This document appears to be a pricing schedule for the USCGC Robert Ward unplanned drydock availability in fiscal year 2025. It includes a list of services to be provided, such as inspecting and repairing the propulsion shafting system, rudder assemblies, and stern tube interiors, as well as drydocking the cutter, providing temporary services, and supporting sea trials. The schedule provides unit prices and estimated quantities for these services, with a total price for the definite and optional items. The document also includes a foreseeable cost worksheet that outlines factors to be considered, such as transportation, per diem, and cutter operation costs. This pricing schedule is related to the federal contract opportunity for the USCGC Robert Ward unplanned drydock repairs in fiscal year 2025, with a period of performance from October 22, 2024, to November 19, 2024, and the place of performance being the contractor's facility.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 - SOW Spec_Rev.pdf | ||
| Amendment 0001.pdf | ||
| 70Z08024QPBPL0042_0_US.pdf | ||
| Attachment 2-SOW_Spec.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC ROBERT WARD (WPC-154) UNPLANNED DRYDOCK AVAILABILITY FY2025 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Propulsion Shafting System, Inspect and Repair | JOB | 1 | $0.00 | |
| D-002 | Rudder Assemblies, Inspect and Repair | JOB | 1 | $0.00 | |
| D-003 | Stern Tube Interiors, Repair & Preserve | JOB | 1 | $0.00 | |
| D-004 | Drydocking | JOB | 1 | $0.00 | |
| D-005 | Temporary Services, Provide - Cutter | JOB | 1 | $0.00 | |
| D-006 | Sea Trial Performance, Support, Provide | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 0 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 | ||||
| Over and Above/Growth Work | |||||
| The Unit Price Column will be used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The quantity shown is an estimate only and may be exceeded at the unit prices offered. | |||||
| OA/G-001 | **Provide breakdown, as follows: | Hour | 502 | $0.00 | |
| Over and Above/Growth Labor Rate | |||||
| Unit Price: $________; Quantity: 502; Unit of Issue: Hour; Extended Price: $____________ | |||||
| OA/G-002 | Over and Above/Growth Material Markup/Handling Fee | $23,700.00 | % | $0.00 | |
| Unit Price: $23,700.00; Quantity: 1; Unit of Issue: Percent ________%; | |||||
| Extended Price: [$23,700.00 X percentage quoted]: $______________ | |||||
| Total Price of Over and Above/Growth | $0.00 |
&C(7/12/2024) Draft-0 - Page &P of &N
Foreseeable Costs
| FORESEEABLE COST WORKSHEET | ||
| USCGC ROBERT WARD UPDD FY25 | FY25 | |
| Contractor's Name: | ||
| The contractor shall fill-in all yellow labeled boxes below to determine their foreseeable costs. Please read all notes and headers of sections for instructions in completing this worksheet. | ||
| 1001 S. Seaside Ave, San Pedro CA 90731 | ||
| NAUTICAL MILES BASED ON ROUND-TRIP (TO AND FROM) | ||
| NUMBER OF DAYS OF AVAILABILITY | 29 | |
| (1) Port Engineer/COR Transportation: AIR TRAVEL | ||
| (Applicable if > 50 miles from PE address |
(PE's desk location)
| A. Number of CG Representatives from NESU: | A= | 1 |
| B. The number of round trips between the contractor's facility and NESU | B= | 1 |
| C. A multiplied by B: | AxB=C= | 1 |
| D. Travel cost per trip: | D= | |
| E. C multiplied by D =E, if >50 miles from NESU otherwise N/A. | E= | $0.00 |
| (2) Port Engineer Transportation: CAR TRAVEL | ||
| A. Number of CG Representatives from NESU: | A= | 24 |
| B. Number of Driving miles Round-trip between the COR office and contractors facility: | B= | |
| C. Travel cost per driving mile (rate at $0.58 per mile) | $0.580 | $0.00 |
| (3) PER DIEM: (Applicable >50 miles CREW + PE) | ||
| A. Number of Ship's Crew & Port Engineer | A= | 25 |
| B. Total number of day(s) in drydock. | B= | 29 |
| C. Per diem cost at place of performance, per day: (if < 50 miles, enter "0" for all below) | C= | $0.00 |
| C.1.1. Enter Lodging Daily Per Diem Rate | ||
| C.2.1. Enter Meals & Incidentals Total Daily Rate | ||
| C.2.1.1. Enter Meals & Incidentals First Day of Travel Daily Rate | ||
| D. AxBxC= D: (if >50 miles from NESU) | D= | $0.00 |
| (4) PER DIEM: (Applicable >50 miles Contracting Officer Travel & Per Diem. KO location is Norfolk, VA 23510) | ||
| A. Number of KO authorized travel: | A= | 1 |
| B. Total number of KO travel days: | B= | 3 |
| C. Transportation cost for KO travel | C= | |
| D. Per diem cost at place of performance, per day | D= | $0.00 |
| D.1.1. Enter Lodging Per Diem Rate | ||
| D.2.1. Enter Meals & Incidentals Total Daily Rate | ||
| D.2.1.1. Enter Meals & Incidentals First & Last Day of Travel Daily Rate | ||
| E. A [(B*D) + C] = | E= | $0.00 |
| (5) CUTTER COST Operation Factors: | ||
| A. Round Trip Nautical Miles from the vessels pier to the contractors facility: | A= | 0 |
| B. Cutter Cost Factor Per Nautical Mile: | B= | $60.00 |
| C. A multiplied by B= C | C= | $0.00 |
| (6) FAMILY SEPARATION ALLOWANCES (FSA) Applicable if > 50 miles from Homeport - for crew with dependents only (Daily Rate $8.33). If less than 50 miles enter 0 for A below. | ||
| A. Number of Personnel entitled to Family Separation Allowance: | A= | 0 |
| B. Number of Days for Availability minus 30 days if availability is greather than 30 days: | B= | 0 |
| C. A multiplied by B = C (Daily FSA rate of $8.33) | C= | $0.00 |
| (7) CREW TRANSPORTATION FOR HOME VISIT (Applicable after 31 consecutive days if > 50 miles from Homeport - for crew with dependents only | ||
| A. Number of Personnel (with dependents) entitled to HOME visit: | A= | 0 |
| B. Number of Homeport Visits: | B= | 0 |
| C Mileage to homeport = (Roundtrip Ticket Cost) | C= | |
| D. A multiplied by B, multiplied by C = D: | C= | $0.00 |
| GRAND TOTAL | ||
| 1. PE/COR Transportation (AIRFARE) | $0.00 | |
| 2. PE/COR Transportation (CAR) | $0.00 | |
| 3. Per Diem for Crew and PE/COR | $0.00 | |
| 4. Cutter Cost Operations Factors | $0.00 | |
| 5. Family Separation Allowance | $0.00 | |
| 6. Crew Transportation Home Visit | $0.00 | |
| Total Cost of Distance Factors: | $0.00 | |
| Total Contractor Quoted/Proposal Price: | $0.00 | |
| TOTAL EVALUATED QUOTE/PRICE | $0.00 |
Contractor enters name here Contractor shall utilize: https://nauticalcharts.noaa.gov/publications/docs/distances.pdf http://ports.com/sea-route/ Contractor shall utilize: https://cpsearch.fas.gsa.gov/cpsearch/search.do.
Contractor shall utilize either (1) the total dollar amount for commercial round-trip airfare if their dry dock is greater than 150 driving miles from the PE's homeport OR (2) Enter "0" if their dry dock is less than 150 driving miles from the PE's homeport.
Contractor will enter either (1) "0" if their dry dock is located less than 50 miles or more than 150 miles from the PE's homeport or (2) the total number of round trip driving miles if the contractor is located between 51 to 149 miles from PE's homeport.
Contractors shall utilize https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-lookup to estimate per diem rates based on the location of their facility.
Contractor shall utilize: https://cpsearch.fas.gsa.gov/cpsearch/search.do. Contractor shall utilize either (1) the total dollar amount for commercial round-trip airfare if their dry dock is greater than 150 miles from the KO's location in Norfolk, VA 23510 or (2) Enter "0" if their dry dock is less than 150 miles from the PE's homeport.
Contractors shall utilize https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-lookup to estimate per diem rates Do Not Change this cell unless Drydock is less than 50 driving miles from Homeport. Then enter 0.
If contractor's facility is:
- located < 50 miles from the ship's homeport, enter $0.
- located > 51 miles but less than 149 miles from the ship's homeport, multiply round trip vehicle mileage by $0.58
- located > 150 miles from ship's homeport, utilize https://cpsearch.fas.gsa.gov/cpsearch/search.do.
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N