This Statement of Work (SOW) details the furniture refurnishing requirements for Dorm 706 at Nellis Air Force Base in Nevada. The project involves comprehensive furniture installation, including delivery, assembly, and removal of existing furniture across a three-story facility. Key contractor responsibilities include cleaning and hauling away old furniture, providing protective materials during installation, touch-up of furniture, daily debris removal, and final cleaning using non-toxic cleaners.
The project is a HUBZone Total Small Business Set Aside under NAICS code 337122, with a firm fixed-price contract type. Contractors must provide all personnel, equipment, tools, and materials for furniture delivery and installation. Working hours are 8:00 AM to 3:30 PM Monday through Friday, with potential for alternative hours if pre-approved. The contractor must maintain a neat uniform appearance, comply with safety regulations, and complete all work within 10 working days after furniture installation, with final project documentation required within 30 days of acceptance. Delivery is expected within 180 days after order, with the installation location being Building 706 at 4550 Carswell Ave on Nellis Air Force Base.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 4 - 706_A_FP_2.pdf | ||
| Attachment 6 - F3G3CJ5055A001 FAQs.pdf | ||
| Attachment 3 - 706_A_FP_1.pdf | ||
| Attachment 2 - Item List.pdf | ||
| Attachment 5 - 706_A_FP_3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
For
Dorm 706 Refurnishing 19 Feb 2025
SECTION I
DESCRIPTION OF SERVICES SPECIFIC TASKS
1. SCOPE OF WORK
This requirement is for the installation of furniture and window treatments, as specified within
Attachment 2 – Item List, as requested by the 99th Civil Engineer Squadron (99 CES). The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items necessary for the delivery and assembly of furniture as defined in this Statement of Work for building 706 and a warehouse on Nellis Air Force Base, NV. The services called for under this task order shall be performed in accordance with the terms, conditions, and specifications stated herein until such time as said services are completed to the satisfaction of the Government.
2. LOCATION
The project sites are located at Nellis AFB. Nellis Air Force Base (NAFB) is located approximately nine (9) miles north of downtown Las Vegas on Highway U.S. 93 (Las Vegas Blvd). NAFB consists of three main areas: the Main Base, Area II, and Area III. The specific project location will be at building 706 located at 4550 Carswell Ave. This building is a three-story facility (Elevators are not available), and the dorm rooms are accessible from outside.
3. DESCRIPTION OF WORK
Contractor shall provide management, personnel, labor, tools, equipment, transportation, and materials and services necessary for the delivery and install of new items for building 706 and warehouse as specified within Attachment 2 – Item List. The contractor must:
3.1 Clean-up and haul away of waste to include the preexisting furniture that is not identified for reutilization.
3.2 Provide dump slips for all disposed furniture items identified by the customer.
3.3 Touch-up all nicks and scratches on the furniture that occurs during installation.
3.4 Remove all packing materials, debris, and cartons from the job site daily.
3.5 Provide all protective materials to protect the interior of the building, including but not limited to, all floors, walls, door frames, thresholds, etc. from damage and soil during the move and shall cover the floors with protective materials. Adhesive tape must not be used to secure protective materials.
3.7 Notify 99 CES/CEIHD office for the final inspection. Final clean-up will be completed prior to any inspection. All project documentation is required within 30 days of acceptance.
4. FACILITIES DAMAGE
The contractor and customer shall conduct an installation walk-through before the installation date and prepare a list which annotates any pre-existing damage at the new location. The contractor and customer shall sign off on this list and provide it to the contracting officer. The contractor shall correct at contractor’s expense or pay the Government to repair any building damage caused by the installation team, including damage to walls, ceiling, and floors. Restore the building to the condition it was in at the start of furniture installation.
5. WORKING HOURS
Working hours for the Contractor shall normally be between the hours of 8:00 A.M. and 3:30
P.M., Monday through Friday, excluding Federal holidays. If the Contractor desires to work during periods other than the above, he/she must identify by letter to the Contracting Officer at least five working days in advance of the dates desired and identify the work that will be accomplished if approval is given. The Contractor shall not be reimbursed for any changes or work accomplished outside the scope of the contract without prior approval by the Contracting
Officer. In addition to the above, close coordination with the Government must be maintained.
6. COMPLETION
Upon completion of installation, the contractor shall:
▪ Protect all warranties by immediately correcting all omissions, mistakes, or damage.
▪ Review the installation of the site with 99 CES and prepare a punch list of any problems that needs corrected.
▪ Remove and replace any defective product or material that has been delivered to the site.
▪ Correct all other punch list items, to the satisfaction of the Contracting Officer within ten
(10) working days after completing the furniture installation.
▪ Furniture Cleaning: Clean and dust furniture surfaces inside and out with a spray cleaner upon completion of installation of each floor. Use only non-toxic cleaners.
▪ The Contractor shall notify the 99 CES/CEIHD office for the final inspection. Final clean-up will be made prior to any inspection. All project documentation is required within 30 days of acceptance.
7. ADDITIONAL INFORMATION
7.1 Warranty: All products shall include the standard commercial warranty.
7.2 Disposal: The contractor shall coordinate disposal activities with the building owner to consist of location of dumpsters if needed. Remove all packing materials, debris, and cartons from the job site daily.
7.3 Protection of Property: The contractor shall provide all protective materials to protect the interior of the building, including but not limited to, all floors, walls, door frames, thresholds, etc. from damage and soil during the move and shall cover the floors with protective materials. Under no circumstance shall adhesive tape be used to secure the protective materials.
SECTION II
GENERAL INFORMATION
1. CONTRACTOR PERSONNEL REQUIREMENTS
The contractor shall provide the name of the responsible person who has full authority to act for the contractor on all matters relating to the performance of this contract. The name of this person or alternate(s) who shall act for the contractor when the responsible person is absent shall be designated in writing to the contracting office. Normal duty hours for Nellis AFB are
08:00 am to 04:00 pm, Monday through Friday excluding Federal Holidays.
2. UNIFORM AND APPEARANCE
Contractor personnel shall present a neat appearance and be easily recognized as contractor employees. While on duty, all employees shall wear a company unique uniform of the style and color normally used by industry. The uniform shall be always clean and neat in appearance.
3. SAFETY
There are no identified hazards on the designated property. The fact that no conditions have been identified does not warrant or guarantee that hazards do not exist, or that work-around procedures will not be necessary. Compliance with the OSHA and other applicable laws regulations for the protection of employees is exclusively the obligation of the contractor.
Further, the government will assume no liability or responsibility for the contractor’s compliance or non-compliance with such requirements.