This document contains a draft statement of work and related federal contract opportunity notice. The draft statement of work describes engineering and technical support services required by the Naval Research Laboratory to support research, development, testing, and evaluation programs in tactical electronic warfare. Services include simulator, technical resource, and support equipment upgrades; RF engineering, analysis, upgrade and development; and information technology support. Interested parties are requested to provide contact and capability information to the Naval Research Laboratory by a specified date for planning purposes in response to this pre-solicitation notice. The primary place of performance is on-site at the Naval Research Laboratory, with potential work at other government facilities and contractor sites as needed. Security clearance requirements and historical information on the incumbent contractor are also included.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 3_57-5003-22_Level of Effort.docx | DOCX document | |
| Attachment 2_PERSONNEL QUALIFICATIONS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Naval Research Laboratory 4555 Overlook Avenue SW
Washington DC, 20375-5329 Code 5752
-----DRAFT----
NRL Code 5752 Statement of Work (SOW) – Base
IDIQ
PR # 57-5003-22
N00173-TBD
Attachment #
STATEMENT OF WORK
(Engineering and Technical Support)
Table of Contents
1. Introduction
2. Scope
3. Technical Requirements
4. Deliverables
5. Security – DD254
6. Place of Performance
Attachment #
1. Introduction
The Naval Research Laboratory (NRL) is responsible for research and development in support of the Navy's Tactical Electronic Warfare (EW) missions. This Statement of Work describes the engineering and technical support services to be provided for this procurement.
The primary mission of the Advanced Techniques Digital Integrated Electronic Warfare (EW) Simulation Branch is to conduct a multifaceted simulation program to advance U.S. Navy research, development, test, and evaluation (RDT&E). Under OPNAV sponsorship, the Branch provides for the research, development, operation, and maintenance of Radio Frequency (RF) and Electro-Optical/Infrared (EO/IR) antiship missile simulators, a large hardware-in-the-loop simulation facility, virtual (digital) and signal processor in the loop simulations, a specially equipped NP-3D flying EW laboratory and two modified Lear 36’s. These simulation assets directly support the effectiveness evaluation of current and future EW systems and techniques in the RF domain.
Currently, NRL utilizes three (3) NP-3D research aircraft that are part of the Scientific Development Squadron One (VXS-1), located at the Naval Air Station, Patuxent River, Maryland. Two of these aircraft are utilized by NRL to develop and provide an airborne capability to perform effectiveness evaluations of Naval EW systems. In accomplishing these tasks NRL also utilizes two specially modified Lear 36’s that are under contract to PMA-207 and are operated by L3 Communications, Flight International LLC division (hereafter referred to as L3/FI) at the Newport News, VA airport. NRL also uses Phoenix Air operated Lear Jet aircraft that have been certified to Tow Targets (these are needed for a new class of Towable Simulators designed, operated, and maintained by NRL).
2. Scope
The contractor shall provide scientific, engineering, maintenance, coordination, and testing services necessary to accomplish the RDT&E and maintenance programs performed by the Tactical Electronic Warfare Division (TEWD) of NRL. Some of these tasks require personnel with SCI to fully access the data sets related to the projects. These services shall include three tasks.
3. Technical Requirements
The technical requirement is geared towards the accomplishment of Task 1, Task 2, & Task 3.
The specific tasks to be performed shall include:
3.1 TASK 1: Simulator, Technical Resources, and Support Equipment Upgrades
The contractor shall design and provide installation for flyable EO/IR missile simulators, modification, and operational support for TEWD EO/IR missile simulators and for the machine vision devices developed by NRL. This installation and support will be at multiple locations including on the Navy P-3, alternative commercial aircrafts, and field sites. Furthermore, the
Attachment # contractor shall provide support in maintaining and upgrade other technical resources, supplemental electronics, sensors, lasers, optical systems, and mechanical systems needed to support the technical functions of Code 5750.
3.1.1 The contractor shall prepare engineering data, design specifications, schematics, and installation drawings to support design, modification, and installation of EO/IR simulators and data collection devices.
3.1.2 The contractor shall design, write, and maintain application specific government owned software that will drive and control simulators, test gear, other custom devices, and OEM devices used by Code 5750 in fulfilling its missions.
3.1.3 The contractor shall support optical design, building, integration, and installation of sensors, lenses, and lasers for EO/IR systems.
3.1.4 The contractor shall provide schematics, layout drawings, and printed circuit boards for all computer interface boards.
3.1.5 The contractor shall fabricate and provide interface cables for the simulators to be used at NRL and its field sites.
3.1.6 The contractor shall fabricate and test all fiber optic links and cable harnesses between the computers installed in the fuselage and the computers located in the aircraft wing pods or in the aircraft nose sections.
3.1.7 The contractor shall perform mechanical, electrical, and structural changes to accommodate equipment installation/removal in NRL laboratories and onboard field test platforms.
3.1.8 The contractor shall conduct equipment checkout and testing of design changes and installation to verify performance acceptability both during flight and ground operations and installation integrity and suitability.
3.1.9 The contractor shall prepare coordination support documentation containing design information, installation data (i.e., weight and balance calculations), and flight schedules for all EO/IR simulators.
3.1.10 The contractor shall collect and provide support for correlation and analysis of test data from all EO/IR simulators and test instrumentation used in the lab and at field sites. The contractor shall prepare tables, plots, and provide data reduction of the EO/IR simulator data collected.
3.1.11 The contractor shall prepare draft evaluation reports detailing test results in regard to laboratory and field measurement programs that may include analysis of fleet operational systems.
Attachment #
3.1.12 The contractor shall provide engineering analysis, design, development, and maintenance services for the gimbal systems used in the simulators and instrumentation systems.
3.1.13 The contractor shall provide mechanical and electrical services to install the EO/IR Simulators on other than Navy and commercial aircraft such as the Lear jet aircraft.
3.1.14 The contractor shall provide test support vehicles such as aircraft, boats, and support hours as needed in the performance of both simulator tests flights and operational tests.
3.1.15 The contractor shall provide services in the design, fabrication, and test of EW systems and components such as computers, sensors, optical systems, lasers, and other system devices.
3.2 TASK 2: RF Engineering, Analysis, Upgrade and Development
The contractor shall provide engineering analysis, design, development, and maintenance in the design, assembly, and testing of microwave antennas, systems, and devices. This effort will include the performance evaluation of land based and at sea evaluations of developmental and operational EW systems.
3.2.1 The contractor shall perform RF measurements such as phase, amplitude, insertion loss, return loss, and isolation on active and passive microwave devices.
3.2.2 The contractor shall perform spectrum analysis measurements on active microwave devices.
3.2.3 The contractor shall perform radiation pattern and gain measurements on microwave antennas.
3.2.4 The contractor shall perform radar cross-section measurements on various radar reflecting objects.
3.2.5 The contractor shall perform the installation and check out of test equipment for land based and at sea testing.
3.2.6 The contractor shall collect and conduct correlation and analysis of test data from RF simulators and EW systems used in land based and at sea tests on developmental and operational systems.
Attachment #
3.3 TASK 3: Information Technology Support
The contractor shall perform computer engineering analysis, design, development, and maintenance as necessary that pertains to the scope of this requirement.
3.3.1 Development and coding of software for various technical projects.
3.3.2 Analysis, design, development, and maintenance of information technology as needed. This is to be accomplished on both classified and unclassified networks;
3.3.2.1 Scientific applications at work stations,
3.3.2.2 Server capacity maintenance,
3.3.2.3 Network security maintenance for classified projects. The tasks may involve working with classified data and intelligence information up to the SCI security level.
4. Deliverables
Deliverables will be in accordance with the Contract Data Requirements List (CDRL) DD Form 1423. The general requirements for these items are listed below:
4.1 CDRL A001 As Requested Progress Reports
The report should be separated for each task involved in this contract and should include but not be limited to the following:
4.1.1 Description of progress during the reporting period, supported by explanations for any change in approach reported previously.
4.1.2 Summary of any field testing done during the reporting period.
4.1.3 Summary of any problems or area of concern the contractor has encountered during performance of work.
4.2 CDRL A002 Monthly Financial Reports
4.2.1 Amount currently expended for each task and labor category.
4.2.2 Expenditures and commitments to date for each task and labor category.
4.2.3 Estimated funds required for completing work.
4.2.4 Cost of travel and material purchased during the reporting period for each task.
Attachment #
4.3 CDRL A003 On-Site Contractor Reports
4.3.1 Reporting period, contract number, contract value, current funding, amount expended in current period, total expended to date and the date submitted.
4.3.2 Employee name (including subcontractors), number of hours worked and total amount billed for contractor employees working on-site at NRL.
4.4 CDRL A004 Final Report
The Final Report shall be a comprehensive summary of the as-requested progress reports described in paragraph 4.1 above.
5. Security – DD254
To execute the research in the SOW, collateral SECRET, NATO SECRET, and TS-SCI clearances will be required for technical personnel. Administrative support personnel will need Collateral SECRET clearances. Interim-SECRET clearances are allowed on a temporary basis for new-hires.
6. Place of Performance
Primary place of performance is on-site at NRL. Additionally, work may be performed at other Government facilities, and Contractor sites. Presentations, technical interchange meetings, and support activities may require temporary duty (TDY) to remote locations. Performance of this task may also require travel to system test execution sites.