This document is a Bid Schedule for an Asbestos Abatement Indefinite Delivery Indefinite Quantity (IDIQ) contract solicitation. The contract is for the removal, encapsulation, and/or enclosure of asbestos, lead, and mold containing materials at Seymour Johnson Air Force Base, Blakeslee Air Force Recreation Area, and Dare County Bomb Range in North Carolina.
The Bid Schedule lists various line items for mobilization, sampling, facility inspections, asbestos/lead/mold abatement activities, and ongoing maintenance services. Pricing is requested for a base year and four option years. Additional details are provided on the performance requirements, including response times, labor categories, and unit of measure. The solicitation number is FA480924Q0102 and the agency is the Department of the Air Force Air Combat Command.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
BID SCHEDULE
FOR
| Abatement of Asbestos, Lead and Mold | |
| Solicitation # FA480924Q0102 | |
| Furnish all labor, tools, equipment, parts and materials necessary for the removal, encapsulation and or enclosure of asbestos, lead or mold containing or contaminated materials. Contractor is responsible for the disposal of abated materials in certified places. Areas of responsibility are Seymour Johnson AFB, Blakeslee Air Force Recreation area and Dare county bomb range, NC in accordance with the Statements of work. |
| Company Name |
| Company UEI # |
| The Quantities on this bid schedule consist of possible items that could be issued on a task order if the need arises. |
| Actual quantities ordered could be high or none. Order limitations are listed under FAR clause 52.216-19. |
| BASE YEAR: 27 SEP 2024 - 26 SEP 2025 | |||||
| Line | Description | Unit | Qty | Unit Price |
| 0001 | Mobilization to Base - Facility Inspection within 24hrs | Per Call | 1 | $0.00 |
| 0002 | Mobilization to Base - Facility Inspection within 72hrs | Per Call | 1 | $0.00 |
| 0003 | Mobilization to Base - Facility Inspection withing 14 days | Per Call | 1 | $0.00 |
| 0004 | Mobilization to Base - Abatement within 24hrs | Per Call | 1 | $0.00 |
| 0005 | Mobilization to Base - Abatement within 72hrs | Per Call | 1 | $0.00 |
| 0006 | Mobilization to Base - Abatement within 14 days | Per Call | 1 | $0.00 |
| 0007 | Lab Sample - Asbestos - Results within 2hr | Each | 1 | $0.00 |
| 0008 | Lab Sample - Asbestos - Results within Same Day | Each | 1 | $0.00 |
| 0009 | Lab Sample -Asbestos - Results within 2 business days | Each | 1 | $0.00 |
| 0010 | Lab Sample - Asbestos - Results within 3 business days | Each | 1 | $0.00 |
| 0011 | Lab Sample - Asbestos - Full TCLP (10 business days) | Each | 1 | $0.00 |
| 0012 | Lab Sample - Lead - Results within 2hr | Each | 1 | $0.00 |
| 0013 | Lab Sample - Lead - Results within Same Day | Each | 1 | $0.00 |
| 0014 | Lab Sample - Lead - Results within 2 business days | Each | 1 | $0.00 |
| 0015 | Lab Sample - Lead - Results within 3 business days | Each | 1 | $0.00 |
| 0016 | Lab Sample - Mold | Each | 1 | $0.00 |
| 0017 | Facility Inspection Asbestos - visual, sampling and report | Each | 1 | $0.00 |
| documentation, Up to 4 hours(Does not include lab fees) |
| 0018 | Facility Inspection Asbestos - visual, sampling and report | Each | 1 | $0.00 |
| documentation, Up to 8 hours(Does not include lab fees) |
| 0019 | Facility Inspection Lead by XRF-visual, sampling & report | Each | 1 | $0.00 |
| documentation, Up to 4 hours(Does not include lab fees) |
| 0020 | Facility Inspection Lead by XRF, up to 8 hours- visual, sampling & report | Each | 1 | $0.00 |
| documentation (Does not include lab fees) |
| 0021 | Facility Inspection Mold, up to 4 hours - visual, sampling and report | Each | 1 | $0.00 |
| documentation (Does not include lab fees) |
| 0022 | Facility Inspection Mold, up to 8 hours - visual, sampling and report | Each | 1 | $0.00 |
| documentation (Does not include lab fees) |
0023 Demolish Sheetrock, ACM (asbestos containing material), wall or ceiling S.F. (Square Foot) 1 $0.00
0024 Plaster-walls/ceiling on sheetrock or block S.F. 1 $0.00
0025 Plaster-walls/ceiling on wire S.F. 1 $0.00
0026 Acoustic tile, ceiling lay in or spline grid S.F. 1 $0.00
| 0027 | Acoustic tile, ceiling or wall glued on | S.F. | 1 | $0.00 |
| (Glued on block, concrete or sheet rock substrate) |
0028 Vinyl Asbestos Tile (VAT) removal S.F. 1 $0.00
0029 Non-regulated floor tile removal S.F. 1 $0.00
0030 Linoleum, sheeting, on wood S.F. 1 $0.00
0031 Linoleum, sheeting, on concrete S.F. 1 $0.00
0032 Linoleum, sheeting, on tile S.F. 1 $0.00
0033 Carpet-glued down, on asbestos containing flooring S.F. 1 $0.00
0034 Carpet-glued down, on non-asbestos containing flooring S.F. 1 $0.00
| 0035 | Carpet-held by tack strip (Remove carpet, tack strip | S.F. | 1 | $0.00 |
| and clean up damaged ACM) |
0036 Transite panel removal, interior S.F. 1 $0.00
0037 Transite panel removal, exterior S.F. 1 $0.00
0038 Mastic or adhesive, ACM on sheet rock wall or ceiling S.F. 1 $0.00
| 0039 | Mastic or adhesive, ACM, on block or concrete, located | S.F. | 1 | $0.00 |
| on walls or ceilings |
0040 Mastic or adhesive, ACM, on floor S.F. 1 $0.00
0041 Mastic or adhesive, latex or asphalt base S.F. 1 $0.00
0042 Textured, decorative, popcorn GWB (Gypsum Wall board) Coating, Ceiling S.F. 1 $0.00
0043 Textured, decorative, popcorn GWB Coating, Walls S.F. 1 $0.00
0044 Duct wrap insulation S.F. 1 $0.00
0045 Pipe Insulation – 2” diameter pipe or less L.F. (Linear Foot) 1 $0.00
0046 Pipe Insulation – 2-4” diameter pipe L.F. 1 $0.00
0047 Pipe Insulation – 4-8” diameter pipe or less L.F. 1 $0.00
0048 Pipe Insulation – 8” diameter pipe or greater L.F. 1 $0.00
0049 Canvas connector, HVAC unit to duct L.F. 1 $0.00
0050 Window or door caulking or glazing abatement L.F. 1 $0.00
0051 Asbestos Cement water pipe - 4" diameter or less L.F. 1 $0.00
0052 Asbestos Cement water pipe - 4-8" diameter L.F. 1 $0.00
0053 Asbestos Cement water pipe - 8-12" diameter L.F. 1 $0.00
0054 Asbestos Cement water pipe - 12-16" diameter L.F. 1 $0.00
0055 Asbestos Cement water pipe - 16-20" diameter L.F. 1 $0.00
| 0056 | Equipment or building materials ACM insulated (Items | C.Y (Cubic Yard) | 1 | $0.00 |
| to be disposed of with insulation in place as unit, Ex: | ||||
| expansion tanks,heat exchangers, piping, HVAC units) |
| 0057 | On Site worker – Abatement, Operation and | L.H. (Labor Hour) | 1 | $0.00 |
| Maintenance work (Normal working Hours) |
| 0058 | On Site worker – Abatement, Operation and | L.H. | 1 | $0.00 |
| Mantenance work (Nights, holidays, weekends) |
| 0059 | On Site Supervisor/Worker - Abatement, Operation & | L.H. | 1 | $0.00 |
| Maintenance work/supervision (Normal working Hours) |
| 0060 | On Site Supervisor/Worker - Abatement, Operation & | L.H. | 1 | $0.00 |
| Maintenance work/supervision (Nights, holidays, and | ||||
| weekends) |
| 0061 | Air monitoring professional (Daily area and/or PCM | Daily | 1 | $0.00 |
| clearance) **Daily is considered 1x during working hours of 7:30AM - 4:30PM |
| 0062 | Air monitoring professional (Pre, during and post | Daily | 1 | $0.00 |
| abatement, three day minimum) |
| 0063 | Mold cleaning, per person (Removal of mold off | L.H. | 1 | $0.00 |
| non-porous materials to include cleaning supplies | ||||
| & disposal) |
| 0064 | Mold cleaning, per person (Removal of mold off | Daily | 1 | $0.00 |
| non-porous materials to include cleaning supplies & | ||||
| & disposal) |
| 0065 | Mold removal, per person (Removal of mold | L.H. | 1 | $0.00 |
| contaminated building materials; include demolition | ||||
| supplies & disposal) |
| 0066 | Mold removal, per person (Removal of mold | Daily | 1 | $0.00 |
| contaminated building materials; include demolition | ||||
| supplies & disposal) |
0067 Lead Base Paint (LBP) removal from building substrates L.H. 1 $0.00
0068 Lead Base Paint (LBP) removal from building substrates Daily 1 $0.00
| 0069 | Lead Containing Paint (LBP) removal from building | L.H. | 1 | $0.00 |
| substrates |
| 0070 | Lead Containing Paint (LBP) removal from building | Daily | 1 | $0.00 |
| substrates |
| 0071 | Lead dust and contamination at Small Arms range | Monthly | 1 | $0.00 |
| Lead abatement (cleaning) monthly of the firing range(s) | ||||
| (two) include: Vacuum and mop range floor to remove | ||||
| lead dust, paper and target debris from the indoor | ||||
| ranges to reduce buildup of lead and debris | ||||
| contaminated with lead to reduce potential exposures | ||||
| to base and range personnel. Clean floors, backstops | ||||
| rooms behind backstop, and target retrieval system. | ||||
| Remove and replace 15, 30, and 55 gallon drums from | ||||
| both bullet traps containing lead/bullet residue. Fee | ||||
| includes equipment and supplies, bagging and labeling | ||||
| of material and transportation to on base facility for | ||||
| disposal. **This line item is not for a continual cleaning service. Task orders | ||||
| will be awarded on a per month basis to supplement current cleaning** |
| 0072 | Lead removal at Small Arms range | Monthly | 1 | $0.00 |
| Lead abatement (cleaning) monthly of the firing range(s) | ||||
| (two) includes: Vacuum and mop range floor to remove | ||||
| lead dust, paper and target debris from the indoor | ||||
| ranges to reduce buildup of lead and debris | ||||
| contaminated with lead to reduce potential exposures | ||||
| to base and range personnel. Clean floors, backstops | ||||
| rooms behind backstop, and target retieval system. | ||||
| Remove and replace 15, 30, and 55 gallon drums from | ||||
| both bullet traps containing lead/bullet residue. Inspect | ||||
| and replace Camfill Farr filters, dump strainers | ||||
| (materials) into disposal bags. Check and change HEPA | ||||
| filter on Caswell range, oil conveyor casing and chain | ||||
| test chain operation with conveyor moving for one | ||||
| minute and adjust as needed. Fee includes equipment | ||||
| and supplies, bagging and lableing of material and | ||||
| transportation to on base facility for disposal. | ||||
| **This line item is not for a continual cleaning service. Task orders will be awarded | ||||
| on a per month basis to supplement current cleaning** | ||||
| TOTAL | $0.00 |
| OY1 | $0.00 |
| OY2 | $0.00 |
| OY3 | $0.00 |
| OY4 | $0.00 |
| 6-month Option to Extend Services | $0.00 |
| Total Evaluated Price | $0.00 |
Option 1
BID SCHEDULE
FOR
| Abatement of Asbestos, Lead and Mold | |
| Solicitation # FA480924Q0102 | |
| Furnish all labor, tools, equipment, parts and materials necessary for the removal, encapsulation and or enclosure of asbestos, lead or mold containing or contaminated materials. Contractor is responsible for the disposal of abated materials in certified places. Areas of responsibility are Seymour Johnson AFB, Blakeslee Air Force Recreation area and Dare county bomb range, NC in accordance with the Statements of work. |
| Option Year 1: 27 SEP 2025 - 26 SEP 2026 | |||||
| Line | Description | Unit | Qty | Unit Price |
| 0001 | Mobilization to Base - Facility Inspection within 24hrs | Per Call | 1 | $0.00 |
| 0002 | Mobilization to Base - Facility Inspection within 72hrs | Per Call | 1 | $0.00 |
| 0003 | Mobilization to Base - Facility Inspection withing 14 days | Per Call | 1 | $0.00 |
| 0004 | Mobilization to Base - Abatement within 24hrs | Per Call | 1 | $0.00 |
| 0005 | Mobilization to Base - Abatement within 72hrs | Per Call | 1 | $0.00 |
| 0006 | Mobilization to Base - Abatement within 14 days | Per Call | 1 | $0.00 |
| 0007 | Lab Sample - Asbestos - Results within 2hr | Each | 1 | $0.00 |
| 0008 | Lab Sample - Asbestos - Results within Same Day | Each | 1 | $0.00 |
| 0009 | Lab Sample -Asbestos - Results within 2 business days | Each | 1 | $0.00 |
| 0010 | Lab Sample - Asbestos - Results within 3 business days | Each | 1 | $0.00 |
| 0011 | Lab Sample - Asbestos - Full TCLP (10 business days) | Each | 1 | $0.00 |
| 0012 | Lab Sample - Lead - Results within 2hr | Each | 1 | $0.00 |
| 0013 | Lab Sample - Lead - Results within Same Day | Each | 1 | $0.00 |
| 0014 | Lab Sample - Lead - Results within 2 business days | Each | 1 | $0.00 |
| 0015 | Lab Sample - Lead - Results within 3 business days | Each | 1 | $0.00 |
| 0016 | Lab Sample - Mold | Each | 1 | $0.00 |
| 0017 | Facility Inspection Asbestos - visual, sampling and report | Each | 1 | $0.00 |
| documentation, Up to 4 hours(Does not include lab fees) |
| 0018 | Facility Inspection Asbestos - visual, sampling and report | Each | 1 | $0.00 |
| documentation, Up to 8 hours(Does not include lab fees) |
| 0019 | Facility Inspection Lead by XRF-visual, sampling & report | Each | 1 | $0.00 |
| documentation, Up to 4 hours(Does not include lab fees) |
| 0020 | Facility Inspection Lead by XRF, up to 8 hours- visual, sampling & report | Each | 1 | $0.00 |
| documentation (Does not include lab fees) |
| 0021 | Facility Inspection Mold, up to 4 hours - visual, sampling and report | Each | 1 | $0.00 |
| documentation (Does not include lab fees) |
| 0022 | Facility Inspection Mold, up to 8 hours - visual, sampling and report | Each | 1 | $0.00 |
| documentation (Does not include lab fees) |
0023 Demolish Sheetrock, ACM (Asbestos Containing Material), wall or ceiling S.F. 1 $0.00
0024 Plaster-walls/ceiling on sheetrock or block S.F. 1 $0.00
0025 Plaster-walls/ceiling on wire S.F. 1 $0.00
0026 Acoustic tile, ceiling lay in or spline grid S.F. 1 $0.00
| 0027 | Acoustic tile, ceiling or wall glued on | S.F. | 1 | $0.00 |
| (Glued on block, concrete or sheet rock substrate) |
0028 Vinyl Asbestos Tile (VAT) removal S.F. 1 $0.00
0029 Non-regulated floor tile removal S.F. 1 $0.00
0030 Linoleum, sheeting, on wood S.F. 1 $0.00
0031 Linoleum, sheeting, on concrete S.F. 1 $0.00
0032 Linoleum, sheeting, on tile S.F. 1 $0.00
0033 Carpet-glued down, on asbestos containing flooring S.F. 1 $0.00
0034 Carpet-glued down, on non-asbestos containing flooring S.F. 1 $0.00
| 0035 | Carpet-held by tack strip (Remove carpet, tack strip | S.F. | 1 | $0.00 |
| and clean up damaged ACM) |
0036 Transite panel removal, interior S.F. 1 $0.00
0037 Transite panel removal, exterior S.F. 1 $0.00
0038 Mastic or adhesive, ACM on sheet rock wall or ceiling S.F. 1 $0.00
| 0039 | Mastic or adhesive, ACM, on block or concrete, located | S.F. | 1 | $0.00 |
| on walls or ceilings |
0040 Mastic or adhesive, ACM, on floor S.F. 1 $0.00
0041 Mastic or adhesive, latex or asphalt base S.F. 1 $0.00
0042 Textured, decorative, popcorn GWB (Gypsum wall board) Coating, Ceiling S.F. 1 $0.00
0043 Textured, decorative, popcorn GWB Coating, Walls S.F. 1 $0.00
0044 Duct wrap insulation S.F. 1 $0.00
0045 Pipe Insulation – 2” diameter pipe or less L.F. 1 $0.00
0046 Pipe Insulation – 2-4” diameter pipe L.F. 1 $0.00
0047 Pipe Insulation – 4-8” diameter pipe or less L.F. 1 $0.00
0048 Pipe Insulation – 8” diameter pipe or greater L.F. 1 $0.00
0049 Canvas connector, HVAC unit to duct L.F. 1 $0.00
0050 Window or door caulking or glazing abatement L.F. 1 $0.00
0051 Asbestos Cement water pipe - 4" diameter or less L.F. 1 $0.00
0052 Asbestos Cement water pipe - 4-8" diameter L.F. 1 $0.00
0053 Asbestos Cement water pipe - 8-12" diameter L.F. 1 $0.00
0054 Asbestos Cement water pipe - 12-16" diameter L.F. 1 $0.00
0055 Asbestos Cement water pipe - 16-20" diameter L.F. 1 $0.00
| 0056 | Equipment or building materials ACM insulated (Items | C.Y | 1 | $0.00 |
| to be disposed of with insulation in place as unit, Ex: | ||||
| expansion tanks,heat exchangers, piping, HVAC units) |
| 0057 | On Site worker – Abatement, Operation and | L.H. | 1 | $0.00 |
| Maintenance work (Normal working Hours) |
| 0058 | On Site worker – Abatement, Operation and | L.H. | 1 | $0.00 |
| Mantenance work (Nights, holidays, weekends) |
| 0059 | On Site Supervisor/Worker - Abatement, Operation & | L.H. | 1 | $0.00 |
| Maintenance work/supervision (Normal working Hours) |
| 0060 | On Site Supervisor/Worker - Abatement, Operation & | L.H. | 1 | $0.00 |
| Maintenance work/supervision (Nights, holidays, and | ||||
| weekends) |
| 0061 | Air monitoring professional (Daily area and/or PCM | Daily | 1 | $0.00 | |
| clearance) | **Daily is considered 1x during working hours of 7:30AM - 4:30PM |
| 0062 | Air monitoring professional (Pre, during and post | Daily | 1 | $0.00 |
| abatement, three day minimum) |
| 0063 | Mold cleaning, per person (Removal of mold off | L.H. | 1 | $0.00 |
| non-porous materials to include cleaning supplies | ||||
| & disposal) |
| 0064 | Mold cleaning, per person (Removal of mold off | Daily | 1 | $0.00 |
| non-porous materials to include cleaning supplies & | ||||
| & disposal) |
| 0065 | Mold removal, per person (Removal of mold | L.H. | 1 | $0.00 |
| contaminated building materials; include demolition | ||||
| supplies & disposal) |
| 0066 | Mold removal, per person (Removal of mold | Daily | 1 | $0.00 |
| contaminated building materials; include demolition | ||||
| supplies & disposal) |
0067 Lead Base Paint (LBP) removal from building substrates L.H. 1 $0.00
0068 Lead Base Paint (LBP) removal from building substrates Daily 1 $0.00
| 0069 | Lead Containing Paint (LBP) removal from building | L.H. | 1 | $0.00 |
| substrates |
| 0070 | Lead Containing Paint (LBP) removal from building | Daily | 1 | $0.00 |
| substrates |
| 0071 | Lead dust and contamination at Small Arms range | Monthly | 1 | $0.00 |
| Lead abatement (cleaning) monthly of the firing range(s) | ||||
| (two) include: Vacuum and mop range floor to remove | ||||
| lead dust, paper and target debris from the indoor | ||||
| ranges to reduce buildup of lead and debris | ||||
| contaminated with lead to reduce potential exposures | ||||
| to base and range personnel. Clean floors, backstops | ||||
| rooms behind backstop, and target retrieval system. | ||||
| Remove and replace 15, 30, and 55 gallon drums from | ||||
| both bullet traps containing lead/bullet residue. Fee | ||||
| includes equipment and supplies, bagging and labeling | ||||
| of material and transportation to on base facility for | ||||
| disposal. **This line item is not for a continual cleaning service. Task orders | ||||
| will be awarded on a per month basis to supplement current cleaning** |
| 0072 | Lead removal at Small Arms range | Monthly | 1 | $0.00 |
| Lead abatement (cleaning) monthly of the firing range(s) | ||||
| (two) includes: Vacuum and mop range floor to remove | ||||
| lead dust, paper and target debris from the indoor | ||||
| ranges to reduce buildup of lead and debris | ||||
| contaminated with lead to reduce potential exposures | ||||
| to base and range personnel. Clean floors, backstops | ||||
| rooms behind backstop, and target retieval system. | ||||
| Remove and replace 15, 30, and 55 gallon drums from | ||||
| both bullet traps containing lead/bullet residue. Inspect | ||||
| and replace Camfill Farr filters, dump strainers | ||||
| (materials) into disposal bags. Check and change HEPA | ||||
| filter on Caswell range, oil conveyor casing and chain | ||||
| test chain operation with conveyor moving for one | ||||
| minute and adjust as needed. Fee includes equipment | ||||
| and supplies, bagging and lableing of material and | ||||
| transportation to on base facility for disposal. | ||||
| **This line item is not for a continual cleaning service. Task orders will be awarded | ||||
| on a per month basis to supplement current cleaning** | ||||
| TOTAL | $0.00 |
Option 2
BID SCHEDULE
FOR
| Abatement of Asbestos, Lead and Mold | |
| Solicitation # FA480924Q0102 | |
| Furnish all labor, tools, equipment, parts and materials necessary for the removal, encapsulation and or enclosure of asbestos, lead or mold containing or contaminated materials. Contractor is responsible for the disposal of abated materials in certified places. Areas of responsibility are Seymour Johnson AFB, Blakeslee Air Force Recreation area and Dare county bomb range, NC in accordance with the Statements of work. |
| Option Year 2: 27 SEP 2026 - 26 SEP 2027 | |||||
| Line | Description | Unit | Qty | Unit Price |
| 0001 | Mobilization to Base - Facility Inspection within 24hrs | Per Call | 1 | $0.00 |
| 0002 | Mobilization to Base - Facility Inspection within 72hrs | Per Call | 1 | $0.00 |
| 0003 | Mobilization to Base - Facility Inspection withing 14 days | Per Call | 1 | $0.00 |
| 0004 | Mobilization to Base - Abatement within 24hrs | Per Call | 1 | $0.00 |
| 0005 | Mobilization to Base - Abatement within 72hrs | Per Call | 1 | $0.00 |
| 0006 | Mobilization to Base - Abatement within 14 days | Per Call | 1 | $0.00 |
| 0007 | Lab Sample - Asbestos - Results within 2hr | Each | 1 | $0.00 |
| 0008 | Lab Sample - Asbestos - Results within Same Day | Each | 1 | $0.00 |
| 0009 | Lab Sample -Asbestos - Results within 2 business days | Each | 1 | $0.00 |
| 0010 | Lab Sample - Asbestos - Results within 3 business days | Each | 1 | $0.00 |
| 0011 | Lab Sample - Asbestos - Full TCLP (10 business days) | Each | 1 | $0.00 |
| 0012 | Lab Sample - Lead - Results within 2hr | Each | 1 | $0.00 |
| 0013 | Lab Sample - Lead - Results within Same Day | Each | 1 | $0.00 |
| 0014 | Lab Sample - Lead - Results within 2 business days | Each | 1 | $0.00 |
| 0015 | Lab Sample - Lead - Results within 3 business days | Each | 1 | $0.00 |
| 0016 | Lab Sample - Mold | Each | 1 | $0.00 |
| 0017 | Facility Inspection Asbestos - visual, sampling and report | Each | 1 | $0.00 |
| documentation, Up to 4 hours(Does not include lab fees) |
| 0018 | Facility Inspection Asbestos - visual, sampling and report | Each | 1 | $0.00 |
| documentation, Up to 8 hours(Does not include lab fees) |
| 0019 | Facility Inspection Lead by XRF-visual, sampling & report | Each | 1 | $0.00 |
| documentation, Up to 4 hours(Does not include lab fees) |
| 0020 | Facility Inspection Lead by XRF, up to 8 hours- visual, sampling & report | Each | 1 | $0.00 |
| documentation (Does not include lab fees) |
| 0021 | Facility Inspection Mold, up to 4 hours - visual, sampling and report | Each | 1 | $0.00 |
| documentation (Does not include lab fees) |
| 0022 | Facility Inspection Mold, up to 8 hours - visual, sampling and report | Each | 1 | $0.00 |
| documentation (Does not include lab fees) |
0023 Demolish Sheetrock, ACM (Asbestos containing material), wall or ceiling S.F. 1 $0.00
0024 Plaster-walls/ceiling on sheetrock or block S.F. 1 $0.00
0025 Plaster-walls/ceiling on wire S.F. 1 $0.00
0026 Acoustic tile, ceiling lay in or spline grid S.F. 1 $0.00
| 0027 | Acoustic tile, ceiling or wall glued on | S.F. | 1 | $0.00 |
| (Glued on block, concrete or sheet rock substrate) |
0028 Vinyl Asbestos Tile (VAT) removal S.F. 1 $0.00
0029 Non-regulated floor tile removal S.F. 1 $0.00
0030 Linoleum, sheeting, on wood S.F. 1 $0.00
0031 Linoleum, sheeting, on concrete S.F. 1 $0.00
0032 Linoleum, sheeting, on tile S.F. 1 $0.00
0033 Carpet-glued down, on asbestos containing flooring S.F. 1 $0.00
0034 Carpet-glued down, on non-asbestos containing flooring S.F. 1 $0.00
| 0035 | Carpet-held by tack strip (Remove carpet, tack strip | S.F. | 1 | $0.00 |
| and clean up damaged ACM) |
0036 Transite panel removal, interior S.F. 1 $0.00
0037 Transite panel removal, exterior S.F. 1 $0.00
0038 Mastic or adhesive, ACM on sheet rock wall or ceiling S.F. 1 $0.00
| 0039 | Mastic or adhesive, ACM, on block or concrete, located | S.F. | 1 | $0.00 |
| on walls or ceilings |
0040 Mastic or adhesive, ACM, on floor S.F. 1 $0.00
0041 Mastic or adhesive, latex or asphalt base S.F. 1 $0.00
0042 Textured, decorative, popcorn GWB (Gypsum wall board) Coating, Ceiling S.F. 1 $0.00
0043 Textured, decorative, popcorn GWB Coating, Walls S.F. 1 $0.00
0044 Duct wrap insulation S.F. 1 $0.00
0045 Pipe Insulation – 2” diameter pipe or less L.F. 1 $0.00
0046 Pipe Insulation – 2-4” diameter pipe L.F. 1 $0.00
0047 Pipe Insulation – 4-8” diameter pipe or less L.F. 1 $0.00
0048 Pipe Insulation – 8” diameter pipe or greater L.F. 1 $0.00
0049 Canvas connector, HVAC unit to duct L.F. 1 $0.00
0050 Window or door caulking or glazing abatement L.F. 1 $0.00
0051 Asbestos Cement water pipe - 4" diameter or less L.F. 1 $0.00
0052 Asbestos Cement water pipe - 4-8" diameter L.F. 1 $0.00
0053 Asbestos Cement water pipe - 8-12" diameter L.F. 1 $0.00
0054 Asbestos Cement water pipe - 12-16" diameter L.F. 1 $0.00
0055 Asbestos Cement water pipe - 16-20" diameter L.F. 1 $0.00
| 0056 | Equipment or building materials ACM insulated (Items | C.Y | 1 | $0.00 |
| to be disposed of with insulation in place as unit, Ex: | ||||
| expansion tanks,heat exchangers, piping, HVAC units) |
| 0057 | On Site worker – Abatement, Operation and | L.H. | 1 | $0.00 |
| Maintenance work (Normal working Hours) |
| 0058 | On Site worker – Abatement, Operation and | L.H. | 1 | $0.00 |
| Mantenance work (Nights, holidays, weekends) |
| 0059 | On Site Supervisor/Worker - Abatement, Operation & | L.H. | 1 | $0.00 |
| Maintenance work/supervision (Normal working Hours) |
| 0060 | On Site Supervisor/Worker - Abatement, Operation & | L.H. | 1 | $0.00 |
| Maintenance work/supervision (Nights, holidays, and | ||||
| weekends) |
| 0061 | Air monitoring professional (Daily area and/or PCM | Daily | 1 | $0.00 | |
| clearance) | **Daily is considered 1x during working hours of 7:30AM - 4:30PM |
| 0062 | Air monitoring professional (Pre, during and post | Daily | 1 | $0.00 |
| abatement, three day minimum) |
| 0063 | Mold cleaning, per person (Removal of mold off | L.H. | 1 | $0.00 |
| non-porous materials to include cleaning supplies | ||||
| & disposal) |
| 0064 | Mold cleaning, per person (Removal of mold off | Daily | 1 | $0.00 |
| non-porous materials to include cleaning supplies & | ||||
| & disposal) |
| 0065 | Mold removal, per person (Removal of mold | L.H. | 1 | $0.00 |
| contaminated building materials; include demolition | ||||
| supplies & disposal) |
| 0066 | Mold removal, per person (Removal of mold | Daily | 1 | $0.00 |
| contaminated building materials; include demolition | ||||
| supplies & disposal) |
0067 Lead Base Paint (LBP) removal from building substrates L.H. 1 $0.00
0068 Lead Base Paint (LBP) removal from building substrates Daily 1 $0.00
| 0069 | Lead Containing Paint (LBP) removal from building | L.H. | 1 | $0.00 |
| substrates |
| 0070 | Lead Containing Paint (LBP) removal from building | Daily | 1 | $0.00 |
| substrates |
| 0071 | Lead dust and contamination at Small Arms range | Monthly | 1 | $0.00 |
| Lead abatement (cleaning) monthly of the firing range(s) | ||||
| (two) include: Vacuum and mop range floor to remove | ||||
| lead dust, paper and target debris from the indoor | ||||
| ranges to reduce buildup of lead and debris | ||||
| contaminated with lead to reduce potential exposures | ||||
| to base and range personnel. Clean floors, backstops | ||||
| rooms behind backstop, and target retrieval system. | ||||
| Remove and replace 15, 30, and 55 gallon drums from | ||||
| both bullet traps containing lead/bullet residue. Fee | ||||
| includes equipment and supplies, bagging and labeling | ||||
| of material and transportation to on base facility for | ||||
| disposal. **This line item is not for a continual cleaning service. Task orders | ||||
| will be awarded on a per month basis to supplement current cleaning** |
| 0072 | Lead removal at Small Arms range | Monthly | 1 | $0.00 |
| Lead abatement (cleaning) monthly of the firing range(s) | ||||
| (two) includes: Vacuum and mop range floor to remove | ||||
| lead dust, paper and target debris from the indoor | ||||
| ranges to reduce buildup of lead and debris | ||||
| contaminated with lead to reduce potential exposures | ||||
| to base and range personnel. Clean floors, backstops | ||||
| rooms behind backstop, and target retieval system. | ||||
| Remove and replace 15, 30, and 55 gallon drums from | ||||
| both bullet traps containing lead/bullet residue. Inspect | ||||
| and replace Camfill Farr filters, dump strainers | ||||
| (materials) into disposal bags. Check and change HEPA | ||||
| filter on Caswell range, oil conveyor casing and chain | ||||
| test chain operation with conveyor moving for one | ||||
| minute and adjust as needed. Fee includes equipment | ||||
| and supplies, bagging and lableing of material and | ||||
| transportation to on base facility for disposal. | ||||
| **This line item is not for a continual cleaning service. Task orders will be awarded | ||||
| on a per month basis to supplement current cleaning** | ||||
| TOTAL | $0.00 |
Option 3
BID SCHEDULE
FOR
| Abatement of Asbestos, Lead and Mold | |
| Solicitation # FA480924Q0102 | |
| Furnish all labor, tools, equipment, parts and materials necessary for the removal, encapsulation and or enclosure of asbestos, lead or mold containing or contaminated materials. Contractor is responsible for the disposal of abated materials in certified places. Areas of responsibility are Seymour Johnson AFB, Blakeslee Air Force Recreation area and Dare county bomb range, NC in accordance with the Statements of work. |
| Option Year 3: 27 SEP 2027 - 26 SEP 2028 | |||||
| Line | Description | Unit | Qty | Unit Price |
| 0001 | Mobilization to Base - Facility Inspection within 24hrs | Per Call | 1 | $0.00 |
| 0002 | Mobilization to Base - Facility Inspection within 72hrs | Per Call | 1 | $0.00 |
| 0003 | Mobilization to Base - Facility Inspection withing 14 days | Per Call | 1 | $0.00 |
| 0004 | Mobilization to Base - Abatement within 24hrs | Per Call | 1 | $0.00 |
| 0005 | Mobilization to Base - Abatement within 72hrs | Per Call | 1 | $0.00 |
| 0006 | Mobilization to Base - Abatement within 14 days | Per Call | 1 | $0.00 |
| 0007 | Lab Sample - Asbestos - Results within 2hr | Each | 1 | $0.00 |
| 0008 | Lab Sample - Asbestos - Results within Same Day | Each | 1 | $0.00 |
| 0009 | Lab Sample -Asbestos - Results within 2 business days | Each | 1 | $0.00 |
| 0010 | Lab Sample - Asbestos - Results within 3 business days | Each | 1 | $0.00 |
| 0011 | Lab Sample - Asbestos - Full TCLP (10 business days) | Each | 1 | $0.00 |
| 0012 | Lab Sample - Lead - Results within 2hr | Each | 1 | $0.00 |
| 0013 | Lab Sample - Lead - Results within Same Day | Each | 1 | $0.00 |
| 0014 | Lab Sample - Lead - Results within 2 business days | Each | 1 | $0.00 |
| 0015 | Lab Sample - Lead - Results within 3 business days | Each | 1 | $0.00 |
| 0016 | Lab Sample - Mold | Each | 1 | $0.00 |
| 0017 | Facility Inspection Asbestos - visual, sampling and report | Each | 1 | $0.00 |
| documentation, Up to 4 hours(Does not include lab fees) |
| 0018 | Facility Inspection Asbestos - visual, sampling and report | Each | 1 | $0.00 |
| documentation, Up to 8 hours(Does not include lab fees) |
| 0019 | Facility Inspection Lead by XRF-visual, sampling & report | Each | 1 | $0.00 |
| documentation, Up to 4 hours(Does not include lab fees) |
| 0020 | Facility Inspection Lead by XRF, up to 8 hours- visual, sampling & report | Each | 1 | $0.00 |
| documentation (Does not include lab fees) |
| 0021 | Facility Inspection Mold, up to 4 hours - visual, sampling and report | Each | 1 | $0.00 |
| documentation (Does not include lab fees) |
| 0022 | Facility Inspection Mold, up to 8 hours - visual, sampling and report | Each | 1 | $0.00 |
| documentation (Does not include lab fees) |
0023 Demolish Sheetrock, ACM (Asbestos containing material), wall or ceiling S.F. 1 $0.00
0024 Plaster-walls/ceiling on sheetrock or block S.F. 1 $0.00
0025 Plaster-walls/ceiling on wire S.F. 1 $0.00
0026 Acoustic tile, ceiling lay in or spline grid S.F. 1 $0.00
| 0027 | Acoustic tile, ceiling or wall glued on | S.F. | 1 | $0.00 |
| (Glued on block, concrete or sheet rock substrate) |
0028 Vinyl Asbestos Tile (VAT) removal S.F. 1 $0.00
0029 Non-regulated floor tile removal S.F. 1 $0.00
0030 Linoleum, sheeting, on wood S.F. 1 $0.00
0031 Linoleum, sheeting, on concrete S.F. 1 $0.00
0032 Linoleum, sheeting, on tile S.F. 1 $0.00
0033 Carpet-glued down, on asbestos containing flooring S.F. 1 $0.00
0034 Carpet-glued down, on non-asbestos containing flooring S.F. 1 $0.00
| 0035 | Carpet-held by tack strip (Remove carpet, tack strip | S.F. | 1 | $0.00 |
| and clean up damaged ACM) |
0036 Transite panel removal, interior S.F. 1 $0.00
0037 Transite panel removal, exterior S.F. 1 $0.00
0038 Mastic or adhesive, ACM on sheet rock wall or ceiling S.F. 1 $0.00
| 0039 | Mastic or adhesive, ACM, on block or concrete, located | S.F. | 1 | $0.00 |
| on walls or ceilings |
0040 Mastic or adhesive, ACM, on floor S.F. 1 $0.00
0041 Mastic or adhesive, latex or asphalt base S.F. 1 $0.00
0042 Textured, decorative, popcorn GWB (Gypsum wall board) Coating, Ceiling S.F. 1 $0.00
0043 Textured, decorative, popcorn GWB Coating, Walls S.F. 1 $0.00
0044 Duct wrap insulation S.F. 1 $0.00
0045 Pipe Insulation – 2” diameter pipe or less L.F. 1 $0.00
0046 Pipe Insulation – 2-4” diameter pipe L.F. 1 $0.00
0047 Pipe Insulation – 4-8” diameter pipe or less L.F. 1 $0.00
0048 Pipe Insulation – 8” diameter pipe or greater L.F. 1 $0.00
0049 Canvas connector, HVAC unit to duct L.F. 1 $0.00
0050 Window or door caulking or glazing abatement L.F. 1 $0.00
0051 Asbestos Cement water pipe - 4" diameter or less L.F. 1 $0.00
0052 Asbestos Cement water pipe - 4-8" diameter L.F. 1 $0.00
0053 Asbestos Cement water pipe - 8-12" diameter L.F. 1 $0.00
0054 Asbestos Cement water pipe - 12-16" diameter L.F. 1 $0.00
0055 Asbestos Cement water pipe - 16-20" diameter L.F. 1 $0.00
| 0056 | Equipment or building materials ACM insulated (Items | C.Y | 1 | $0.00 |
| to be disposed of with insulation in place as unit, Ex: | ||||
| expansion tanks,heat exchangers, piping, HVAC units) |
| 0057 | On Site worker – Abatement, Operation and | L.H. | 1 | $0.00 |
| Maintenance work (Normal working Hours) |
| 0058 | On Site worker – Abatement, Operation and | L.H. | 1 | $0.00 |
| Mantenance work (Nights, holidays, weekends) |
| 0059 | On Site Supervisor/Worker - Abatement, Operation & | L.H. | 1 | $0.00 |
| Maintenance work/supervision (Normal working Hours) |
| 0060 | On Site Supervisor/Worker - Abatement, Operation & | L.H. | 1 | $0.00 |
| Maintenance work/supervision (Nights, holidays, and | ||||
| weekends) |
| 0061 | Air monitoring professional (Daily area and/or PCM | Daily | 1 | $0.00 | |
| clearance) | **Daily is considered 1x during working hours of 7:30AM - 4:30PM |
| 0062 | Air monitoring professional (Pre, during and post | Daily | 1 | $0.00 |
| abatement, three day minimum) |
| 0063 | Mold cleaning, per person (Removal of mold off | L.H. | 1 | $0.00 |
| non-porous materials to include cleaning supplies | ||||
| & disposal) |
| 0064 | Mold cleaning, per person (Removal of mold off | Daily | 1 | $0.00 |
| non-porous materials to include cleaning supplies & | ||||
| & disposal) |
| 0065 | Mold removal, per person (Removal of mold | L.H. | 1 | $0.00 |
| contaminated building materials; include demolition | ||||
| supplies & disposal) |
| 0066 | Mold removal, per person (Removal of mold | Daily | 1 | $0.00 |
| contaminated building materials; include demolition | ||||
| supplies & disposal) |
0067 Lead Base Paint (LBP) removal from building substrates L.H. 1 $0.00
0068 Lead Base Paint (LBP) removal from building substrates Daily 1 $0.00
| 0069 | Lead Containing Paint (LBP) removal from building | L.H. | 1 | $0.00 |
| substrates |
| 0070 | Lead Containing Paint (LBP) removal from building | Daily | 1 | $0.00 |
| substrates |
| 0071 | Lead dust and contamination at Small Arms range | Monthly | 1 | $0.00 |
| Lead abatement (cleaning) monthly of the firing range(s) | ||||
| (two) include: Vacuum and mop range floor to remove | ||||
| lead dust, paper and target debris from the indoor | ||||
| ranges to reduce buildup of lead and debris | ||||
| contaminated with lead to reduce potential exposures | ||||
| to base and range personnel. Clean floors, backstops | ||||
| rooms behind backstop, and target retrieval system. | ||||
| Remove and replace 15, 30, and 55 gallon drums from | ||||
| both bullet traps containing lead/bullet residue. Fee | ||||
| includes equipment and supplies, bagging and labeling | ||||
| of material and transportation to on base facility for | ||||
| disposal. **This line item is not for a continual cleaning service. Task orders | ||||
| will be awarded on a per month basis to supplement current cleaning** |
| 0072 | Lead removal at Small Arms range | Monthly | 1 | $0.00 |
| Lead abatement (cleaning) monthly of the firing range(s) | ||||
| (two) includes: Vacuum and mop range floor to remove | ||||
| lead dust, paper and target debris from the indoor | ||||
| ranges to reduce buildup of lead and debris | ||||
| contaminated with lead to reduce potential exposures | ||||
| to base and range personnel. Clean floors, backstops | ||||
| rooms behind backstop, and target retieval system. | ||||
| Remove and replace 15, 30, and 55 gallon drums from | ||||
| both bullet traps containing lead/bullet residue. Inspect | ||||
| and replace Camfill Farr filters, dump strainers | ||||
| (materials) into disposal bags. Check and change HEPA | ||||
| filter on Caswell range, oil conveyor casing and chain | ||||
| test chain operation with conveyor moving for one | ||||
| minute and adjust as needed. Fee includes equipment | ||||
| and supplies, bagging and lableing of material and | ||||
| transportation to on base facility for disposal. | ||||
| **This line item is not for a continual cleaning service. Task orders will be awarded | ||||
| on a per month basis to supplement current cleaning** | ||||
| TOTAL | $0.00 |
Option 4
BID SCHEDULE
FOR
| Abatement of Asbestos, Lead and Mold | |
| Solicitation # FA480924Q0102 | |
| Furnish all labor, tools, equipment, parts and materials necessary for the removal, encapsulation and or enclosure of asbestos, lead or mold containing or contaminated materials. Contractor is responsible for the disposal of abated materials in certified places. Areas of responsibility are Seymour Johnson AFB, Blakeslee Air Force Recreation area and Dare county bomb range, NC in accordance with the Statements of work. |
| Option Year 4: 27 SEP 2028 - 26 SEP 2029 | |||||
| Line | Description | Unit | Qty | Unit Price |
| 0001 | Mobilization to Base - Facility Inspection within 24hrs | Per Call | 1 | $0.00 |
| 0002 | Mobilization to Base - Facility Inspection within 72hrs | Per Call | 1 | $0.00 |
| 0003 | Mobilization to Base - Facility Inspection withing 14 days | Per Call | 1 | $0.00 |
| 0004 | Mobilization to Base - Abatement within 24hrs | Per Call | 1 | $0.00 |
| 0005 | Mobilization to Base - Abatement within 72hrs | Per Call | 1 | $0.00 |
| 0006 | Mobilization to Base - Abatement within 14 days | Per Call | 1 | $0.00 |
| 0007 | Lab Sample - Asbestos - Results within 2hr | Each | 1 | $0.00 |
| 0008 | Lab Sample - Asbestos - Results within Same Day | Each | 1 | $0.00 |
| 0009 | Lab Sample -Asbestos - Results within 2 business days | Each | 1 | $0.00 |
| 0010 | Lab Sample - Asbestos - Results within 3 business days | Each | 1 | $0.00 |
| 0011 | Lab Sample - Asbestos - Full TCLP (10 business days) | Each | 1 | $0.00 |
| 0012 | Lab Sample - Lead - Results within 2hr | Each | 1 | $0.00 |
| 0013 | Lab Sample - Lead - Results within Same Day | Each | 1 | $0.00 |
| 0014 | Lab Sample - Lead - Results within 2 business days | Each | 1 | $0.00 |
| 0015 | Lab Sample - Lead - Results within 3 business days | Each | 1 | $0.00 |
| 0016 | Lab Sample - Mold | Each | 1 | $0.00 |
| 0017 | Facility Inspection Asbestos - visual, sampling and report | Each | 1 | $0.00 |
| documentation, Up to 4 hours(Does not include lab fees) |
| 0018 | Facility Inspection Asbestos - visual, sampling and report | Each | 1 | $0.00 |
| documentation, Up to 8 hours(Does not include lab fees) |
| 0019 | Facility Inspection Lead by XRF-visual, sampling & report | Each | 1 | $0.00 |
| documentation, Up to 4 hours(Does not include lab fees) |
| 0020 | Facility Inspection Lead by XRF, up to 8 hours- visual, sampling & report | Each | 1 | $0.00 |
| documentation (Does not include lab fees) |
| 0021 | Facility Inspection Mold, up to 4 hours - visual, sampling and report | Each | 1 | $0.00 |
| documentation (Does not include lab fees) |
| 0022 | Facility Inspection Mold, up to 8 hours - visual, sampling and report | Each | 1 | $0.00 |
| documentation (Does not include lab fees) |
0023 Demolish Sheetrock, ACM (Asbestos containing material), wall or ceiling S.F. 1 $0.00
0024 Plaster-walls/ceiling on sheetrock or block S.F. 1 $0.00
0025 Plaster-walls/ceiling on wire S.F. 1 $0.00
0026 Acoustic tile, ceiling lay in or spline grid S.F. 1 $0.00
| 0027 | Acoustic tile, ceiling or wall glued on | S.F. | 1 | $0.00 |
| (Glued on block, concrete or sheet rock substrate) |
0028 Vinyl Asbestos Tile (VAT) removal S.F. 1 $0.00
0029 Non-regulated floor tile removal S.F. 1 $0.00
0030 Linoleum, sheeting, on wood S.F. 1 $0.00
0031 Linoleum, sheeting, on concrete S.F. 1 $0.00
0032 Linoleum, sheeting, on tile S.F. 1 $0.00
0033 Carpet-glued down, on asbestos containing flooring S.F. 1 $0.00
0034 Carpet-glued down, on non-asbestos containing flooring S.F. 1 $0.00
| 0035 | Carpet-held by tack strip (Remove carpet, tack strip | S.F. | 1 | $0.00 |
| and clean up damaged ACM) |
0036 Transite panel removal, interior S.F. 1 $0.00
0037 Transite panel removal, exterior S.F. 1 $0.00
0038 Mastic or adhesive, ACM on sheet rock wall or ceiling S.F. 1 $0.00
| 0039 | Mastic or adhesive, ACM, on block or concrete, located | S.F. | 1 | $0.00 |
| on walls or ceilings |
0040 Mastic or adhesive, ACM, on floor S.F. 1 $0.00
0041 Mastic or adhesive, latex or asphalt base S.F. 1 $0.00
0042 Textured, decorative, popcorn GWB (Gypsum wall board) Coating, Ceiling S.F. 1 $0.00
0043 Textured, decorative, popcorn GWB Coating, Walls S.F. 1 $0.00
0044 Duct wrap insulation S.F. 1 $0.00
0045 Pipe Insulation – 2” diameter pipe or less L.F. 1 $0.00
0046 Pipe Insulation – 2-4” diameter pipe L.F. 1 $0.00
0047 Pipe Insulation – 4-8” diameter pipe or less L.F. 1 $0.00
0048 Pipe Insulation – 8” diameter pipe or greater L.F. 1 $0.00
0049 Canvas connector, HVAC unit to duct L.F. 1 $0.00
0050 Window or door caulking or glazing abatement L.F. 1 $0.00
0051 Asbestos Cement water pipe - 4" diameter or less L.F. 1 $0.00
0052 Asbestos Cement water pipe - 4-8" diameter L.F. 1 $0.00
0053 Asbestos Cement water pipe - 8-12" diameter L.F. 1 $0.00
0054 Asbestos Cement water pipe - 12-16" diameter L.F. 1 $0.00
0055 Asbestos Cement water pipe - 16-20" diameter L.F. 1 $0.00
| 0056 | Equipment or building materials ACM insulated (Items | C.Y | 1 | $0.00 |
| to be disposed of with insulation in place as unit, Ex: | ||||
| expansion tanks,heat exchangers, piping, HVAC units) |
| 0057 | On Site worker – Abatement, Operation and | L.H. | 1 | $0.00 |
| Maintenance work (Normal working Hours) |
| 0058 | On Site worker – Abatement, Operation and | L.H. | 1 | $0.00 |
| Mantenance work (Nights, holidays, weekends) |
| 0059 | On Site Supervisor/Worker - Abatement, Operation & | L.H. | 1 | $0.00 |
| Maintenance work/supervision (Normal working Hours) |
| 0060 | On Site Supervisor/Worker - Abatement, Operation & | L.H. | 1 | $0.00 |
| Maintenance work/supervision (Nights, holidays, and | ||||
| weekends) |
| 0061 | Air monitoring professional (Daily area and/or PCM | Daily | 1 | $0.00 | |
| clearance) | **Daily is considered 1x during working hours of 7:30AM - 4:30PM |
| 0062 | Air monitoring professional (Pre, during and post | Daily | 1 | $0.00 |
| abatement, three day minimum) |
| 0063 | Mold cleaning, per person (Removal of mold off | L.H. | 1 | $0.00 |
| non-porous materials to include cleaning supplies | ||||
| & disposal) |
| 0064 | Mold cleaning, per person (Removal of mold off | Daily | 1 | $0.00 |
| non-porous materials to include cleaning supplies & | ||||
| & disposal) |
| 0065 | Mold removal, per person (Removal of mold | L.H. | 1 | $0.00 |
| contaminated building materials; include demolition | ||||
| supplies & disposal) |
| 0066 | Mold removal, per person (Removal of mold | Daily | 1 | $0.00 |
| contaminated building materials; include demolition | ||||
| supplies & disposal) |
0067 Lead Base Paint (LBP) removal from building substrates L.H. 1 $0.00
0068 Lead Base Paint (LBP) removal from building substrates Daily 1 $0.00
| 0069 | Lead Containing Paint (LBP) removal from building | L.H. | 1 | $0.00 |
| substrates |
| 0070 | Lead Containing Paint (LBP) removal from building | Daily | 1 | $0.00 |
| substrates |
| 0071 | Lead dust and contamination at Small Arms range | Monthly | 1 | $0.00 |
| Lead abatement (cleaning) monthly of the firing range(s) | ||||
| (two) include: Vacuum and mop range floor to remove | ||||
| lead dust, paper and target debris from the indoor | ||||
| ranges to reduce buildup of lead and debris | ||||
| contaminated with lead to reduce potential exposures | ||||
| to base and range personnel. Clean floors, backstops | ||||
| rooms behind backstop, and target retrieval system. | ||||
| Remove and replace 15, 30, and 55 gallon drums from | ||||
| both bullet traps containing lead/bullet residue. Fee | ||||
| includes equipment and supplies, bagging and labeling | ||||
| of material and transportation to on base facility for | ||||
| disposal. **This line item is not for a continual cleaning service. Task orders | ||||
| will be awarded on a per month basis to supplement current cleaning** |
| 0072 | Lead removal at Small Arms range | Monthly | 1 | $0.00 |
| Lead abatement (cleaning) monthly of the firing range(s) | ||||
| (two) includes: Vacuum and mop range floor to remove | ||||
| lead dust, paper and target debris from the indoor | ||||
| ranges to reduce buildup of lead and debris | ||||
| contaminated with lead to reduce potential exposures | ||||
| to base and range personnel. Clean floors, backstops | ||||
| rooms behind backstop, and target retieval system. | ||||
| Remove and replace 15, 30, and 55 gallon drums from | ||||
| both bullet traps containing lead/bullet residue. Inspect | ||||
| and replace Camfill Farr filters, dump strainers | ||||
| (materials) into disposal bags. Check and change HEPA | ||||
| filter on Caswell range, oil conveyor casing and chain | ||||
| test chain operation with conveyor moving for one | ||||
| minute and adjust as needed. Fee includes equipment | ||||
| and supplies, bagging and lableing of material and | ||||
| transportation to on base facility for disposal. | ||||
| **This line item is not for a continual cleaning service. Task orders will be awarded | ||||
| on a per month basis to supplement current cleaning** | ||||
| TOTAL | $0.00 |
6 Month Extension
BID SCHEDULE
FOR
| Abatement of Asbestos, Lead and Mold | |
| Solicitation # FA480924Q0102 | |
| Furnish all labor, tools, equipment, parts and materials necessary for the removal, encapsulation and or enclosure of asbestos, lead or mold containing or contaminated materials. Contractor is responsible for the disposal of abated materials in certified places. Areas of responsibility are Seymour Johnson AFB, Blakeslee Air Force Recreation area and Dare county bomb range, NC in accordance with the Statements of work. |
| FAR 52.212-8 Extension: 27 SEP 2029 - 27 MAR 2030 | |||||
| Line | Description | Unit | Qty | Unit Price |
| 0001 | Mobilization to Base - Facility Inspection within 24hrs | Per Call | 1 | $0.00 |
| 0002 | Mobilization to Base - Facility Inspection within 72hrs | Per Call | 1 | $0.00 |
| 0003 | Mobilization to Base - Facility Inspection withing 14 days | Per Call | 1 | $0.00 |
| 0004 | Mobilization to Base - Abatement within 24hrs | Per Call | 1 | $0.00 |
| 0005 | Mobilization to Base - Abatement within 72hrs | Per Call | 1 | $0.00 |
| 0006 | Mobilization to Base - Abatement within 14 days | Per Call | 1 | $0.00 |
| 0007 | Lab Sample - Asbestos - Results within 2hr | Each | 1 | $0.00 |
| 0008 | Lab Sample - Asbestos - Results within Same Day | Each | 1 | $0.00 |
| 0009 | Lab Sample -Asbestos - Results within 2 business days | Each | 1 | $0.00 |
| 0010 | Lab Sample - Asbestos - Results within 3 business days | Each | 1 | $0.00 |
| 0011 | Lab Sample - Asbestos - Full TCLP (10 business days) | Each | 1 | $0.00 |
| 0012 | Lab Sample - Lead - Results within 2hr | Each | 1 | $0.00 |
| 0013 | Lab Sample - Lead - Results within Same Day | Each | 1 | $0.00 |
| 0014 | Lab Sample - Lead - Results within 2 business days | Each | 1 | $0.00 |
| 0015 | Lab Sample - Lead - Results within 3 business days | Each | 1 | $0.00 |
| 0016 | Lab Sample - Mold | Each | 1 | $0.00 |
| 0017 | Facility Inspection Asbestos - visual, sampling and report | Each | 1 | $0.00 |
| documentation, Up to 4 hours(Does not include lab fees) |
| 0018 | Facility Inspection Asbestos - visual, sampling and report | Each | 1 | $0.00 |
| documentation, Up to 8 hours(Does not include lab fees) |
| 0019 | Facility Inspection Lead by XRF-visual, sampling & report | Each | 1 | $0.00 |
| documentation, Up to 4 hours(Does not include lab fees) |
| 0020 | Facility Inspection Lead by XRF, up to 8 hours- visual, sampling & report | Each | 1 | $0.00 |
| documentation (Does not include lab fees) |
| 0021 | Facility Inspection Mold, up to 4 hours - visual, sampling and report | Each | 1 | $0.00 |
| documentation (Does not include lab fees) |
| 0022 | Facility Inspection Mold, up to 8 hours - visual, sampling and report | Each | 1 | $0.00 |
| documentation (Does not include lab fees) |
0023 Demolish Sheetrock, ACM (Asbestos containing material), wall or ceiling S.F. 1 $0.00
0024 Plaster-walls/ceiling on sheetrock or block S.F. 1 $0.00
0025 Plaster-walls/ceiling on wire S.F. 1 $0.00
0026 Acoustic tile, ceiling lay in or spline grid S.F. 1 $0.00
| 0027 | Acoustic tile, ceiling or wall glued on | S.F. | 1 | $0.00 |
| (Glued on block, concrete or sheet rock substrate) |
0028 Vinyl Asbestos Tile (VAT) removal S.F. 1 $0.00
0029 Non-regulated floor tile removal S.F. 1 $0.00
0030 Linoleum, sheeting, on wood S.F. 1 $0.00
0031 Linoleum, sheeting, on concrete S.F. 1 $0.00
0032 Linoleum, sheeting, on tile S.F. 1 $0.00
0033 Carpet-glued down, on asbestos containing flooring S.F. 1 $0.00
0034 Carpet-glued down, on non-asbestos containing flooring S.F. 1 $0.00
| 0035 | Carpet-held by tack strip (Remove carpet, tack strip | S.F. | 1 | $0.00 |
| and clean up damaged ACM) |
0036 Transite panel removal, interior S.F. 1 $0.00
0037 Transite panel removal, exterior S.F. 1 $0.00
0038 Mastic or adhesive, ACM on sheet rock wall or ceiling S.F. 1 $0.00
| 0039 | Mastic or adhesive, ACM, on block or concrete, located | S.F. | 1 | $0.00 |
| on walls or ceilings |
0040 Mastic or adhesive, ACM, on floor S.F. 1 $0.00
0041 Mastic or adhesive, latex or asphalt base S.F. 1 $0.00
0042 Textured, decorative, popcorn GWB (Gypsum wall board) Coating, Ceiling S.F. 1 $0.00
0043 Textured, decorative, popcorn GWB Coating, Walls S.F. 1 $0.00
0044 Duct wrap insulation S.F. 1 $0.00
0045 Pipe Insulation – 2” diameter pipe or less L.F. 1 $0.00
0046 Pipe Insulation – 2-4” diameter pipe L.F. 1 $0.00
0047 Pipe Insulation – 4-8” diameter pipe or less L.F. 1 $0.00
0048 Pipe Insulation – 8” diameter pipe or greater L.F. 1 $0.00
0049 Canvas connector, HVAC unit to duct L.F. 1 $0.00
0050 Window or door caulking or glazing abatement L.F. 1 $0.00
0051 Asbestos Cement water pipe - 4" diameter or less L.F. 1 $0.00
0052 Asbestos Cement water pipe - 4-8" diameter L.F. 1 $0.00
0053 Asbestos Cement water pipe - 8-12" diameter L.F. 1 $0.00
0054 Asbestos Cement water pipe - 12-16" diameter L.F. 1 $0.00
0055 Asbestos Cement water pipe - 16-20" diameter L.F. 1 $0.00
| 0056 | Equipment or building materials ACM insulated (Items | C.Y | 1 | $0.00 |
| to be disposed of with insulation in place as unit, Ex: | ||||
| expansion tanks,heat exchangers, piping, HVAC units) |
| 0057 | On Site worker – Abatement, Operation and | L.H. | 1 | $0.00 |
| Maintenance work (Normal working Hours) |
| 0058 | On Site worker – Abatement, Operation and | L.H. | 1 | $0.00 |
| Mantenance work (Nights, holidays, weekends) |
| 0059 | On Site Supervisor/Worker - Abatement, Operation & | L.H. | 1 | $0.00 |
| Maintenance work/supervision (Normal working Hours) |
| 0060 | On Site Supervisor/Worker - Abatement, Operation & | L.H. | 1 | $0.00 |
| Maintenance work/supervision (Nights, holidays, and | ||||
| weekends) |
| 0061 | Air monitoring professional (Daily area and/or PCM | Daily | 1 | $0.00 | |
| clearance) | **Daily is considered 1x during working hours of 7:30AM - 4:30PM |
| 0062 | Air monitoring professional (Pre, during and post | Daily | 1 | $0.00 |
| abatement, three day minimum) |
| 0063 | Mold cleaning, per person (Removal of mold off | L.H. | 1 | $0.00 |
| non-porous materials to include cleaning supplies | ||||
| & disposal) |
| 0064 | Mold cleaning, per person (Removal of mold off | Daily | 1 | $0.00 |
| non-porous materials to include cleaning supplies & | ||||
| & disposal) |
| 0065 | Mold removal, per person (Removal of mold | L.H. | 1 | $0.00 |
| contaminated building materials; include demolition | ||||
| supplies & disposal) |
| 0066 | Mold removal, per person (Removal of mold | Daily | 1 | $0.00 |
| contaminated building materials; include demolition | ||||
| supplies & disposal) |
0067 Lead Base Paint (LBP) removal from building substrates L.H. 1 $0.00
0068 Lead Base Paint (LBP) removal from building substrates Daily 1 $0.00
| 0069 | Lead Containing Paint (LBP) removal from building | L.H. | 1 | $0.00 |
| substrates |
| 0070 | Lead Containing Paint (LBP) removal from building | Daily | 1 | $0.00 |
| substrates |
| 0071 | Lead dust and contamination at Small Arms range | Monthly | 1 | $0.00 |
| Lead abatement (cleaning) monthly of the firing range(s) | ||||
| (two) include: Vacuum and mop range floor to remove | ||||
| lead dust, paper and target debris from the indoor | ||||
| ranges to reduce buildup of lead and debris | ||||
| contaminated with lead to reduce potential exposures | ||||
| to base and range personnel. Clean floors, backstops | ||||
| rooms behind backstop, and target retrieval system. | ||||
| Remove and replace 15, 30, and 55 gallon drums from | ||||
| both bullet traps containing lead/bullet residue. Fee | ||||
| includes equipment and supplies, bagging and labeling | ||||
| of material and transportation to on base facility for | ||||
| disposal. **This line item is not for a continual cleaning service. Task orders | ||||
| will be awarded on a per month basis to supplement current cleaning** |
| 0072 | Lead removal at Small Arms range | Monthly | 1 | $0.00 |
| Lead abatement (cleaning) monthly of the firing range(s) | ||||
| (two) includes: Vacuum and mop range floor to remove | ||||
| lead dust, paper and target debris from the indoor | ||||
| ranges to reduce buildup of lead and debris | ||||
| contaminated with lead to reduce potential exposures | ||||
| to base and range personnel. Clean floors, backstops | ||||
| rooms behind backstop, and target retieval system. | ||||
| Remove and replace 15, 30, and 55 gallon drums from | ||||
| both bullet traps containing lead/bullet residue. Inspect | ||||
| and replace Camfill Farr filters, dump strainers | ||||
| (materials) into disposal bags. Check and change HEPA | ||||
| filter on Caswell range, oil conveyor casing and chain | ||||
| test chain operation with conveyor moving for one | ||||
| minute and adjust as needed. Fee includes equipment | ||||
| and supplies, bagging and lableing of material and | ||||
| transportation to on base facility for disposal. | ||||
| **This line item is not for a continual cleaning service. Task orders will be awarded | ||||
| on a per month basis to supplement current cleaning** | ||||
| TOTAL | $0.00 |