Attachment 1 Armory Door SON (UPDATED).pdf

PDF 142 KB Posted

Attached to
Class-5 Armory Vault Door
Solicitation number
FA302225Q0327
Issued by

About this file

This is a Statement of Need (SON) for a General Services Administration (GSA) Approved Class-5 Armory Vault Door for the 14 Security Forces Squadron in Building 926. The requirement involves removing the existing Mosler door and installing a new GSA-approved vault door that meets strict security specifications, including resistance to 30 man-minutes of covert entry and 10 man-minutes of forced entry. The door must have a UL-listed lock, a certified security label, and comply with multiple federal specifications including DoDM 5100.76_DAFMAN 31-101v2 and AA-D-600D.

The contractor will be responsible for removing the old door, hauling related items to waste management, purchasing the new GSA-approved Class-5 door and frame, and installing it in Building 926. This may require wall extensions, welding, or concrete work. The period of performance is expected to be no later than 16 weeks after the award date, with the contractor responsible for correcting any deficiencies that do not pass GSA standards and inspection at their own expense.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF NEED

FOR

GENERAL SERVICES ADMINISTRATION (GSA)

APPROVED CLASS-5 ARMORY VAULT DOOR

10AUG2025

GENERAL - PART 1

1.0 GENERAL: The statement of need (SON) defines the scope of equipment specification to purchase a GSA Approved Class-5 Armory Vault Door for the Primary Armory in the 14 Security Forces Squadron in Building 926. This item will be used to replace the current Mosler Door that installed in the primary armory that has been permanently de-certified as well as bring the Building 926 Armory in compliance IAW DoDM 5100.76_DAFMAN 31-101v2 Physical Security of Sensitive Conventional Arms, Ammunition, and Explosives (AA&E). The contractor shall provide all personnel, equipment, installation, labor, material, documentation, and services in support of the requirement.

PRODUCTS / TECHNICAL -PART II

2.1. Contractor shall remove the Mosler door and door frame from building 926 and haul related items to a waste management location. Purchase GSA approved class 5 door and frame and install GSA approved door and frame in building 926.

2.1.1 Requirements: All aspects of this project will be in accordance with DoDM 5100.76_DAFMAN 31-101v2 Physical Security of Sensitive Conventional Arms, Ammunition, and Explosives (AA&E) 16 July 2025, AA-D-600D, Federal Specification Door, Vault, Security 15 May 2000, UFC 4-026-01, Design to Resist Forced Entry, 4 March 2020 and MIL-HDBK-1013/1A, Design Guidelines for Physical Security of Facilities, 15 December 1993.

2.1.2 GSA Approved Class-5 Armory Vault Door Specifications:

• Armory door shall be resistant to 30 man-minutes covert entry and 10 man-minutes forced entry.

• Armory door shall have a lock which is Underwriters Laboratories (UL) listed in accordance with

Group 1 of UL 768. The lock design or installation shall not compromise the integrity of the door.

• Armory door shall have a certified label and shall be affixed to the inside face of the door bearing the following certification: "This is a U.S. Government Class 5-V vault door which has been tested and approved by the Government under Fed. Spec. AA-D-600D. It affords the following security protection:

"30 man-minutes against covert entry.

10 man-minutes against forced entry.

The protection certified above applies only to the door and not to the vault proper."

• Materials, Finishing Materials, Design, Assembly, Clear Door Opening, Wall Thickness, Door

Frame, Door Pull and Throw Bolt Handles, Door Stop, Door Striker, Door Hinges, Door Threshold, Back Cover Plate, Lock, Lock Installation, Locking Mechanism, and Locking Mechanism and Lock Mounting Drawings shall meet the required specifications IAW AA- D-600D, Federal Specification Door, Vault, Security 15 May 2000 to ensure the Armory door is in Federal Compliance.

2.1.2.1 Minimum Unit Requirements: 1 GSA Approved Class-5 Armory Door

2.3 Contractor shall remove the Mosler door and door frame from Building 926 and haul related items to a waste management location. Purchase GSA Approved Class-5 door and frame and install GSA door and frame at Building 926. Ensure the wall is extended by following guidelines within the following regulations mentioned, to meet security requirements for wall thickness/construction. This may require welding or concrete work. Ensure all is in working order. If the work completed does not pass GSA standards and inspection by GSA Inspector following install, contractor must correct deficiencies at the contractor’s expense.

2.4 The Period of Performance for this requirement is expected to be no later than 16 weeks after date of receiving award.

File details come from the government source that posted it. Updated .