Attachment 1 - Beluga EOD Escort PWS.pdf

PDF 196 KB Posted

Attached to
Beluga Explosive Ordnance Disposal Escort
Solicitation number
FA500024Q0050
Issued by

About this file

This document is a Performance Work Statement (PWS) for a federal contract opportunity to provide Explosive Ordnance Demolition (EOD) escort services in support of the U.S. Air Force and Joint Base Elmendorf-Richardson's (JBER) Cook Inlet beluga whale program in Alaska. The PWS outlines two key tasks: 1) Providing professional EOD escort services for up to 720 hours between May 1 and November 15 to accompany biologists conducting endangered species work in the Eagle River Flats Impact area, and 2) Providing a boat on trailer for up to 5 days if the Government-furnished vessel becomes inoperable. The contract has a 16-month period of performance, with 560 hours allocated to the first 12 months and 160 hours to the remaining 4 months. Contractors will invoice based on the hours of services rendered. The PWS includes specific vessel requirements and outlines the deliverables, including a field report due 30 days after the end of the field season.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 1 - Performance Work Statement

Management, Species, Beluga EOD Escort

Performance Work Statement Joint Base Elmendorf-Richardson, Alaska

Fiscal Year 2024 and 2025

1.0 Introduction

1.1 Description of Services

This Performance Work Statement (PWS) shall provide details of work to be performed in support of the U.S. Air Force and Joint Base Elmendorf-Richardson’s (JBER) Cook Inlet beluga whale (CIBW) program. Due to a sudden change in policy now requiring Explosive Ordnance Demolition (EOD) escort for all work in the impact area.

1.2 Background

Military training on JBER: The U.S. Air Force and U.S. Army, located on JBER, are mandated to train combat troops for global deployment. Part of the training requirements for the Army units currently stationed on JBER includes live fire training with high explosive (HE) mortar and artillery rounds. The only area on JBER approved for such training is the Eagle River Flats Impact area (ERF). High explosive rounds do not always detonate when fired, resulting in the deposition of unexploded ordnance (UXO) in impact areas like the ERF. UXO are potentially extremely hazardous, and safe operation requires support from experienced EOD personnel.

Marine mammals common on JBER: The 673d CES has several ongoing CIBW projects requiring access to and movement across ERF, both on land and from a boat in the river.

The projects concern three (3) species of marine mammals, the endangered Cook Inlet beluga whale, harbor porpoise, and harbor seal. These species make seasonal forays up to

4.2 km upstream, in Eagle River, within the ERF.

1.3 Legal Drivers

Requirement for EOD Escort in Duded Impact Area (e.g. ERF): Army Regulation 385-63 Range Safety dated 30 Jan 2012 paragraph 1-9,c, (7) empowers the Installation Range Control Officer (IRCO) to establish prerequisite precautions, such as escort by EOD or UXO-qualified personnel, for entry into an impact area. Pursuant to this Army regulation, JBER IRCO, Mr. Steven Thurmond, established the requirement for EOD escort for all work within ERF based on risk assessment, type of impact area, past activities of that impact area and historic requirement for access.

Endangered Marine Mammals: Conducting endangered and threatened species management is required by the Endangered Species Act, Public Law 106-65 (Military Land Withdrawal Act) as mitigation for the land withdrawal Legislative Environmental Impact Statement (LEIS) and Public Law 86-797 (Sikes Act). Conservation measures aimed at protection of CIBW, and their habitat that were included in the JBER Integrated Natural Resources Management Plan (INRMP) allowed the National Marine Fisheries Service

(NMFS) to exclude Eagle River from the proposed critical habitat ruling (74 Federal Register [FR] 230). Threatened and endangered species are protected under provisions of the Endangered Species Act of 1973, as amended (ESA) (16 U.S.C. 1531 et. seq.) Additionally, all marine mammals are protected by provisions of the Marine Mammal Protection Act of 1972 (MMPA), as amended (16 U.S.C. 1371(a)(5)). Furthermore, Section 7(a)(2) of the ESA requires that each federal agency ensure that any action authorized, funded, or carried out by such agency is not likely to jeopardize the continued existence of any endangered or threatened species, or result in the destruction or adverse modification of any critical habitat of such species.

2.0 Overview of Objectives

Task 1 EOD Escort- Provide professional EOD escort for CIBW work within ERF.

Task 2 Situational Contractor Boat Utilization- Provide a boat on trailer for use in the event the Government boat is unable to perform necessary CIBW work.

3.0 Scope

3.1 TASK 1: Management, Species, Beluga EOD Escort

Contractor shall provide professional services, material, and labor for escort, surface survey, and identification (all referred to as Escort) of munitions and explosives of concern (MEC) for ESA projects on JBER land, some of which may be highly vegetated, or water based to a depth of 18 inches. Escort is also required for work in Eagle River which is accomplished through a combination of travel via boat (primarily) and land.

A minimum of 100 hours up to 720 hours of Escort support is anticipated. The field season for which Escort support is needed is expected to be between 1 May and 15 November, depending on ice. For the 16-month performance period, 560 hours are allocated to the first 12-month period with 160 hours allocated to the remaining 4 months. Limited work may occur in the spring prior to May and in the winter after 15 November. Contractor will invoice based on the hours for services rendered.

Methods: The Contractor shall provide EOD Escort to 673rd CES staff (to include co-operators and volunteers working on CIBW projects) (i.e. accompany biologists into the field) and shall be responsible for protecting the individuals they are escorting from the health and safety hazards associated with MEC.

The Contractor shall locate surface munitions and explosives of concern (MEC) and subsurface anomalies as required to accomplish the ESA program task to ensure the risk from exposure to MEC is reduced. When the Contractor locates surface and subsurface anomalies, the contractor shall inform the staff being escorted, shall direct avoidance measures and retreat to a safe distance in accordance with (IAW) the approved deliberate risk assessment. Any MEC identified shall be marked by the Contractor to prevent incidental access or ground-disturbing activities. The Contractor shall be required to ride in Government‐furnished vehicles including highway vehicles, off road vehicles and watercraft, as well as assist in the operation of these vehicles if required. An exception to this would be in the event of the need to exercise Task 2, in which case the Contractor shall be required to ride in Contractor-furnished watercraft.

3.2 TASK 2: Management, Species, Beluga EOD Escort: Boat Support

Primarily CIBW work conducted by 673d CES and its co-operators is boat-based utilizing Government-furnished vessels. Occasionally those vessels have mechanical issues and cannot be safely operated. If the Government furnished vessels are rendered inoperable due to mechanical or safety reasons, the Contractor shall furnish an appropriate vessel (including trailer) for CIBW work for an outing of up to five (n=5) days. The total time for an individual outing is projected to be around 10 total hours. The Government will furnish a tow vehicle, an experienced boat captain and appropriate personal flotation devices (PFD’s) for 673d CES employees and co-operators (i.e. Contractor will supply PFD for Contractor personnel only). Contractor shall supply up to 15 gallons of fuel per day of operation.

Contractor will invoice based on the hours for services rendered.

Specific vessel requirements, depending on several factors (e.g. current environmental conditions, mission, etc.):

• Capable of safe operation in Knik Arm of Upper Cook Inlet, Alaska (huge tidal variation, high turbidity, strong currents, occasional medium to large amplitude standing, confused, short-period and steep-faced waves)

• Capable of safely stranding (accidentally going dry) during an ebb tide. For example, chine of hull not so steep that the vessel heels when dry to the point that subsequent flood water enters and swamps the vessel.

• Capable of safely maneuvering within a riverine channel at least (approximately) 30 feet wide by 3 feet deep (upper Eagle River, a relict side channel and Otter Creek).

• Capable of controlled, fine-scale maneuvers, both forward and in reverse, in heavy current. For example, an inboard boat with rudder would not satisfy this requirement.

• Equipped with required safety items in good working order.

• Maintained in good working order.

4.0 General Requirements

4.1 Contractor Government Access Requirements

4.1.1 The Contractor shall comply with applicable installation, facility, and area commander installation/facility access and local security policies and procedures. The Contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshall Office, Director of Emergency services, and/or Security Office.

4.1.2 The Contractor shall ensure that its employees, entering JBER installations or facilities, have obtained access badges and passes in accordance with facility regulations and that these badges and passes are obtained in advance so as not to delay the accomplishment of services.

4.1.3 The Contractor shall return all issued installation badges, including Defense Biometric Identification System (DBIDS) cards, and/or access passes to the Government Representative when the cooperative agreement is completed or when a Contractor employee no longer requires access to the installation or facility.

5.0 Deliverables and Schedule

5.1 Deliverables for all tasks are summarized below. (NOTE: All data gathered during this project is owned by the DOD and may not be retained or used by the Contractor without express permission from the JBER POC).

Deliverable: Field report – The field report shall be written in collaboration with the Federal POC and shall include a summary detailing the escort work for the season. The Federal POC will supply the field schedule to the Contractor and the Contractor should include descriptions of risk management and methods. This is a single report describing all escort support efforts conducted during the period of performance. The report will include at a minimum: dates and hours of support activities, Global Positioning System(GPS)/ Military Grid Reference System (MGRS) locations for any UXO or MEC identified, and descriptions/details of the safety and avoidance courses of actions taken.

A draft report should be delivered to the JBER POC NLT 30 calendar days after the end of the season with a final report due NLT 30 calendar days after receipt of comments from the JBER POC.

NOTE: A copy of all deliverables (except for raw data) shall be provided to the AFCEC POC (see end of Section 6.0 for contact information).

5.2 Period of Performance

The period of performance is 16 months from date of award.

5.3 The following table describes a generalized project schedule with milestones. Note that this is an estimated schedule. The unpredictable nature of Alaskan maritime field work requires that project managers be somewhat adaptable as the natural world outside of the office setting does not conform to rigid time schedules. The Contractor Project Manager shall notify the JBER Technical POC of delays expected to push back any field work or deliverable deadlines by more than 45 days.

Milestone

Description General timeframe (all “days” are calendar days)

1 Kick-off meeting (can be teleconference) NLT 30 days after agreement award

Provide Escort (n=1 Escort) for field work TBD - depends on spring and fall ice, tides, daylight and Army training schedule (estimated May- mid Nov with some potential work earlier than May and later than 15 Nov)

3 Provide boat (n=1 vessel) for field work IF NEEDED (Task 2)

TBD- anytime during the open water season (typically 15 Apr-30 Nov)

4 Present Draft field report 30 days after end of field season

5 Present Final field report (Deliverable) 30 days after receipt of comments from JBER technical POC

6.0 Services Summary

6.1 The Contractor service requirements are summarized into performance objectives listed in the below table. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.

PERFORMANCE

OBJECTIVE

PWS

PARAGRAPH

PERFORMANCE

THRESHOLD

METHOD OF

SURVEILLANCE

Provide an EOD Escort for field operations in which two (2) weeks’ notice is given to the Contractor.

3.1 100% of the time Customer Complaint

Provide written field report. 5.1

100% of the time

– with three (3) grammatical errors accepted

Customer Complaint

7.0 Point of Contacts

The Contractor shall coordinate with the JBER Technical POCs listed below and provide quarterly progress reports and final report to the JBER Technical POCs.

JBER TECHNICAL POCs:

Mr. Christopher Garner Biologist

673 CES/CEIEC

Joint Base Elmendorf Richardson (JBER) Phone: (907) 602-0860 (cell) Email: christopher.garner.9@us.af.mil

Ms. Kylene Lang Conservation Chief

673 CES/CEIEC

Joint Base Elmendorf Richardson (JBER) Phone: (317) 384-2440 (office) Email: kylene.lang.1@us.af.mil

AFCEC POC (for delivery of copy of deliverables):

Ms. Kristy Rouse

AFCEC CZOP/ISS

Joint Base Elmendorf Richardson (JBER) Phone: (907) 552-7910 Email: kristy.rouse@us.af.mil mailto:christopher.garner.9@us.af.mil mailto:kylene.lang.1@us.af.mil mailto:kristy.rouse@us.af.mil

NOTE: The Contractor will receive a minimum of two weeks' notice prior to scheduled field days. However, this advance notice provision may not apply during the award month, as field days for September 2024 have already been prearranged.

1.2 Background
1.3 Legal Drivers
2.0 Overview of Objectives
3.0 Scope
3.2 TASK 2: Management, Species, Beluga EOD Escort: Boat Support
Contractor will invoice based on the hours for services rendered.
4.0 General Requirements
5.0 Deliverables and Schedule
5.2 Period of Performance
6.0 Services Summary
6.1 The Contractor service requirements are summarized into performance objectives listed in the below table. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are crit...
METHOD OF
PERFORMANCE
PWS
PERFORMANCE
SURVEILLANCE
THRESHOLD
PARAGRAPH
OBJECTIVE
Provide an EOD Escort for field operations in which two (2) weeks’ notice is given to the Contractor.
Customer Complaint
100% of the time
3.1
100% of the time – with three (3) grammatical errors accepted
Provide written field report.
Customer Complaint
5.1
7.0 Point of Contacts
JBER TECHNICAL POCs:
AFCEC POC (for delivery of copy of deliverables):

File details come from the government source that posted it. Updated .