Attachment 1 - Blank SOS_Tiger Shark.xlsx
XLSX spreadsheet 37 KB Posted
- Attached to
- DRYDOCK: USCGC TIGER SHARK DD FY2027
- Solicitation number
- 70Z08026QPBPL0040
About this file
This is a blank pricing schedule and foreseeable costs worksheet for drydock repairs to the USCGC Tiger Shark (WPB-87359) during FY2027. The pricing schedule contains 48 definite line items (D-001 through D-048) and 5 option items (O-002, O-010, O-013, O-016, O-017) covering comprehensive vessel maintenance and repairs including hull plating inspection and preservation, tank cleaning and inspection, propulsion system component renewal and realignment, bearing and shaft replacement, rudder assembly renewal, watertight closure assessment, electrical system inspection, HVAC system maintenance, cathodic protection anode renewal, drydock services, temporary support services, and sea trial support. The schedule also includes open and inspect repair provisions with separate labor rate and material markup/handling fee line items (OA/G-001 and OA/G-002), where contractors must enter their composite labor rate for 1,205 hours and a material markup/handling fee percentage against a base of $69,732.00.
The foreseeable costs worksheet requires contractors to calculate distance-related expenses for a 91-day drydock availability, including Port Engineer/Contracting Officer transportation via airfare or vehicle mileage (at $0.58 per mile for distances under 150 miles), per diem allowances for crew and government representatives based on location, cutter operational costs at $69.00 per nautical mile for round-trip transit, family separation allowances ($8.33 daily rate for eligible personnel), and crew home visit transportation. The template indicates a drydock facility location of 991 23rd Avenue, Gulfport, MS 39501, with a 91-day availability period and pre-calculated family separation allowances totaling $1,524.39. All pricing fields are blank templates for contractor completion.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 2 - Specification_Tiger Shark.pdf | ||
| 70Z08026QPBPL0040_SOL.pdf | ||
| Attachment 3 - SOW Addendum.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
PRICING SCHEDULE FOR:
Sorrell, Latoya N CIV DHS (USA): Contractor enters name here
USCGC TIGER SHARK (WPB-87359) DRYDOCK AVAILABILITY FY2027
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (Side Scan), Ultrasonic Testing | JOB | 1 | ||
| O-002 | Ultrasonic Thickness Measurements, Perform | JOB | 1 | ||
| D-003 | U/W Body, Preserve, 100 percent | JOB | 1 | ||
| D-004 | Hull Plating Freeboard, Preserve, 100 Percent | JOB | 1 | ||
| D-005 | Tank, Dirty Oil, Clean and Inspect | JOB | 1 | ||
| D-006 | Tank, Oily Water, Clean and Inspect | JOB | 1 | ||
| D-007 | Tanks, MP Fuel Service, Clean and Inspect | JOB | 1 | ||
| D-008 | Decks, Exterior (Main Deck), Preserve | JOB | 1 | ||
| D-009 | Superstructure, Preserve, 100% | JOB | 1 | ||
| O-010 | Capastic Fairing, Depth Sounder, Renew | JOB | 1 | ||
| D-011 | Watertight Closures, Assess | JOB | 1 | ||
| D-012 | Mast, Preserve (“100%”) – Contractor Interference Removal | JOB | 1 | ||
| O-013 | Main Engine/Reduction Gear, Realign | JOB | 1 | ||
| D-014 | Intermediate Water-Lubricated Propulsion Shaft Bearings, Renew | JOB | 1 | ||
| D-015 | Aft Water-Lubricated Propulsion Shaft Bearings, Renew | JOB | 1 | ||
| O-016 | Intermediate Bearing Carriers, Renew | JOB | 1 | ||
| O-017 | Aft Bearing Carriers, Renew | JOB | 1 | ||
| D-018 | Propulsion Shafts, Renew | JOB | 1 | ||
| D-019 | Stern Tube Interior Surfaces, Preserve, 100 Percent | JOB | 1 | ||
| D-020 | Propellers, Renew | JOB | 1 | ||
| D-021 | Electrical Power Distribution System, Thermographic Inspection, 450 VAC And Below | JOB | 1 | ||
| D-022 | Fathometer Transducer, Renew | JOB | 1 | ||
| D-023 | Speed Log, Skin Valve, Renew | JOB | 1 | ||
| D-024 | Ventilation System, Engine Room Supply and Exhaust Fan Assemblies, Clean and Inspect | JOB | 1 | ||
| D-025 | Ducting, HVAC System, Clean | JOB | 1 | ||
| D-026 | Sea Water System, Perform Maintenance | JOB | 1 | ||
| D-027 | Rudder Assemblies, Renew | JOB | 1 | ||
| D-028 | Stern Launch Door, Remove, Inspect and Reinstall | JOB | 1 | ||
| D-029 | Grey Water Holding Tanks, Clean and Inspect | JOB | 1 | ||
| D-030 | Sewage Holding Tanks, Clean and Inspect | JOB | 1 | ||
| D-031 | Grey Water Piping, Clean and Flush | JOB | 1 | ||
| D-032 | Sewage Piping, Clean and Flush | JOB | 1 | ||
| D-033 | Cathodic Protection/Zinc Anodes, Renew | JOB | 1 | ||
| D-034 | Drydock | JOB | 1 | ||
| D-035 | Temporary Services, Provide - Cutter | JOB | 1 | ||
| D-036 | Sea Trial Performance, Support, Provide | JOB | 1 | ||
| D-037 | Auxiliary Foundation(s), Renew | JOB | 1 | ||
| D-038 | Seawater Cooling Piping/Valves, Renew | JOB | 1 | ||
| D-039 | Critical Coated Surface(s), Preserve | JOB | 1 | ||
| D-040 | Carpeting, Renew | JOB | 1 | ||
| D-041 | Mooring Bits, Renew | JOB | 1 | ||
| D-042 | Flood Lights, Modify | JOB | 1 | ||
| D-043 | 24VDC Distribution System, Upgrade | JOB | 1 | ||
| D-044 | Intrusion Detection System, Replace | JOB | 1 | ||
| D-045 | Unmanned Space Ventilation Modify | JOB | 1 | ||
| D-046 | Cathodic Protection/Zinc Anode(s), Remove | JOB | 1 | ||
| D-047 | Fire Main Bleed Line, Modify | JOB | 1 | ||
| D-048 | Sewage Air Compressor, Remove | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | 0 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00Z | Laydays | Day | 5 | ||
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 | ||||
| Open and Inspect Repairs | |||||
| The Labor Rates and Material Markup/Handling Fee will be used throughout the life of the contract for all open and inspect repair items. The total extended price for both CLINs below are being used solely for the purposes of evaluating price. | |||||
| OA/G-001 | **Provide breakdown, as follows: |
Labor Rate Unit Price: $________; Quantity: 1,205; Unit of Issue: Hour; Extended Price: $____________ Sorrell, Latoya N CIV DHS (USA): Contractors will enter labor rate here.
| Hour | 1205 | $0.00 |
| OA/G-002 | Material Markup/Handling Fee |
Unit Price: $69,732.00; Quantity: 1; Unit of Issue: Percent ________%;
Extended Price: [$69,732.00 X percentage quoted]: $______________ $69,732.00 Percent Sorrell, Latoya N CIV DHS (USA): Contractors will enter material markup/handling fee here.
| $0.00 | ||
| Total Fixed Price Ceiling of Open and Inspect Repairs | $0.00 |
(4/3/2026)_x000D_ Rev-0 - Page &P of &N
Foreseeable Costs
| FORESEEABLE COST WORKSHEET | |
| USCGC TIGER SHARK (WPB-87359) | FY27 |
| Contractor's Name: | |
| The contractor shall fill-in all yellow labeled boxes below to determine their foreseeable costs. Please read all notes and headers of sections for instructions in completing this worksheet. |
| DISTANCE FACTORS FOR: 991 23rd Avenue, Gulfport, MS 39501 | |
| NAUTICAL MILES BASED ON ROUND-TRIP (TO AND FROM) | |
| NUMBER OF DAYS OF AVAILABILITY | 91 |
| (1) Port Engineer/COR Transportation: AIR TRAVEL | |
| (Applicable if > 50 miles from PE address |
(PE's desk location)
| A. Number of CG Representatives from NESU: | A= | 1 |
| B. The number of round trips between the contractor's facility and NESU | B= | 1 |
| C. A multiplied by B: | AxB=C= | 1 |
| D. Travel cost per trip: | D= |
Massey, Marc A CIV: Contractor shall utilize: https://www.gsa.gov/travel/plan-a-trip/transportation-airfare-rates-pov-rates-etc/airfare-rates-city-pair-program
| Contractor shall utilize either (1) the total dollar amount for commercial round-trip airfare if their dry dock is greater than 150 driving miles from the PE's homeport OR (2) Enter "0" if their dry dock is less than 150 driving miles from the PE's homeport. | E. C multiplied by D =E, if >50 miles from NESU otherwise N/A. | E= | $0.00 |
| (2) Port Engineer Transportation: CAR TRAVEL | |||
| A. Number of CG Representatives from NESU: | A= | 1 | |
| B. Number of Driving miles Round-trip between the COR office and contractors facility: | B= | ||
| C. Travel cost per driving mile (rate at $0.58 per mile) | $0.580 | $0.00 | |
| (3) PER DIEM: (Applicable >50 miles CREW + PE) | |||
| A. Number of Ship's Crew & Port Engineer | A= | 13 | |
| B. Total number of day(s) in drydock. | B= | 91 | |
| C. Per diem cost at place of performance, per day: (if < 50 miles, enter "0" for all below) | C= | $0.00 | |
| C.1.1. Enter Lodging Daily Per Diem Rate | |||
| C.2.1. Enter Meals & Incidentals Total Daily Rate | |||
| C.2.1.1. Enter Meals & Incidentals First & Last Day of Travel Daily Rate | |||
| D. AxBxC= D: (if >50 miles from NESU) | D= | $0.00 | |
| (4) PER DIEM: (Applicable >50 miles Contracting Officer Travel & Per Diem. KO location is Norfolk, VA 23510) | |||
| A. Number of KO authorized travel: | A= | 1 | |
| B. Total number of KO travel days: | B= | 3 | |
| C. Transportation cost for KO travel | C= |
Massey, Marc A CIV: Contractor shall utilize: https://www.gsa.gov/travel/plan-a-trip/transportation-airfare-rates-pov-rates-etc/airfare-rates-city-pair-program
| Contractor shall utilize either (1) the total dollar amount for commercial round-trip airfare if their dry dock is greater than 150 miles from the KO's location in Norfolk, VA 23510 or (2) Enter "0" if their dry dock is less than 150 miles from the PE's homeport. | D. Per diem cost at place of performance, per day | D= | $0.00 |
| D.1.1. Enter Lodging Per Diem Rate | |||
| D.2.1. Enter Meals & Incidentals Total Daily Rate | |||
| D.2.1.1. Enter Meals & Incidentals First & Last Day of Travel Daily Rate | |||
| E. A [(B*D) + C] = | E= | $0.00 | |
| (5) CUTTER COST Operation Factors: | |||
| A. Round Trip Nautical Miles from the vessels pier to the contractors facility: | A= | 0 | |
| B. Cutter Cost Factor Per Nautical Mile: | B= | $69.00 | |
| C. A multiplied by B= C | C= | $0.00 | |
| (6) FAMILY SEPARATION ALLOWANCES (FSA) Applicable if > 50 miles from Homeport - for crew with dependents only (Daily Rate $8.33). If less than 50 miles enter 0 for A below. | |||
| A. Number of Personnel entitled to Family Separation Allowance: | A= | 3 |
Strawbridge, Tracey CIV: Do Not Change this cell unless Drydock is less than 50 driving miles from Homeport. Then enter 0.
| B. Number of Days for Availability minus 30 days if availability is greather than 30 days: | B= | 61 |
| C. A multiplied by B = C (Daily FSA rate of $8.33) | C= | $1,524.39 |
| (7) CREW TRANSPORTATION FOR HOME VISIT (Applicable after 31 consecutive days if > 50 miles from Homeport - for crew with dependents only | ||
| A. Number of Personnel (with dependents) entitled to HOME visit: | A= | 3 |
| B. Number of Homeport Visits: | B= | 2 |
| C Mileage to homeport = (Roundtrip Ticket Cost) | C= |
Massey, Marc A CIV: If contractor's facility is:
- located < 50 miles from the ship's homeport, enter $0.
- located > 51 miles but less than 149 miles from the ship's homeport, multiply round trip vehicle mileage by $0.58
- located > 150 miles from ship's homeport, utilize https://www.gsa.gov/travel/plan-a-trip/transportation-airfare-rates-pov-rates-etc/airfare-rates-city-pair-program Massey, Marc A CIV: Contractor enters name here Massey, Marc A CIV: Contractors shall utilize https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-lookup to estimate per diem rates Massey, Marc A CIV: Contractor will enter either (1) "0" if their dry dock is located less than 50 miles or more than 150 miles from the PE's homeport or (2) the total number of round trip driving miles if the contractor is located between 51 to 149 miles from PE's homeport.
Massey, Marc A CIV: Contractor shall utilize: https://nauticalcharts.noaa.gov/publications/docs/distances.pdf http://ports.com/sea-route/ Massey, Marc A CIV: Contractors shall utilize https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-lookup to estimate per diem rates based on the location of their facility.
Strawbridge, Tracey CIV: Do Not Change this cell unless Drydock is less than 50 driving miles from Homeport. Then enter 0.
| D. A multiplied by B, multiplied by C = D: | C= | $0.00 |
| GRAND TOTAL | ||
| 1. PE/COR Transportation (AIRFARE) | $0.00 | |
| 2. PE/COR Transportation (CAR) | $0.00 | |
| 3. Per Diem for Crew and PE/COR | $0.00 | |
| 4. Per Diem for Contracting Officer (KO) | $0.00 | |
| 5. Cutter Cost Operations Factors | $0.00 | |
| 6. Family Separation Allowance | $1,524.39 | |
| 7. Crew Transportation Home Visit | $0.00 | |
| Total Cost of Distance Factors: | $1,524.39 | |
| Total Contractor Quoted/Proposal Price: | $0.00 | |
| TOTAL EVALUATED QUOTE/PRICE | $1,524.39 |
File details come from the government source that posted it. Updated .