Attachment 1 - BAN 2.0 Price Cost Workbook.xlsx
XLSX spreadsheet 34 KB Posted
- Solicitation number
- 26-BARDA-SOL-BAN_2_1
About this file
This is a pricing template workbook for the BARDA Accelerator Network 2.0 (BAN 2.0) solicitation, specifically designed for organizations bidding to operate the Diagnostics/Medical Devices Hub. The template contains two separate annual option cost worksheets: a Wrap-Around Annual Option with a budget cap of $500,000 and a Development (DEV) Annual Option with a budget cap of $1.5 million. Each worksheet is structured identically and requires proposers to break down costs across multiple categories including direct labor (with labor category, position title, hours, and rates), fringe benefits, labor overhead, subcontracts, consultants, other direct costs (materials/supplies, equipment, travel), material handling overhead, and general and administrative expenses. Proposers must allocate costs between two funding sources: BARDA Funding and Accelerator Funding, with percentages and dollar values for each.
The template includes specific instructions requiring proposers to identify all subcontractor names, list the Principal Investigator and Key Personnel assigned to the project, enter the proposed period of performance in MM/YY to MM/YY format, and provide supporting documentation for any proposed overhead or material handling rates. For the DEV Services option, additional instructions require proposers to specify the proposed number of subawards and average amount per subaward in a supplemental narrative, along with justification for hub operational costs. The worksheet is designed as a fill-in template with placeholder rows for multiple labor categories, subcontractors, and consultants, indicating flexibility in proposal structure while maintaining consistent cost categorization and tracking across the two funding mechanisms.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2026 Diagnostics Hub Q and A.docx | DOCX document | |
| BAN 2.0 Diagnostics Solicitation Update.pdf | ||
| BAN 2.0 Diagnostics, Medical Devices Hub - Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Annual Option - Wrap Around
| Annual Option: Wrap-around Services (up to $500k) | |
| Prime Contractor | Prime Contractor (Fill-in) |
| Breakout of Wrap-around Services Operational Expenses for annual $500k assumption: | Annual Optional Work | Resource Sharing | |||||||
| Enter proposed PoP as "MM/YY to MM/YY" | BARDA Funding | Accelerator Funding | |||||||
| Direct Labor (DL) | Labor Category / Position Title (Note 1) | Name (Last, First) | Hours | Rate | Cost | Percentage (%) | Dollar Value ($) | Percentage (%) | Dollar Value ($) |
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| Insert line(s) for any additional direct labor categories | 0 | $ - | |||||||
| Total Direct Labor Costs | 0 | $ - | 0% | $ - 0 | 0% | $ - 0 | |||
| $ - | |||||||||
| Insert line(s) & title(s) for any other F/B rates | $ - | ||||||||
| Total Fringe Benefit Costs | $ - | 0% | $ - 0 | 0% | $ - 0 | ||||
| $ - | |||||||||
| Insert line(s) & title(s) for any other O/H rates | $ - | ||||||||
| Total Labor Overhead Costs | $ - | 0% | $ - 0 | 0% | $ - 0 | ||||
| Subcontracts | File/Tab Name or Link | ||||||||
| Subcontract Name - #01 | Provide details of proposed Subcontractors | $ - | |||||||
| Subcontract Name - #02 | $ - | ||||||||
| Subcontract Name - #03 | $ - | ||||||||
| Insert line(s) for any additional subcontractors | $ - | ||||||||
| Total Subcontract Costs | $ - | 0% | $ - 0 | 0% | $ - 0 | ||||
| Consultants | File/Tab Name or Link | Hours | Amount | ||||||
| Consultant Name - #01 | Provide details of proposed Consultants | $ - | |||||||
| Consultant Name - #02 | $ - | ||||||||
| Consultant Name - #03 | $ - | ||||||||
| Insert line(s) for any additional Consultants | $ - | ||||||||
| Total Consultant Costs | $ - | 0% | $ - 0 | 0% | $ - 0 | ||||
| Other Direct Costs | File/Tab Name or Link | ||||||||
| Materials/Supplies | Provide details of proposed Materials/Supplies | $ - | |||||||
| Equipment | Provide details of proposed Equipment | $ - | |||||||
| Travel | Provide details of proposed Travel | $ - | |||||||
| Insert line(s) for any other types of ODCs | $ - | ||||||||
| Total Other Direct Costs | $ - | 0% | $ - 0 | 0% | $ - 0 | ||||
| Material Handling (M/H O/H) (Note 2) | Base | Rate | |||||||
| Insert M/H O/H rate title | $ - | ||||||||
| Insert line(s) & title(s) for any other M/H O/H rates | $ - | ||||||||
| Total Material Handling Costs | $ - | 0% | $ - 0 | 0% | $ - 0 | ||||
| Subtotal Costs | $ - | 0% | $ - 0 | 0% | $ - 0 | ||||
| General and Administrative (G&A) (Note 2) | Base | Rate | |||||||
| G&A | $ - | ||||||||
| Insert line(s) & title(s) for any other G&A rates | $ - | ||||||||
| Total G&A Costs | $ - | 0% | $ - 0 | 0% | $ - 0 | ||||
| Total Estimated Costs | $ - | 0% | $ - 0 | 0% | $ - 0 |
Instructions: • Subcontractor Name: If there are subcontracts, list all subcontractor names.
• List Principal Investigator and Key Personnel working on the project.
• Subcontracts: If appropriate, place Subcontractor name(s) in Column B.
• Consultants: If appropriate, place Consultant name(s) in Column B.
• Add descriptions in Column B if costs are entered in the following areas: Fringe Benefits, Labor Overhead, Other Direct Costs/other types, Material Handling, General and Administrative
| Note 1: | Any proposed personnel in the technical proposal should be identified with their labor category. |
| Note 2: | If proposed, please submit documentation supporting basis of proposed rate. |
Annual Option - DEV ($1.5M)
| Annual Option: DEV Services (up to $1.5 million) | |
| Prime Contractor | Prime Contractor (Fill-in) |
| Funding Amount Assumption: | $ 1,500,000 |
| Proposed Number of Subawards (Note 1): | |
| Proposed Avg. Amount for each Subaward (Note 2): | |
| Total Amount of Subawards: | $ - 0 |
| Total Remaining Funds for DEV Operational Expenses (Note 3): | $ 1,500,000.00 |
| Breakout of DEV Services Operational Expenses for annual $1 million assumption: | Annual Optional Work | Resource Sharing | |||||||
| Enter proposed PoP as "MM/YY to MM/YY" | BARDA Funding | Accelerator Funding | |||||||
| Direct Labor (DL) | Labor Category / Position Title (Note 4) | Name (Last, First) | Hours | Rate | Cost | Percentage (%) | Dollar Value ($) | Percentage (%) | Dollar Value ($) |
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| 0 | $ - | ||||||||
| Insert line(s) for any additional direct labor categories | 0 | $ - | |||||||
| Total Direct Labor Costs | 0 | $ - | 0% | $ - 0 | 0% | $ - 0 | |||
| $ - | |||||||||
| Insert line(s) & title(s) for any other F/B rates | |||||||||
| Total Fringe Benefit Costs | $ - | 0% | $ - 0 | 0% | $ - 0 | ||||
| $ - | |||||||||
| Insert line(s) & title(s) for any other O/H rates | |||||||||
| Total Labor Overhead Costs | $ - | 0% | $ - 0 | 0% | $ - 0 | ||||
| Subcontracts | File/Tab Name or Link | ||||||||
| Subcontract Name - #01 | Provide details of proposed Subcontractors | $ - | |||||||
| Subcontract Name - #02 | $ - | ||||||||
| Subcontract Name - #03 | $ - | ||||||||
| Insert line(s) for any additional subcontractors | $ - | ||||||||
| Total Subcontract Costs | $ - | 0% | $ - 0 | 0% | $ - 0 | ||||
| Consultants | File/Tab Name or Link | Hours | Amount | ||||||
| Consultant Name - #01 | Provide details of proposed Consultants | $ - | |||||||
| Consultant Name - #02 | $ - | ||||||||
| Consultant Name - #03 | $ - | ||||||||
| Insert line(s) for any additional Consultants | $ - | ||||||||
| Total Consultant Costs | $ - | 0% | $ - 0 | 0% | $ - 0 | ||||
| Other Direct Costs | File/Tab Name or Link | ||||||||
| Materials/Supplies | Provide details of proposed Materials/Supplies | $ - | |||||||
| Equipment | Provide details of proposed Equipment | $ - | |||||||
| Travel | Provide details of proposed Travel | $ - | |||||||
| Insert line(s) for any other types of ODCs | $ - | ||||||||
| Total Other Direct Costs | $ - | 0% | $ - 0 | 0% | $ - 0 | ||||
| Material Handling (M/H O/H) (Note 5) | Base | Rate | |||||||
| Insert M/H O/H rate title | $ - | ||||||||
| Insert line(s) & title(s) for any other M/H O/H rates | $ - | ||||||||
| Total Material Handling Costs | $ - | 0% | $ - 0 | 0% | $ - 0 | ||||
| Subtotal Costs | $ - | 0% | $ - 0 | 0% | $ - 0 | ||||
| General and Administrative (G&A) (Note 5) | Base | Rate | |||||||
| G&A | $ - | ||||||||
| Insert line(s) & title(s) for any other G&A rates | $ - | ||||||||
| Total G&A Costs | $ - | 0% | $ - 0 | 0% | $ - 0 | ||||
| Total Estimated Costs | $ - | 0% | $ - 0 | 0% | $ - 0 |
Instructions: • Subcontractor Name: If there are subcontracts, list all subcontractor names.
• List Principal Investigator and Key Personnel working on the project.
• Subcontracts: If appropriate, place Subcontractor name(s) in Column B.
• Consultants: If appropriate, place Consultant name(s) in Column B.
• Add descriptions in Column B if costs are entered in the following areas: Fringe Benefits, Labor Overhead, Other Direct Costs/other types, Material Handling, General and Administrative
| Note 1: | Reference solicitation section X. Include details in supplemental written narrative to support the number of projects proposed within the assumed budget |
| Note 2: | Reference solicitation section X. Include details in supplemental written narrative to support the average dollar amount for each project proposed within the assumed budget |
Note 3: These expenses are any Hub operational costs associated with managing DEV funding projects.
Note 4: Any proposed personnel in the technical proposal should be identified with their labor category.
Note 5: If proposed, please submit documentation supporting basis of proposed rate.
File details come from the government source that posted it. Updated .