ATTACHMENT 1 Athens HVAC Pricing Abstract (25 May 23).xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- Athens HVAC Maintenance Federal contract opportunity
- Solicitation number
- 12445023Q029
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_12445023Q0029_Amd_0001.pdf | ||
| Sol 12445023Q0029 6.20.2023a.pdf | ||
| ATTACHMENT 2 Wage Determination 2015-4469 Rev 20 Date of Last Rev 12.27.2022 Athens HVAC Maintenance.pdf | ||
| ATTACHMENT 6 Experience Questionaire.docx | DOCX document | |
| ATTACHMENT 3 Athens HVAC Maint Statement Of Work 25 May 23.pdf | ||
| ATTACHMENT 4 Athens HVAC Maintenance List of Sustainable Products 01272021.pdf | ||
| ATTACHMENT 5 Athens NB and SB HVAC Layout and Square Footage.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
INSTRUCTIONS: HOW TO USE THIS FORM
| Independent Government Estimate (IGE) |
| No specific format is required for an IGE; however this must be an independent estimate and not a reiteration of a contractor quote. The selected format should generally be in the same level of detail and manner that the Schedule of Items pricing we request from contractors. The estimate should state any underlying assumptions or rationale used in formulating the estimate. Initially the CO will use the IGE to determine the estimated value of the procurement and to identify the appropriate procurement thresholds applicable to the solicitation. Later the IGE is compared to prices received to evaluate an offeror’s understanding of the government requirements and in supporting a price reasonableness determination. |
EXPLANATION OF TABS
| Stand Alone IGE: | Use if the below do not apply to your requirement. |
| Stand Alone IGE w/options: | Use if you have a requirement where you know you have an ongoing/recurring need year after year. |
| IDIQ: | Use if you have a need that is reoccurring or multi-year requirement. |
| Task Order: | Use if you want to issue a order against an existing contract or agreement. |
CONTRACT (WITH OPTION YRS)
PRICING ABSTRACT
Southern Research Station PROJECT TITLE: Athens HVAC Preventative Maintenance
| Period of Performance Base Year: 09/01/2023-08/31/2024 | ||||||
| ITEM | ||||||
| NUMBER | DESCRIPTION | PAY UNIT | EST QTY | UNIT COST | TOTAL | |
| Scheduled Maintenance | ||||||
| 0001AA | North Building Single Zone AHU - 11 Units (Per unit, per service (11 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 0001AB | North Building Fan Coil Units - 78 Units (Per unit, per service (78 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 0001AC | North Building Boiler - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 0001AD | North Building Chiller - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 0001AE | North Building Centrifugal Circulating Pumps - 4 Units (Per unit, per service (4 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 0002 | Scheduled Maintenance Parts - A cost reimbusable part over $300, prior COR Approval Required. Parts exclusive of any overhead, profit, general, administrative, or material handling costs. Reciepts required. | LS | $ 4,000.00 | $ 4,000.00 | ||
| Emergency Calls | ||||||
| 0003AA | Emergency Call - Labor Hours (Estimated) | HR | 25 | $ - 0 | $ - 0 | |
| 0003AB | Emergency Call Parts - Parts exclusive of any overhead, profit, general, administrative, or material handling costs. Reciepts required. (Estimated) | LS | $ 1,500.00 | $ 1,500.00 | ||
| Base Year Total Price | $ 5,500.00 |
| Period of Performance Option Year 1: 09/01/2024-08/31/2025 | ||||||
| ITEM | ||||||
| NUMBER | DESCRIPTION | PAY UNIT | EST QTY | UNIT COST | TOTAL | |
| Scheduled Maintenance | ||||||
| 1001AA | North Building Single Zone AHU - 11 Units (Per unit, per service (11 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 1001AB | North Building Fan Coil Units - 78 Units (Per unit, per service (78 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 1001AC | North Building Boiler - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 1001AD | North Building Chiller - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 1001AE | North Building Centrifugal Circulating Pumps - 4 Units (Per unit, per service (4 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 1006AF | South Building Boiler - 2 Units (Per unit, per service (2 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 1007AG | South Building DX Split System Air Conditioner Condensers - 2 Units (Per unit, per service (2 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 1008AH | South Building Fan Coil Units - 2 Units (Per unit, per service (2 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 1009AJ | South Building Centrifugal Circulating Pumps - 6 Units (Per unit, per service (6 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 1010AK | South Building Motor Operated Dampers - 9 Units (Per unit, per service (9 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 1011AL | South Building Electric Duct Heaters - 10 Units (Per unit, per service (10 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 1012AM | South Building Dedicated Outdoor Air System - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 1013AN | South Building MultiZone AHU - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 1014AP | South Building Fire Lab Exhaust Fan and Scrubber - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 1015AQ | South Building Suspended Gas Fired Propeller Heaters - 3 Units (Per unit, per service (3 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 1016AR | South Building Chiller - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 1002 | Scheduled Maintenance Parts - A cost reimbusable part over $300, prior COR Approval Required. Parts exclusive of any overhead, profit, general, administrative, or material handling costs. Reciepts required. | LS | $ 7,500.00 | $ 7,500.00 | ||
| Emergency Calls | ||||||
| 1003AA | Emergency Call - Labor Hours (Estimated) | HR | 35 | $ - 0 | $ - 0 | |
| 1003AB | Emergency Call Parts - Parts exclusive of any overhead, profit, general, administrative, or material handling costs. Reciepts required. (Estimated) | LS | $ 2,500.00 | $ 2,500.00 | ||
| Opt Yr 1 Total Price | $ 10,000.00 |
| Period of Performance Option Year 2: 09/01/2025-08/31/2026 | ||||||
| ITEM | ||||||
| NUMBER | DESCRIPTION | PAY UNIT | EST QTY | UNIT COST | TOTAL | |
| Scheduled Maintenance | ||||||
| 2001AA | North Building Single Zone AHU - 11 Units (Per unit, per service (11 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 2001AB | North Building Fan Coil Units - 78 Units (Per unit, per service (78 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 2001AC | North Building Boiler - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 2001AD | North Building Chiller - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 2001AE | North Building Centrifugal Circulating Pumps - 4 Units (Per unit, per service (4 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 2006AF | South Building Boiler - 2 Units (Per unit, per service (2 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 2007AG | South Building DX Split System Air Conditioner Condensers - 2 Units (Per unit, per service (2 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 2008AH | South Building Fan Coil Units - 2 Units (Per unit, per service (2 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 2009AJ | South Building Centrifugal Circulating Pumps - 6 Units (Per unit, per service (6 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 2010AK | South Building Motor Operated Dampers - 9 Units (Per unit, per service (9 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 2011AL | South Building Electric Duct Heaters - 10 Units (Per unit, per service (10 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 2012AM | South Building Dedicated Outdoor Air System - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 2013AN | South Building MultiZone AHU - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 2014AP | South Building Fire Lab Exhaust Fan and Scrubber - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 2015AQ | South Building Suspended Gas Fired Propeller Heaters - 3 Units (Per unit, per service (3 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 2016AR | South Building Chiller - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 2002 | Scheduled Maintenance Parts - A cost reimbusable part over $300, prior COR Approval Required. Parts exclusive of any overhead, profit, general, administrative, or material handling costs. Reciepts required. | LS | $ 7,500.00 | $ 7,500.00 | ||
| Emergency Calls | ||||||
| 2003AA | Emergency Call - Labor Hours (Estimated) | HR | 35 | $ - 0 | $ - 0 | |
| 2003AB | Emergency Call Parts - Parts exclusive of any overhead, profit, general, administrative, or material handling costs. Reciepts required. (Estimated) | LS | $ 2,500.00 | $ 2,500.00 | ||
| Opt Yr 2 Total Price | $ 10,000.00 |
| Period of Performance Option Year 3: 09/01/2026-08/31/2027 | ||||||
| ITEM | ||||||
| NUMBER | DESCRIPTION | PAY UNIT | EST QTY | UNIT COST | TOTAL | |
| Scheduled Maintenance | ||||||
| 3001AA | North Building Single Zone AHU - 11 Units (Per unit, per service (11 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 3001AB | North Building Fan Coil Units - 78 Units (Per unit, per service (78 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 3001AC | North Building Boiler - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 3001AD | North Building Chiller - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 3001AE | North Building Centrifugal Circulating Pumps - 4 Units (Per unit, per service (4 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 3006AF | South Building Boiler - 2 Units (Per unit, per service (2 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 3007AG | South Building DX Split System Air Conditioner Condensers - 2 Units (Per unit, per service (2 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 3008AH | South Building Fan Coil Units - 2 Units (Per unit, per service (2 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 3009AJ | South Building Centrifugal Circulating Pumps - 6 Units (Per unit, per service (6 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 3010AK | South Building Motor Operated Dampers - 9 Units (Per unit, per service (9 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 3011AL | South Building Electric Duct Heaters - 10 Units (Per unit, per service (10 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 3012AM | South Building Dedicated Outdoor Air System - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 3013AN | South Building MultiZone AHU - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 3014AP | South Building Fire Lab Exhaust Fan and Scrubber - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 3015AQ | South Building Suspended Gas Fired Propeller Heaters - 3 Units (Per unit, per service (3 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 3016AR | South Building Chiller - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 3002 | Scheduled Maintenance Parts - A cost reimbusable part over $300, prior COR Approval Required. Parts exclusive of any overhead, profit, general, administrative, or material handling costs. Reciepts required. | LS | $ 7,500.00 | $ 7,500.00 | ||
| Emergency Calls | ||||||
| 3003AA | Emergency Call - Labor Hours (Estimated) | HR | 35 | $ - 0 | $ - 0 | |
| 3003AB | Emergency Call Parts - Parts exclusive of any overhead, profit, general, administrative, or material handling costs. Reciepts required. (Estimated) | LS | $ 2,500.00 | $ 2,500.00 | ||
| Opt Yr 3 Total Price | $ 10,000.00 |
| Period of Performance Option Year 4: 09/01/2027-08/31/2028 | ||||||
| ITEM | ||||||
| NUMBER | DESCRIPTION | PAY UNIT | EST QTY | UNIT COST | TOTAL | |
| Scheduled Maintenance | ||||||
| 4001AA | North Building Single Zone AHU - 11 Units (Per unit, per service (11 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 4001AB | North Building Fan Coil Units - 78 Units (Per unit, per service (78 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 4001AC | North Building Boiler - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 4001AD | North Building Chiller - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 4001AE | North Building Centrifugal Circulating Pumps - 4 Units (Per unit, per service (4 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 4006AF | South Building Boiler - 2 Units (Per unit, per service (2 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 4007AG | South Building DX Split System Air Conditioner Condensers - 2 Units (Per unit, per service (2 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 4008AH | South Building Fan Coil Units - 2 Units (Per unit, per service (2 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 4009AJ | South Building Centrifugal Circulating Pumps - 6 Units (Per unit, per service (6 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 4010AK | South Building Motor Operated Dampers - 9 Units (Per unit, per service (9 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 4011AL | South Building Electric Duct Heaters - 10 Units (Per unit, per service (10 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 4012AM | South Building Dedicated Outdoor Air System - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 4013AN | South Building MultiZone AHU - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 4014AP | South Building Fire Lab Exhaust Fan and Scrubber - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 4015AQ | South Building Suspended Gas Fired Propeller Heaters - 3 Units (Per unit, per service (3 units @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 4016AR | South Building Chiller - 1 Unit (Per unit, per service (1 unit @ $_____ each, x 2 (twice per year) = Total line annual price)) | LS | 1 | $ - 0 | $ - 0 | |
| 4002 | Scheduled Maintenance Parts - A cost reimbusable part over $300, prior COR Approval Required. Parts exclusive of any overhead, profit, general, administrative, or material handling costs. Reciepts required. | LS | $ 7,500.00 | $ 7,500.00 | ||
| Emergency Calls | ||||||
| 4003AA | Emergency Call - Labor Hours (Estimated) | HR | 35 | $ - 0 | $ - 0 | |
| 4003AB | Emergency Call Parts - Parts exclusive of any overhead, profit, general, administrative, or material handling costs. Reciepts required. (Estimated) | LS | $ 2,500.00 | $ 2,500.00 | ||
| Opt Yr 4 Total Price | $ 10,000.00 | |||||
| LS - Lump Sum | ||||||
| HR - Hour | ||||||
| Award anticipated to be a firm fixed price contract |
File details come from the government source that posted it. Updated .