Attachment 1- BOM.xlsx
XLSX spreadsheet 16 KB Posted
- Attached to
- PEPRO Communications Shelter-Wallowa Whitman NF
- Solicitation number
- 12760425Q0023
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Bill of Materials (BOM) for a communications shelter replacement project for the Wallowa-Whitman National Forest, part of the USDA Forest Service. The procurement involves manufacturing, delivering, and installing a 6x6 walk-in enclosure with a 68' lattice platform tower, including specific components such as solar mounting, cable entry systems, steel ballast, and tower-related infrastructure. The project is located in Baker City, Oregon, with precise GPS coordinates (N45 45' 19.9", W116 49' 33.86"), and involves demolishing an existing 100' tower.
The solicitation (12760425Q0023) is a firm-fixed-price purchase order under NAICS code 334220, requiring new equipment with no partial quotes accepted. The vendor must procure, deliver, and install all specified equipment within 24 months of contract award. Quotes are due by 09/24/2025 at 12:00 PM ET, with questions accepted until 09/08/2025 at 5:00 PM ET. The primary point of contact is Brian Houdak (541-371-1354), and quotes should be submitted to Derick Yara at derick.yara@usda.gov. The total project includes transportation, installation, and a 3% contract management fee.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Buckhorn Bill of Materials
| Shipping Information: Use one sheet per shipping location. | ||
| Unit Name to Ship to: | Wallowa-Whitman National Forest | |
| Point of Contact (Local SAT): | Brian Houdak Brian.Houdak@usda.gov | |
| Phone (Local SAT): | 541-371-1354 | |
| Street Address: | 3185 11th St | |
| City, State: | Baker City, OR | |
| Zip: | 97814 | |
| Additional Information needed for request. | ||
| Project Point of Contact (name and phone): | Brian Houdak 541-371-1354 | |
| Additional Technical Contact (name and phone), if applicable: | ||
| WR # or Incident Number: | WR20253980 | |
| Override/Job Code: | 1322/ITJVAA25 | |
| IAS PMO | Joe Bonaparte | |
| Q-CODE | N/A | |
| UIA | N/A | |
| BOC | 3290 | |
| AAP #: | RPSH | |
| POW Line Item # and Project Description | Buckhorn Communication Shelter Replacement | |
| COR, if applicable: | Jory Ingram, 252-931-0266 | |
| Comments: | Drive install: Lat: N45° 45' 19.9", Long: W116° 49' 33.86", Elevation 5365 ft. Door location: East, Tower: West to East, mast located West of building. |
| LINE | |||||
| ITEM | DESCRIPTION | Manufacturers Part Number | Unit of Issue | QTY | UNIT |
| PRICE | TOTAL |
PRICE
| 1 | SHELTER DESCRIPTION | |||||
| 2 | 6'x6' Walk-in Enclosure | EA | 1 | $ - 0 | ||
| 3 | INTERIOR LAYOUT | $ - 0 | ||||
| 4 | DC Layout - Solar System Voltage 12Vdc | EA | 1 | $ - 0 | ||
| 5 | Equipment rack | EA | 2 | $ - 0 | ||
| 6 | Battery Tray: on rack closest to wall | EA | 2 | $ - 0 | ||
| 7 | Rack Mounted Bussbar: on rack closest to Wall | EA | 1 | $ - 0 | ||
| 8 | Drain | EA | 1 | $ - 0 | ||
| 9 | First Aid Kit | EA | 1 | $ - 0 | ||
| 10 | POWER ENTRY | $ - 0 | ||||
| 11 | DC Entry - Solar System Voltage 12VDC | DUAL DC | EA | 1 | $ - 0 | |
| 12 | VENTILATION | $ - 0 | ||||
| 13 | Passive | EA | 1 | $ - 0 | ||
| 14 | TOWER | |||||
| 15 | 68' Lattice Platform Tower w/extension: (1) 872F-70 1/4 wave (75') & (1) ANT150F2 @ 70' | |||||
| 16 | Steel Tower Sections Galvanized | |||||
| 17 | Aluminum Top Tower Section Bead Blasted | |||||
| 18 | Hydraulic Raised | |||||
| 19 | PLATFORM | |||||
| 20 | Walk-In Steel Base Frame & Hardware, Galvanized | Price for Tower & Platform: | EA | 1 | $ - 0 | |
| 21 | ANCHORING | $ - 0 | ||||
| 22 | Steel Ballast (100#'s each) | EA | 48 | $ - 0 | ||
| 23 | Ufer Grounded Concrete Pad | EA | 24 | $ - 0 | ||
| 24 | Ramp access to platform | EA | 1 | $ - 0 | ||
| 25 | SOLAR MOUNTING | $ - 0 | ||||
| 26 | Roof and Wall Mount | EA | 1 | $ - 0 | ||
| 27 | Solar Bracket | EA | 2 | $ - 0 | ||
| 28 | CABLE ENTRY | $ - 0 | ||||
| 29 | Cable Entry Glands: LDF4, 2 cables per gland | EA | 2 | $ - 0 | ||
| 30 | Cable Entry Covers | EA | 7 | $ - 0 | ||
| 31 | Ice Shield | EA | 1 | $ - 0 | ||
| 32 | Tower Mounts | $ - 0 | ||||
| 34 | 4" JVJ's | EA | 4 | $ - 0 | ||
| 35 | STANDOFFS | $ - 0 | ||||
| 36 | Single 4" | EA | 2 | $ - 0 | ||
| 37 | 18" Double Steel Standoff | EA | 1 | $ - 0 | ||
| 38 | Fall Restraint | EA | 1 | $ - 0 | ||
| 39 | Site Specific Drawing | EA | 1 | $ - 0 | ||
| 42 | Transportation to R6 | EA | 1 | $ - 0 | ||
| 43 | Delivery Address: 3185 11th St Baker City, OR 97814. Contractor Offload Required | EA | 1 | $ - 0 | ||
| 44 | Staging area: Delivery Address for the Building & install site for Tower | $ - 0 | ||||
| 45 | Backhaul: 6x6 fiberglass shelter est. 3000 lbs. Foundaiton is to remain in place. | EA | 1 | $ - 0 | ||
| 46 | Tower Demo: Demo and backhaul 100' tower. Cut guy anchors to 18-inches below soil and backfill with native soil. Foundation is to remain in place. | EA | 1 | $ - 0 | ||
| 47 | Drive in Installation: N45° 45' 19.9", Long: W116° 49' 33.86", Elevation 5365 ft. Door location: East, Tower: West to East, mast located West of building. | EA | 1 | $ - 0 | ||
| 48 | Mob & Demob | EA | 1 | $ - 0 | ||
| 49 | Contract Management Fee | 3% | $ - 0 | |||
| 50 | GRAND TOTAL | $ - 0 |