Attachment 1 Capabilities Questionnaire.docx
DOCX document 29 KB Posted
- Attached to
- SIOP Mid-Atlantic Regional IDIQ
- Solicitation number
- N6247024R0050
About this file
This document is a capabilities questionnaire for a Sources Sought notice regarding the Shipyard and Waterfront IDIQ contract opportunity N6247023R9006. The questionnaire requests general information about the firm including its unique entity ID, CAGE code, business name and address. It also asks whether the firm's core NAICS code is 541330 for Architectural, Engineering, and Related Services or another proposed code, and the firm's business size. Additional questions cover the firm's proposed product service codes, number of full-time personnel and their qualifications, business type designations, experience including highest valued contract and specific project types, ability to manage multiple concurrent projects, and prior military, federal and non-DoD project experience. The final section requests how the firm intends to arrange its contract proposal as a joint venture, sole contractor, prime or subcontractor. This capabilities questionnaire will be used to assess firm qualifications for the $240M Shipyard and Waterfront IDIQ contract opportunity issued by the Naval Facilities Engineering Command Mid-Atlantic region.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| amendment 1.pdf | ||
| Attachment 1 Capabilities Questionnaire.docx | DOCX document | |
| Attachment 2 Project Information Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOURCES SOUGHT – SHIPYARD AND WATERFRONT IDIQ N6247023R9006
ATTACHMENT 1: CAPABILITIES QUESTIONNAIRE
Use this form to provide general information. The space at the end of the form may be used to clarify any requested information. Please respond to all questions as completely as possible.
SECTION 1. GENERAL
Unique Entity ID: ____________________ CAGE Code: ____________________ A. Business Name: (Insert Business Name) B. Business Address: (Insert Business Address) C. Is your firm registered under the NAICS code 541330? (Yes or No).
a. If not, what NAICS code do you propose for this requirement and why? __________________
b. If so, indicate the business size in relation to the NAICS code 541330 and socioeconomic programs for which the firm qualifies. ___________________________ D. Proposed Product Service Code (PSC) is C219 -- ARCHITECT AND ENGINEERING- GENERAL: OTHERC211 -- ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING. Does your Firm propose another PSC? If so, please explain ________________________ E. Does your firm employ more than 15 full-time personnel? (Yes or No)
a. Capability (key personnel) to perform such work. Please list the number of architects and engineers on your staff:
| Disciplines (Licensed) |
| # of personnel |
Project Manager
Quality Control Manager
Architect
Interior Designer
Civil Engineer
Landscape Architect
Structural Engineer
Electrical EngineerMechanical Engineer
Electrical Engineer Mechanical Engineer
Geotechnical Engineer
Cost Engineer (Certified Cost Professional or equivalent)Fire Protection Engineer
Interior Designer (practicing certified or registered)Cost Engineer
Land Surveyor
Fire Protection Engineer
Planning and Scheduler Professional (PSP or equal)
Value Engineer (CVS or equivalent)
F. Responsible Point of Contact:
Name: (Insert Name) Telephone: (Insert Telephone Number) Email: (Insert Email Address)
SECTION 2. TYPE OF BUSINESS: (check all that apply) ________Small Business (SB) ________Service Disabled Veteran Owned SB (SDVOSB) ________ SBA certified Historically Underutilized Business Zone (HUBZone) SB ________ SBA certified Section 8(a) SB ________ SBA certified Women-Owned Small Business (WOSB) ________ Economically Disadvantaged Woman-Owned Small Business (EDWOSB) ________Other Than Small Business (Insert Type) ________________________ NOTE: Recent changes to the WOSB program. As of October 15, 2020, WOSB/EDWOSBs must be registered at beta.certify.sba.gov. WOSBs/EDWOSBs may no longer self-certify to establish qualification for WOSB/EDWOSB set-aside contracts. Contractors must be registered in SAM at time of bid/proposal due date. For more information on the definitions or requirements for these small business programs, refer to http://www.sba.gov.
EXPERIENCE:
1. Number of years/months executing AE projects performing services similar to those anticipated under this contract: ________years ________ months
2. Number of years/months executing US Government AE projects performing services similar to those anticipated under this contract: ________years ________months
3. What is your Firm’s highest dollar valued AE contract within the last five years?
4. The $240M Shipyard and Waterfront IDIQ may require work as follows. Select all that apply that the Firm has performed within the past five years:
a. Execution and delivery of Military Construction (MILCON) project documentation (DD Form 1391) Airfield Paving (Yes or No)
b. 1391 Charrettes Deployable Airbase Systems-Facilities, Equipment, and Vehicle (DABS-FEV) (Yes or No)
c. Design Charrettes, Design-Build (DB) Request for Proposal (RFP); Hangar (Yes or No)
d. Design-Bid-Build (DBB) Design contract documents Ground Vehicle Fuel Facility (Yes or No)
e. Technical surveys and reports including concept and engineering studies engineering modeling, site engineering investigations, topographic surveys, geotechnical investigations, hazardous material surveys, munitions of explosive concern (MEC) surveys, hydrographic surveys, and other Base Aircraft Operations Facility (Yes or No)
f. Construction cost estimates Explosive Ordnance Disposal (EOD) (Yes or No)
g. Collateral Equipment (CEQ) Buy Packages (Yes or No)
h. Comprehensive Interior Design (CID) including Structural Interior Design (SID) and Furniture, Fixtures, and Equipment (FF&E) (Yes or No)
i. Post Construction Award Services (PCAS), and criteria development and updates (United Facilities Criteria (UFC) and United Facilities Guide Specifications (UFGS) updates/consultation) for waterfront and shipyard type facilities (Yes or No)
5. Does your Firm have the ability to simultaneously manage multiple projects totaling $19M or more per year? (Yes or No)
6. How many $750K task orders can the firm successfully perform and manage at one time: Comment by Upton, Brandi J CIV USN NAVFAC MIDLANT NOR (USA): Seems low given the IDIQ value.
a. One task order
b. Two task orders
c. Three task orders
d. Four task orders
e. Five task orders
f. More than five task orders
7. Has the Firm designed multiple concurrent CONUS MILCON projects totaling at least $10M in AE contract value? (Yes or No)
a. If yes, indicate when and locations of projects.
8. The firm has performed these types of services within the past 5 years:
a. Military (engineering and design for renovation and repair of facilities and associated infrastructure on a DoD installation) (Yes or No)
b. Military (engineering and design for new facilities on a DoD installation) (Yes or No)
c. Federal (engineering and design for non-DoD) (Yes or No)
SECTION 3. CONTRACTOR ARRANGEMENT
Our firm will most likely be proposing on this IDIQ as a:
____Joint Venture with (Insert business name, business size, and cage code).
Refer to FAR subpart 9.6 for Government policy on teaming arrangements, as well as 8(a)Program regulations described in 13 CFR 124.513, HUBZone Program regulations described in 13 CFR 126.616, and Service-Disabled Veteran-Owned Program regulations described in FAR 19.1403(c) and 13 CFR 125.15(b).)
____Sole Contractor, self-performing 100% of the work ____Prime Contractor (Small Business), self-performing at least 50% of the work ____Prime Contractor (Small Business) performing at least 50% of the work with the following team member subcontractor(s) (Insert business name, business size, cage code, and work which will be subcontracted) (IAW FAR 52.219-14(e)(1), dated Sept 2021) ____Subcontractor, performing less than 50% of the work for (Insert business name, business size, cage code, and work which will be done) ____ Prime Contractor (Large Business) subcontracting more than 50% of the work (Insert business name, business size, cage code, and work which will be subcontracted) ____Other – explain_________________________
File details come from the government source that posted it. Updated .