Attachment 1 - Bill of Materials.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- PEPRO Communications Shelter - Bridger-Teton NF
- Solicitation number
- 12760425Q0043
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Bill of Materials (BOM) for a communications shelter replacement project for the USDA Forest Service in the Bridger-Teton National Forest, located in Moran, Wyoming. The solicitation (Number 12760425Q0043) is a firm-fixed-price purchase order for new equipment, requiring manufacture, delivery, and installation of a complete communications infrastructure, including an 8x8 walk-in enclosure, 40-foot tower, solar power system, and associated technical components. The project specifics include precise geographical coordinates (Latitude 43N 49' 45.97", Longitude 110W 20' 59.42", Elevation: 7,705 ft), with specific requirements for tower construction, antenna placement, power systems, and site preparation.
The procurement requires comprehensive vendor capabilities, including equipment procurement, delivery, and installation within 18 months of contract award. Quotes are due by 07/01/2025 at 3:00 PM EST, with questions accepted until 06/23/2025 at 5:00 PM EST. The project involves removing existing leased telecommunication circuits, disconnecting commercial power, and complete site preparation. Key contacts include Molly Donoghue (solicitation point of contact), Jeffrey Leigh (local SAT contact), and Matthew Kershaw (project point of contact). The NAICS code for this opportunity is 334220, and no partial quotes will be considered. Quotes must be submitted directly to molly.donoghue@usda.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3 - Supplemental SOW.pdf | ||
| 12760425Q0043.pdf | ||
| Attachment 2 - Performance Work Statement.pdf | ||
| PEPRO Brand Name JA 12760425Q0043_Redacted.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Summary
| SITE | Region | BOM Amount | IAS Approver | BOC | Job Code | Unit | CIO Override/Job Code |
| Rosie's Ridge Comm Shelter Replacement | 4 | $ - 0 | Joe Bonaparte | 3290 | N/A | 0403 | 2505/ITJVAA25 |
| Total: | $ - 0 |
R4 Rosie's Ridge Bill of Materials
| Unit Name to Ship to: | Bridger-Teton NF | |
| Point of Contact (Local SAT): | JEFFREY LEIGH | |
| Phone (Local SAT): | 307-248-3998 | |
| Street Address: | 20250 Hwy 26/287 | |
| City, State: | Moran, WY | |
| Zip: | 83013 | |
| Additional Information needed for request. | ||
| Project Point of Contact (name and phone): | MATTHEW KERSHAW | |
| Additional Technical Contact (name and phone), if applicable: | 385-215-4957 | |
| WR# or Incident Number: | 20254762 | |
| Override/Job Code: | 2505/ITJVAA25 | |
| Q-Code | N/A | |
| IAS PMO | Joe Bonaparte | |
| UAI | N/A | |
| BOC | 3290 | |
| AAP# | RPSH | |
| POW Line Item # and Project Description | Rosie's Ridge Comm Shelter Replacement | |
| COR, if applicable: | ||
| Comments: | Drive-in install: Lat 43N 49' 45.97", Long 110W 20' 59.42", Elevation: 7705ft. Door location: East, Tower: West |
| LINE | |||||
| ITEM | DESCRIPTION | Manufacturers Part Number | Unit of Issue | QTY | UNIT |
| PRICE | TOTAL |
PRICE
| 1 | SHELTER DESCRIPTION | |||||
| 2 | 8x8 Walk-in Enclosure w/40' | EA | 1 | $ - 0 | $ - 0 | |
| 3 | INTERIOR LAYOUT | |||||
| 4 | AC/DC Layout (DC lights, AC outlets) | EA | 1 | $ - 0 | $ - 0 | |
| 5 | Equipment rack | EA | 1 | $ - 0 | $ - 0 | |
| 6 | Battery Tray | EA | 1 | $ - 0 | $ - 0 | |
| 7 | Rack Mounted Bussbar | EA | 1 | $ - 0 | $ - 0 | |
| 8 | Drain | EA | 1 | $ - 0 | $ - 0 | |
| 9 | First Aid Kit | EA | 1 | $ - 0 | $ - 0 | |
| 10 | POWER ENTRY | |||||
| 11 | AC/DC Entry (Solar Array Voltage: 12VDC) | AC/DC | EA | 1 | $ - 0 | $ - 0 |
| 12 | VENTILATION | |||||
| 13 | Passive | EA | 1 | $ - 0 | $ - 0 | |
| 14 | TOWER | |||||
| 15 | 40' (Schedule 80 required for the bottom section of tower. | EA | 1 | $ - 0 | $ - 0 | |
| 16 | Antennas: (1)ANT150 @40', (1) Sinclair SY303-SF1CNM(ABK) @40', (1) BA1012-0 @35', (1) DB224-A @25' | |||||
| 17 | ANCHORING | |||||
| 18 | Steel Ballast (100lbs each) | EA | 69 | $ - 0 | $ - 0 | |
| 19 | Long Outriggers | EA | 4 | $ - 0 | $ - 0 | |
| 20 | Ufer Grounded Concrete Pad | EA | 4 | $ - 0 | $ - 0 | |
| 21 | SOLAR | |||||
| 22 | Roof and Wall Mount | EA | 1 | $ - 0 | $ - 0 | |
| 23 | Solar Bracket | EA | 1 | $ - 0 | $ - 0 | |
| 24 | CABLE ENTRY | |||||
| 25 | Cable Entry Glands (Cable Type:LDF4 , 2-Holes per gland) | EA | 2 | $ - 0 | $ - 0 | |
| 26 | Cable Entry Covers | EA | 7 | $ - 0 | $ - 0 | |
| 27 | Ice Shield | EA | 1 | $ - 0 | $ - 0 | |
| 28 | JVJ | |||||
| 29 | JVJ 4" 180⁰ | EA | 3 | $ - 0 | $ - 0 | |
| 30 | STANDOFFS | |||||
| 31 | Single 4" | EA | 2 | $ - 0 | $ - 0 | |
| 32 | Double 18" | EA | 1 | $ - 0 | $ - 0 | |
| 33 | Fall Restraint | EA | 1 | $ - 0 | $ - 0 | |
| 34 | Site Specific Drawing | EA | 1 | $ - 0 | $ - 0 | |
| 35 | Transportation to R4 | EA | 1 | $ - 0 | $ - 0 | |
| 36 | Delivery Address: Offload required by vendor. | EA | 1 | $ - 0 | $ - 0 | |
| 37 | Drive-In Install: | EA | 1 | $ - 0 | $ - 0 | |
| 38 | Staging Area: Lat 43N 49' 48.87", Long 110W 20' 59.42", Elevation: 6,880ft. | |||||
| 39 | Extra Rental: Mine excavator, Breaker, Dump trailer | EA | 1 | $ - 0 | $ - 0 | |
| 40 | Backhaul: Demolition and backhaul to a landfill (1) 6'x6' CMU-type shelter | EA | 1 | $ - 0 | $ - 0 | |
| 41 | Removal of (3) existing leased telecom 4-wire circuits and disconnection of (1) commercial power from the backhaul | EA | 1 | $ - 0 | $ - 0 | |
| 42 | Mob & Demob | EA | 1 | $ - 0 | $ - 0 | |
| 43 | NOTES: | |||||
| 44 | Contract Management Fee | 0% | $ - 0 | |||
| 45 | GRAND TOTAL | $ - 0 |
File details come from the government source that posted it. Updated .