Pre-Bid RFI 550-26-158 - FA.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Z1DA--550-26-158 Sanitary Sewer Pipe Repair B58
Solicitation number
36C25226B0015
Issued by

About this file

This file is a Pre-Bid Request for Information (RFI) log for Solicitation 36C25226B0015, documenting 11 questions and VA responses related to sanitary sewer pipe repair work at a Veterans Affairs facility (Building B58). The RFI responses provide critical clarifications on project scope and requirements for prospective bidders.

Key clarifications from the VA responses include: trenchless pipe rehabilitation methods (such as cured-in-place pipe lining) are acceptable if approved under the Illinois plumbing code; contractors must hold an Illinois State Plumbing License as the sanitary sewer system connects to the Danville City sewer system; televising and locating of pipe lines is the contractor's responsibility and will not be performed by the VA; and all abandoned piping and fittings located in the affected work area must be removed and disposed of by the contractor before project completion, with removal requirements extending beyond the immediate repair area. The RFI log references Amendment 0002 to the solicitation, which extended the bid due date to April 8, 2026, at 1:00 PM CST, with bid opening held in-person at the Great Lakes Acquisition Center (GLAC) in Milwaukee, Wisconsin. Questions were submitted by contractors including B2 Solutions, SterileCO LLC, and A&R Mechanical Contractors Inc between February 25 and March 11, 2026.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Bid RFIs

550-26-158 Sanitary Sewer Pipe Repair - B58
Pre-Bid RFIs - 36C25226B0015
No.Date SubmittedRequested By: (Name of Firm)SUBJECT/COMMENTAmendment #VA Response
12/25/26B2 SolutionsWill the VA consider trenchless pipe rehabilitation methods (e.g., cured-in-place pipe lining) as an acceptable repair approach for this project, or does the scope require traditional open-cut excavation and pipe replacement?Amend 0002Yes, VA would consider trenchless pipe rehabilitation methods granted they are approved through the Illinois plumbing code.
22/25/26B2 SolutionsDoes this project involve any connection to or interface with municipal sewer or water systems outside VA property? If so, will the solicitation require contractors to hold an Illinois state plumbing license, or will an equivalent license from another state be accepted?Amend 0002This work will require Illinois State Plumbing License. The system does connect to Danville City sewer system.
33/9/26SterileCO. LLCWe need information for the 8-inch line labeled Pipe Location 1. We would like to request this line be televised and located: We need to know the location, length and depth of the pipe before it connects to a main line or a manhole.Amend 0002The VA does not intend to televise or locate the line. Televising and locating the lines will be the responsibility of the contractor should they desire.
43/9/26SterileCO. LLCWe need information for the 8-inch line labeled Pipe Location 1. We would like to request this line be televised and located: We need to know if the line goes to a manhole directly or connects to another main line.Amend 0002The VA does not intend to televise or locate the line. Televising and locating the lines will be the responsibility of the contractor should they desire.
53/9/26SterileCO. LLCWe need information for the 8-inch line labeled Pipe Location 1. We would like to request this line be televised and located.: We would also like to know the condition of the pipe and if it remains 8-inch or if it changes sizes.Amend 0002The VA does not intend to televise or locate the line. Televising and locating the lines will be the responsibility of the contractor should they desire.
63/9/26SterileCO. LLCWe need information for the 8-inch line labeled Pipe Location 1. We would like to request this line be televised and located.: We would also like to know if there are any additional connections to this line and their locations.Amend 0002The VA does not intend to televise or locate the line. Televising and locating the lines will be the responsibility of the contractor should they desire.
73/9/26SterileCO. LLCWe need information for the 4-inch line labeled Pipe Location 2. We would like to request this line be televised and located: We need to know the location, depth and its length under the floor in the mechanical room.Amend 0002The VA does not intend to televise or locate the line. Televising and locating the lines will be the responsibility of the contractor should they desire.
83/9/26SterileCO. LLCWe need information for the 4-inch line labeled Pipe Location 2. We would like to request this line be televised and located: We need to know its condition and how many connections there are under the mechanical room.Amend 0002The VA does not intend to televise or locate the line. Televising and locating the lines will be the responsibility of the contractor should they desire.
93/9/26SterileCO. LLCWe need information for the 4-inch line labeled Pipe Location 2. We would like to request this line be televised and located: 3.We need to know if it changes size and if there are any other access points to this line.Amend 0002The VA does not intend to televise or locate the line. Televising and locating the lines will be the responsibility of the contractor should they desire.
103/11/26A&R Mechnical Contractors IncWhen performing the sanitary sewer repairs and work, please clarify whether the existing abandoned piping and fittings located in the affected work area should remain in place, or if the contractor should remove and dispose of these components as part of the project work.Amend 0002Contractor should remove and dispose of all existing abandoned piping and fittings located in the affected work area.
113/11/26A&R Mechnical Contractors IncIf removal is required, please confirm the limits of removal and whether abandoned piping beyond the immediate repair area should remain.Amend 0002All piping abandoned during the course of this project should be removed before completion of this project.