Statement of Work Summary
This is a Statement of Work for project 550-26-158, a sanitary sewer pipe repair project at the Veterans Affairs Illiana Healthcare System (VAIHCS) located at 1900 East Main Street, Danville, Illinois 61832. The contractor must provide all labor, materials, supplies, equipment, management, supervision, and resources to repair cracked sanitary pipes in the crawl space under Building 58. Work includes general construction, pipe relining, repair of exterior wall penetrations, and pipe condition assessments using camera scoping. The project encompasses repair of a 12-inch main sewer line, a 4-inch drain line, and a 2-inch drain line, with a rough estimate of 30 feet of pipe repair for each size. Completed repairs must prevent leaks, block insects from entering or leaving pipes, maintain proper water drainage, and seal wall penetrations to prevent insect and groundwater infiltration.
The contractor must complete all work during normal business hours (7:30 AM to 4:00 PM) unless prior arrangements are made with the Contracting Officer's Representative (COR). All personnel require proper VA identification access, completion of privacy training compliant with VA Handbook 6500.6 Appendix C, and possession of a Ten-hour OSHA card. Infection Control permits must be obtained from Corina Masterman (217-554-4330) prior to work commencement. System shutdowns must be coordinated with VA to minimize operational impact. The completion deadline is 120 calendar days after receipt of Notice to Proceed. The primary point of contact is Ryan Nesbitt, COR, at (217) 274-5059 or ryan.nesbitt@va.gov. A pre-bid inspection will be conducted to allow bidders to inspect existing conditions and ask questions before submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25226B0015 0002.docx | DOCX document | |
| Pre-Bid RFI 550-26-158 - FA.xlsx | XLSX spreadsheet | |
| Site Visit SIGN IN SHEET 550-26-158 FE.pdf | ||
| 36C25226B0015 0001.docx | DOCX document | |
| Attachment 7 - Pipe Location 2 and 3.jpg | JPG image | |
| Attachment 6 - Pipe Location 1.jpg | JPG image | |
| Attachment 8 - Pipe Location 2.jpg | JPG image | |
| Attachment 5 - Pipe Location 1-3.jpg | JPG image | |
| Attachment 10 - 550-26-158 Wage Determination.pdf | ||
| Attachment 9 - Pipe Location 3.jpg | JPG image | |
| Attachment 4 - Pipe Location 1-2.jpg | JPG image | |
| Attachment 3 - 550-26-158 Pipe Location Drawing.pdf | ||
| Attachment 2 - 550-26-150 Project Specifications.pdf | ||
| 36C25226B0015_1.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
550-26-158, Sanitary Sewer Pipe Repair – B58 February 11, 2026
STATEMENT OF WORK
Scope:
The contractor shall provide all labor, material, supplies, equipment, management, supervision, and all other resources for project 550-26-158, Sanitary Sewer Pipe Repair – B58. Work location is on the campus of the Veterans Affairs Illiana Healthcare System (VAIHCS) located at 1900
East Main Street, Danville, Il 61832. A pre-bid inspection will be conducted to allow bidders to inspect existing conditions and bring questions to the attention of VA prior to bid submission.
Contractor to verify all the dimensions and measurements of items before construction starts.
A. This construction project repairs cracked sanitary pipes in the crawl space under
Building 58.
B. Work includes general construction, pipe relining, repair of exterior wall penetrations, and pipe condition assessments using camera scoping.
C. This project includes repair of a 12-inch main sewer line, a 4-inch drain line, and a 2-inch drain line. Rough estimate (without scoping) is 30 feet of pipe repair for each size. Result must not leak and must prevent insects from entering or leaving the pipes. Result must not inhibit the draining of water through the pipes. Wall penetrations must be sealed to prevent insect or ground water from entering the crawl space.
D. Coordinate system shutdowns with the VA to minimize impact to any spaces served.
The work involved is located within the crawlspace of Building 58, all demolition materials shall be removed from the space, leaving a clean work area.
Additional Requirements:
A. All work is to be done during normal work hours of 7:30 AM to 4:00 PM unless prior arrangements are made with the COR.
B. Additional requirements impacting shutdowns are to be coordinated in advance to minimize interruptions to operations (where applicable).
550-26-158, Sanitary Sewer Pipe Repair – B58 February 11, 2026
Site Access:
A. All personnel working on this project shall be required to obtain proper identification access, contact the COR for instructions.
B. All personnel working on VA property are required to complete privacy training and comply with VA Handbook 6500.6 Appendix C, Sections 1, 6, 7, 9a(3) and 9b.
C. All personnel on VA projects are required at a minimum to be in possession of a Ten (10) hour OSHA card.
D. Infection Control permits where required will be issued by the Infection Control Staff
(Corina Masterman, 217-554-4330) prior to the commencement of work. COR/POC assist with coordination and escorts as required.
Completion Time: 120 Calendar days after receipt of Notice to Proceed.
Prior to work commencing, direct coordination with Veterans Affairs Illiana Healthcare System
(VAIHCS) Facility Management Service is required. Primary point of contact is Ryan Nesbitt