which items of work are established in section 8 of this specification, measurement for payment will not include water or chemical suppressants that are used inappropriately or excessive to need. Such payment will constitute full compensation for the completion of the work.
Method 2—For items of work for which lump sum prices are established in the contract, payment is made as the work proceeds and supported by invoices presented by the contractor that reflect actual costs. If the total of all progress payments is less than the lump sum contract price for this item, the balance remaining for this item will be included in the final contract payment. Payment of the lump sum contract price will constitute full compensation for completion of the work.
Method 3—For items of work for which lump sum prices are established in the contract, payment will be prorated and provided in equal amounts on each monthly progress payment estimate. The number of months used for prorating shall be the number estimated to complete the work as outlined in the contractor's approved construction schedule. The final month's prorate amount will be provided with the final contract payment. Payment as described will constitute full compensation for completion of the work.
All Methods—The following provisions apply to all methods of measurement and payment. Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary. Such items, and the items to which they are made subsidiary, are identified in section 8 of this specification.
NRCS (210-VI-NEH, January 2014) 5–3
Graves County
8. Items of work and construction details
Items of work to be performed in conformance with this specification and the construction details therefore are:
a. Subsidiary Item, Pollution Control
(1) This item shall consist of all work necessary to control erosion and sediment pollution, chemical pollution and air pollution.
(2) The Contractor’s scheduling shall be made in a manner that will reduce adverse Environmental effects. Construction scheduling shall be revised when significant pollution can result due to his planned construction schedule.
(3) The Contractor shall perform his work in a manner that will reduce erosion and minimize sediments and other pollutants to the water and streams and create a minimum of air pollution consistent with standard construction operations.
(4) To the maximum extent practicable, all in stream work under this contract shall be performed during conditions of low flow.
(5) Measures shall be taken to prevent and control spills of fuels, lubricants, or other materials used in construction from entering the stream, drainage way, or water body.
(6) Should evidence of stream use or jurisdictional wetland impairment and/or violations of water quality standards occur as a result of this activity (either from a spill or other forms of water pollution), the Kentucky Division of Water shall be notified immediately and physical, chemical, or biological examination of the water course shall be conducted and reported. In such case(s), additional facilities or alternative measures may be required.
(7) In Section 5, Air Pollution, as necessary to control dust, water or other dust suppressors shall be applied to prevent excessively dusty conditions along haul and access roads.
(8) In Section 7, Measurement and Payment, separate payment will not be made for pollution control. Compensation will be considered as included in the payment for Bid Item 4, Stream Crossing and Bid Item 5, Stream Crossing.
NRCS (210-VI-NEH, Amend. 2, Sept. 2018) 6–1
Graves County
Construction Specification 6—Seeding, Sprigging, and Mulching
1. Scope The work consists of preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified.
The following BioPreferred® product categories are applicable to this specification:
— Mulch and compost materials
— Erosion control materials
— Fertilizers
— Agricultural spray adjuvants
2. Material Seed—All seed must conform to the current rules and regulations of the State where it is being used and must be from the latest crop available. It must meet or exceed the standard for purity and germination listed in section 7.
Seed must be labeled in accordance with State laws and U.S. Department of Agriculture rules and regulations under the Federal Seed Act in effect on the date of invitations for bids. Bag tag figures are evidence of purity and germination. No seed may be accepted with a test date of more than 9 months before the date of delivery to the site.
Seed that has become wet, moldy, or otherwise damaged in transit or storage will not be accepted. The percent of noxious weed seed allowable must be as defined in the current State laws relating to agricultural seeds. Each type of seed must be delivered in separate sealed containers and fully tagged unless an exception is granted in writing by the contracting officer.
Fertilizer—Unless otherwise specified, the fertilizer must be a commercial-grade fertilizer. It must meet the standard for grade and quality specified by State law. Where fertilizer is furnished from bulk storage, the contractor must furnish a supplier’s certification of analysis and weight. When required by the contract, a representative sample of the fertilizer must be furnished to the contracting officer for chemical analysis.
Inoculants—The inoculant for treating legume seeds must be a pure culture of nitrogen-fixing bacteria prepared specifically for the species and must not be used later than the date indicated on the container or as otherwise specified. A mixing medium, as recommended by the manufacturer, must be used to bond the inoculant to the seed. Two times the amount of the inoculant recommended by the manufacturer must be used, except that four times the amount must be used when seed is applied using a hydraulic seeder. Seed must be sown within 24 hours of treatment and must not remain in the hydraulic seeder longer than 4 hours.
Lime and other soil amendments—Lime must consist of standard ground agriculture limestone, or approved equivalent. Standard ground agriculture limestone is defined as ground limestone meeting current requirements of the State department of agriculture.
Other soil amendments must meet quality criteria and application requirements specified in section 7.
Mulch tackifiers—Asphalt emulsion tackifiers must conform to the requirements of ASTM D977, Specification for Emulsified Asphalt. The emulsified asphalt may be rapid setting, medium setting, or slow setting. Nonasphaltic tackifiers required because of environmental considerations must be as specified in section 7.
Straw mulch material—Straw mulch must consist of wheat, barley, oat or rye straw, hay, grass cut from native grasses, or other plants as specified in section 7. The mulch material must be air-dry, reasonably light in color, and must not be musty, moldy, caked, or otherwise of low quality. The use of mulch that contains noxious weeds is not permitted. The contractor must provide a method satisfactory to the contracting officer for determining weight of mulch furnished.
Other mulch materials—Mulching materials, such as wood cellulose fiber mulch, mulch tackifiers, synthetic fiber mulch, netting, and mesh may be required for specialized locations and conditions. These materials, when specified, must be accompanied by the manufacturer’s recommendations for methods of application.
NRCS (210-VI-NEH, Amend. 2, Sept. 2018) 6–2
Graves County
3. Seeding mixtures, sod, sprigs, and dates of planting The application rate per acre for seed mixtures, sprigs, or sod and date of seeding or planting must be as shown on the plans or as specified in section 7.
4. Seedbed preparation and treatment Areas to be treated must be dressed to a smooth, firm surface. On sites where equipment can operate on slopes safely, the seedbed must be adequately loosened (4 to 6 inches deep) and smoothed. Depending on soil and moisture conditions, disking or cultipacking, or both, may be necessary to properly prepare a seedbed. Where equipment cannot operate safely, the seedbed must be prepared by hand methods by scarifying to provide a roughened soil surface so that broadcast seed will remain in place.
If seeding is to be accomplished immediately following construction operations, seedbed preparation may not be required except on a compacted, polished, or freshly cut soil surface.
Rocks larger than 6 inches in diameter, trash, weeds, and other debris that will interfere with seeding or maintenance operations must be removed or disposed of as specified in section 7.
Seedbed preparation must be discontinued when soil moisture conditions are not suitable for the preparation of a satisfactory seedbed as determined by the responsible engineer.
5. Seeding, sprigging, fertilizing, mulching, and stabilizing All seeding or sprigging operations must be performed in such a manner that the seed or sprigs are applied in the specified quantities uniformly in the designated areas. The method and rate of seed application must be as specified in section 7. Unless otherwise specified, seeding or sprigging must be accomplished within 2 days after final grading is completed and approved.
Fertilizer, lime, and other soil amendments must be applied as specified in section 7. When specified, the fertilizer and soil amendments must be thoroughly incorporated into the soil immediately following surface application.
The rate, amount, and kind of mulching or mesh must be as specified in section 7. Mulches must be applied uniformly to the designated areas. They must be applied to areas seeded not later than 2 working days after seeding has been performed. Straw mulch material must be stabilized within 24 hours of application using a mulch crimper or equivalent anchoring tool or by a suitable tackifier. When the mulch crimper or equivalent anchoring tool is used, it must have straight blades and be the type manufactured expressly for and capable of firmly punching the mulch into the soil. Where the equipment can be safely operated, it must be operated on the contour. Hand methods must be used where equipment cannot safely operate to perform the work required.
The tackifier must be applied uniformly over the mulch material at the specified rate, or it must be injected into the mulch material as it is being applied. Mesh or netting stabilizing materials must be applied smoothly but loosely on the designated areas. The edges of these materials must be buried or securely anchored using spikes or staples as specified in section 7.
The contractor must maintain the mesh or netting areas until all work under the contract has been completed and accepted.
Maintenance must consist of the repair of areas damaged by water erosion, wind, fire, or other causes. Such areas must be repaired to reestablish the intended condition and to the design lines and grades required by the contract. The areas must be refertilized, reseeded, and remulched before the new application of the mesh or netting.
6. Measurement and payment Method 1—For items of work for which specific unit prices are established in the contract, each area treated is measured as specified in section 7 and the area is calculated to the nearest 0.1 acre. Payment for treatment is made at the contract unit price for the designated treatment, which will constitute full compensation for completion of the work.
When specified as an item of work, mesh or netting is measured to the nearest square yard of surface area covered and accepted.
Payment is made at the contract unit price and will constitute full compensation for completion of the work.
NRCS (210-VI-NEH, Amend. 2, Sept. 2018) 6–3
Graves County
Method 2—For items of work for which specific lump-sum prices are established in the contract, the quantity of work will not be measured for payment. Payment for this item is made at the contract lump-sum price for the item and constitutes full compensation for the completion of the work.
Method 3—For items of work for which lump-sum prices are established in the contract, payment is made as the work proceeds.
Progress payments are determined as specified in section 7. Payment of the lump sum contract price constitutes full compensation for completion of the work.
All Methods—The following provisions apply to all methods of measurement and payment. Compensation for any item of work described in the contract but not listed in the bid schedule is included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in section 7.
7. Items of work and construction details
a. Bid Item 2, Seeding and Mulching
This item shall consist of seeding and mulching all areas disturbed during restoration within the work limits and as designated by the COR.
1. In Section 2, Material, apply 120 pounds of nitrogen (N), 120 pounds of phosphorous (P2O5), and 120 pounds of potash (K2O) per acre on all areas to be seeded.
2. In Section 2, Material, apply 3 tons of Ag Lime per acre uniformly over seeded area.
3. In Section 2, Material; Section 3, Seeding Mixtures, Sod, Sprigs and Dates of Planting; Section 4, Seed Bed Preparation and Treatment; Section 5, Seeding, Sprigging Fertilizing, Mulching, and Stabilizing, Upon completion of the installation of the wetland restoration practices as concurred by the COR, Seed and Straw Mulch all disturbed areas in accordance with the proposed planting plan (Sheet 11).
4. In Section 6, Measurement and Payment, Method 1 shall apply.
NRCS (210-VI-NEH, May 2001) 8-1
Graves County
Construction Specification 8—Mobilization and Demobilization
The work consists of the mobilization and demobilization of the contractor's forces and equipment necessary for performing the work required under the contract. It does not include mobilization and demobilization for specific items of work for which payment is provided elsewhere in the contract. Mobilization will not be considered as work in fulfilling the contract requirements for commencement of work.
2. Equipment and material Mobilization shall include all activities and associated costs for transportation of contractor's personnel, equipment, and operating supplies to the site; establishment of offices, buildings, and other necessary general facilities for the contractor's operations at the site; premiums paid for performance and payment bonds including coinsurance and reinsurance agreements as applicable;
and other items specified in section 4 of this specification.
Demobilization shall include all activities and costs for transportation of personnel, equipment, and supplies not required or included in the contract from the site; including the disassembly, removal, and site cleanup of offices, buildings, and other facilities assembled on the site specifically for this contract.
This work includes mobilization and demobilization required by the contract at the time of award.
If additional mobilization and demobilization activities and costs are required during the performance of the contract as a result of changed, deleted, or added items of work for which the contractor is entitled to an adjustment in contract price, compensation for such costs will be included in the price adjustment for the item or items of work changed or added.
3. Payment Payment will be made as the work proceeds, after presentation of paid invoices or documentation of direct costs by the contractor showing specific mobilization and demobilization costs and supporting evidence of the charges of suppliers, subcontractors, and others. When the total of such payments is less than the lump sum contract price, the balance remaining will be included in the final contract payment. Payment of the lump sum contract price for mobilization and demobilization will constitute full compensation for completion of the work.
Payment will not be made under this item for the purchase costs of materials having a residual value, the purchase costs of materials to be incorporated in the project, or the purchase costs of operating supplies.
4. Items of work and construction details
Items of work to be performed in conformance with this specification and construction details are:
a. Bid Item 3, Mobilization and Demobilization
(1) These items shall consist of the mobilization and demobilization of the contractor’s forces and equipment as necessary for performing the work required under the contract.
NRCS (210-VI-NEH, May 2001) 11-1
Construction Specification 11—Removal of Water
The work consists of the removal of surface water and ground water as necessary to perform the construction required by the contract in accordance with the specifications. It shall include: (1) constructing, installing, building, and maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing, installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3) removing all such temporary works and equipment after their intended function is no longer required.
2. Diverting surface water The contractor shall install, maintain, and operate all cofferdams, channels, flumes, sumps, and all other temporary diversion and protective works needed to divert streamflow and other surface water through or around the construction site. Control of surface water shall be continuous during the period that damage to construction work could occur. Unless otherwise specified and/or approved, the diversion outlet shall be into the same drainageway that the water would have reached before being diverted.
The contractor shall furnish the contracting officer, in writing, a proposed plan for diverting surface water before beginning any construction activities for which a diversion is required, unless waived in section 8 of this specification. Acceptance of this plan or the waiving of the plan requirement will not relieve the contractor of the responsibilities related to this activity during the process of completing the work as specified.
3. Dewatering the construction site Foundations, cutoff trenches, and all other parts of the construction site shall be dewatered and kept free of standing water and muddy conditions as necessary for the proper execution of the work. The contractor shall furnish, install, operate, and maintain all drains, sumps, pumps, casings, well points, and all other equipment required to properly dewater the site as specified.
Dewatering systems that cause a loss of soil fines from the foundation areas will not be permitted.
The contractor shall furnish the contracting officer, in writing, a proposed plan for dewatering before commencing with any construction activity for which dewatering may be required, unless waived in section 8 of this specification. Acceptance of this plan or the waiving of the plan requirement will not relieve the contractor of the responsibilities for completing the specified work.
4. Dewatering borrow areas The contractor shall maintain all borrow areas free of surface water or otherwise provide for timely and effective removal of surface and subsurface water that accumulates within the borrow area, unless waived in section 8 of this specification. Borrow material shall be processed as necessary to achieve proper and uniform moisture content at the time of placement.
If pumping to dewater borrow areas is included as a bid item of work in the bid schedule, each pump discharge pipe shall be equipped with a water meter. The meter shall be such that the
NRCS (210-VI-NEH, May 2001) 11-2
Graves County measured quantity of water is accurate within 3 percent of the true quantity. The contractor shall provide necessary support to perform accuracy tests of the water meter when requested by the contracting officer.
5. Erosion and pollution control Removal of water from the construction site, including the borrow areas, shall be accomplished so that erosion and the transporting of sediment and other pollutants are minimized. Dewatering activities shall be accomplished in a manner that the water table water quality is not altered.
Pollution control activities shall not conflict with the requirements of Construction Specification 5, Pollution Control, if it is a part of this contract.
6. Removal of temporary works When temporary works are no longer needed, the contractor shall remove and return the area to a condition similar to that which existed before construction. Areas where temporary works were located shall be graded slightly for appearance with no obstruction to natural surface waterflows or the proper functioning and access to the works of improvement installed. The contractor shall exercise extreme care during the removal stages to minimize the loss of soil sediment and debris that was trapped during construction.
Pipes, casings, and any other material used to dewater the site shall be removed from temporary wells. The wells shall be filled to ground level with clean gravel or other suitable material approved by the contracting officer. The contractor shall exercise extreme care to prevent pollution of the ground water by these actions.
7. Measurement and payment Method 1—Items of work listed in the bid schedule for removal of water, diverting surface water, and dewatering construction sites and borrow areas are paid for at the contract lump sum prices.
Such payment will constitute full compensation for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work.
Method 2—Items of work listed in the bid schedule for removal of water, diverting surface water, dewatering construction sites, and dewatering borrow areas are paid for at the contract lump sum prices. Such payment will constitute full compensation for furnishing, installing, operating, and maintaining the necessary trenches, drains, sumps, pumps, and piping and for all labor, equipment, tools, and all other items necessary and incidental to the completion of the work. The exception is that additional payment for pumping to dewater borrow areas and the removal of water will be made as described in the following paragraph.
If pumping to dewater borrow areas is a contract bid item, payment is made at the contract unit price, which shall be the price per 1,000 gallons shown in the bid schedule. Such payment will constitute full compensation for pumping only. Compensation for equipment and preparation and for other costs associated with pumping is included in the lump sum payment for removal of water or the lump sum payment for dewatering the borrow areas. Payment is made only for
NRCS (210-VI-NEH, May 2001) 11-3
Graves County pumping that is necessary to dewater borrow areas that cannot be effectively drained by gravity or that must have the water table lowered to be usable as a suitable borrow source. Pumping for other purposes will not be included for payment under this item.
All Methods—The following provisions apply to all methods of measurement and payment.
Compensation for any item of work described in the contract, but not listed in the bid schedule is included in the payment for the contract line item to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in section 8 of this specification.
8. Items of work and construction details
The items of work to be performed in conformance with this specification and the construction details are:
a. Subsidiary Item, Removal of water
(1) This item consists of the diversion of surface water and dewatering of the construction site for construction of the specified work.
(2) In Section 2, Diverting Surface Water, the removal of standing or flowing water will be required as necessary for the proper execution of the work. The contractor is not required to furnish a written plan for diverting surface water.
(3) In Section 3, Dewatering the Construction Site, the contractor is not required to furnish a written plan for dewatering the construction site.
(4) In Section 7, Measurement and Payment, no separate payment will be made for removal of water. Compensation for this item will be included in payment for Bid Item 4, Stream Crossing and Bid Item 5, Stream Crossing.
NRCS (210-VI-NEH, Amend. 2, Sept. 2018) 61–1
Graves County
Construction Specification 61—Rock Riprap
1. Scope
The work consists of the construction of rock riprap revetments and blankets, including filter or bedding where specified.
2. Material Rock riprap must conform to the requirements of Material Specification 523, Rock for Riprap, or if so specified, must be obtained from designated sources. It must be free from dirt, clay, sand, rock fines, and other material not meeting the required gradation limits.
At least 30 days before rock is delivered from other than designated sources, the contractor must designate in writing the source from which rock material will be obtained and provide information satisfactory to the contracting officer that the material meets contract requirements. The contractor must provide the responsible engineer free access to the source for the purpose of obtaining samples for testing. The size and grading of the rock must be as specified in section 8.
Rock from approved sources must be excavated, selected, and processed to meet the specified quality and grading requirements at the time the rock is installed.
Based on a specific gravity of 2.65 (typical of limestone and dolomite) and assuming the individual rock is shaped midway between a sphere and a cube, typical size/weight relationships are:
Sieve size of rock
Approx. weight of rock
Weight of test pile
16 inches 300 pounds 6,000 pounds
11 inches 100 pounds 2,000 pounds
6 inches 15 pounds 300 pounds
When specified in section 8 or when it is necessary to verify the gradation of the rock riprap, a particle size analysis must be performed in accordance with ASTM D5519, Test Method A or B. The analysis must be performed at the work site on a test pile of representative rock. The mass of the test pile must be at least 20 times the mass of the largest rock in the pile. The results of the test are compared to the gradation required for the project. Test pile results that do not meet the construction specifications must be cause for the rock to be rejected. The test pile that meets contract requirements must be left on the job site as a sample for visual comparison.
The test pile must be used as part of the last rock riprap to be placed.
Filter or bedding aggregates when required must conform to Material Specification 521, Aggregates for Drainfill and Filters, unless otherwise specified. Geotextiles must conform to Material Specification 592, Geotextile.
3. Subgrade preparation The subgrade surface on which the rock riprap, filter, bedding, or geotextile is to be placed must be cut or filled and graded to the lines and grades shown on the drawings. When fill to subgrade lines is required, it must consist of approved material and must conform to the requirements of the specified class of earthfill.
Rock riprap, filter, bedding, or geotextile must not be placed until the foundation preparation is completed and the subgrade surface has been inspected and approved.
4. Equipment-placed rock riprap The rock riprap must be placed by equipment on the surface and to the depth specified. It must be installed to the full course thickness in one operation and in such a manner as to avoid serious displacement of the underlying material. The rock for riprap must be delivered and placed in a manner that ensures the riprap in place is reasonably homogeneous with the larger rocks uniformly
NRCS (210-VI-NEH, Amend. 2, Sept. 2018) 61–2
Graves County distributed and firmly in contact one to another with the smaller rocks and spalls filling the voids between the larger rocks. Some hand placing may be required to provide a neat and uniform surface.
Rock riprap must be placed in a manner to prevent damage to structures. Hand placing is required as necessary to prevent damage to any new and existing structures.
5. Hand placed rock riprap The rock riprap must be placed by hand on the surface and to the depth specified. It must be securely bedded with the larger rocks firmly in contact one to another without bridging. Spaces between the larger rocks must be filled with smaller rocks and spalls.
Smaller rocks must not be grouped as a substitute for larger rock. Flat slab rock must be laid on its vertical edge except where it is laid like paving stone and the thickness of the rock equals the specified depth of the riprap course.
6. Filter or bedding When the contract specifies filter, bedding, or geotextile beneath the rock riprap, the designated material must be placed on the prepared subgrade surface as specified. Compaction of filter or bedding aggregate is not required, but the surface of such material must be finished reasonably smooth and free of mounds, dips, or windrows.
7. Measurement and payment Method 1—For items of work for which specific unit prices are established in the contract, the quantity of each type of rock riprap placed within the specified limits is computed to the nearest ton by actual weight. The volume of each type of filter or bedding aggregate is measured within the specified limits and computed to the nearest cubic yard by the method of average cross-sectional end areas. For each load of rock riprap placed as specified, the contractor must furnish to the responsible engineer a statement-of-delivery ticket showing the weight to the nearest 0.1 ton.
Payment is made at the contract unit price for each type of rock riprap, filter, or bedding. Such payment is considered full compensation for completion of the work.
Method 2—For items of work for which specific unit prices are established in the contract, the quantity of each type of rock riprap placed within the specified limits is computed to the nearest 0.1 ton by actual weight. The quantity of each type of filter or bedding aggregate delivered and placed within the specified limits is computed to the nearest 0.1 ton. For each load of rock riprap placed as specified, the contractor must furnish to the engineer a statement-of-delivery ticket showing the weight to the nearest 0.1 ton. For each load of filter or bedding aggregate, the contractor must furnish to the responsible engineer a statement-of-delivery ticket showing the weight to the nearest 0.1 ton.
Payment is made at the contract unit price for each type of rock riprap, filter, or bedding. Such payment is considered full compensation for completion of the work.
Method 3—For items of work for which specific unit prices are established by the contract, the volume of each type of rock riprap and filter or bedding aggregate is measured within the specified limits and computed to the nearest cubic yard by the method of average cross-sectional end areas.
Payment is made at the contract unit price for each type of rock riprap, filter, or bedding. Such payment is considered full compensation for completion of the work.
Method 4—For items of work for which specific unit prices are established by the contract, the volume of each type of rock riprap, including filter and bedding aggregate, is measured within the specified limits and computed to the nearest cubic yard by the method of average cross-sectional end areas.
NRCS (210-VI-NEH, Amend. 2, Sept. 2018) 61–3
Graves County
Payment is made at the contract unit price for each type of rock riprap, including filter and bedding. Such payment is considered full compensation for completion of the work.
Method 5—For items of work for which specific unit prices are established by the contract, the quantity of each type of rock riprap placed within the specified limits is computed to the nearest ton by actual weight. For each load of rock for riprap placed as specified, the contractor must furnish to the responsible engineer a statement-of-delivery ticket showing the weight to the nearest 0.1 ton.
Payment is made at the contract unit price for each type of rock riprap, and includes compensation for any aggregate or geotextile installed as specified for filter or bedding. Such payment is considered full compensation for completion of the work.
Method 6—For items of work for which specific unit prices are established by the contract, the volume of each type of rock riprap is measured within the specified limits and computed to the nearest cubic yard by the method of average cross-sectional end areas.
Payment is made at the contract unit price for each type of rock riprap and includes compensation for any aggregate or geotextile installed as specified for filter or bedding. Such payment is considered full compensation for completion of the work.
All methods—The following provision applies to all methods of measurement and payment. Compensation for any item of work described in the contract, but not listed in the bid schedule, is included in the payment for the item of work to which it is made subsidiary. Such items and the items to which they are made subsidiary are identified in section 8.
No separate payment is made for testing the gradation of the test pile. Compensation for testing is included in the appropriate bid item for riprap.
8. Items of work and construction details Items of work to be performed in conformance with this specification and the construction details are:
a. Bid Item 4 & 5, Stream Crossing
1) This item shall consist of the furnishing and placing all material at the locations shown on the drawings and as determined during construction of stream crossing.
2) In Section 2, Material, The contractor does not need to supply in writing the source of material.
3) In section 4, Equipment-placed Rock Riprap, All material shall be equipment placed.
4) All materials shall be minimum of Kentucky Department of Transportation Class II riprap.
5) In Section 7, Measurement and Payment, Method 1 will apply. Compensation will be considered as included in the payment for Stream Crossing, Bid Item 4, and Stream Crossing, Bid Item 5. Such payment will constitute full compensation for related subsidiary items Pollution Control, Removal of Water, Geotextile, Warning Signs, Depth Marker, and Excavation Stream Crossing.
NRCS (210-VI-NEH, January 2014) 95–1
Construction Specification 95—Geotextile
This work consists of furnishing all material, equipment, and labor necessary for the installation of geotextiles.
2. Quality Geotextiles shall conform to the requirements of Material Specification 592 and this specification.
3. Storage Before use, the geotextile shall be stored in a clean, dry location out of direct sunlight, not subject to extremes of either hot or cold temperatures, and with the manufacturer's protective cover undisturbed. Receiving, storage, and handling at the job site shall be in accordance with the requirements listed in ASTM D 4873.
4. Surface preparation The surface on which the geotextile is to be placed shall be graded to the neat lines and grades as shown on the drawings. It shall be reasonably smooth and free of loose rock and clods, holes, depressions, projections, muddy conditions, and standing or flowing water (unless otherwise specified in section 7 of this specification).
5. Placement Before the geotextile is placed, the soil surface will be reviewed for quality assurance of the design and construction. The geotextile shall be placed on the approved prepared surface at the locations and in accordance with the details shown on the drawings and specified in section 7 of this specification. It shall be unrolled along the placement area and loosely laid, without stretching, in such a manner that it conforms to the surface irregularities when material or gabions are placed on or against it. The geotextile may be folded and overlapped to permit proper placement in designated area(s).
Method 1—The geotextile shall be joined by machine sewing using thread material meeting the chemical requirements for the geotextile fibers or yarn. Thread shall be polypropylene, polyester, or KevlarTM aramid thread, unless a specific thread type is specified. The thread shall consist of two parallel stitched rows at a spacing of about 1 inch and shall not cross (except for any required re-stitching). The stitching shall be a lock-type stitch. Each row of stitching shall be located a minimum of 2 inches from the geotextile edge. Unless otherwise specified, the seam tensile strength as measured according to ASTM D4884 shall be a minimum of 90 percent of the geotextile tensile strength in the weakest principal direction as measured according to ASTM D4632.
The geotextile shall be temporarily secured during placement of overlying material to prevent slippage, folding, wrinkling, or other displacement of the geotextile. Unless otherwise specified, methods of securing shall not cause punctures, tears, or other openings to be formed in the geotextile.
Method 2—The geotextile shall be joined by overlapping a minimum of 18 inches (unless otherwise specified) and secured against the underlying foundation material.
This is the start of the file's text. The full file is on GovTribe.