This Performance Work Statement (PWS) details a juniper thinning contract for the Bureau of Land Management's Upper Snake Field Office in Fremont County, Idaho. The project involves manually cutting and scattering Utah juniper seedlings and saplings across 420 acres to reduce wildland fire risks and maintain sagebrush steppe habitat. The treatment area consists of young junipers ranging from 10-50 stems per acre, with most less than five feet tall and two inches in diameter.

The contract is set for performance between August 13 and September 30, 2025, with work limited to daylight hours and restricted on federal holidays. Key requirements include using GPS equipment, power-washing all machinery to prevent noxious weed spread, and maintaining strict fire prevention protocols. The contractor must provide all labor, equipment, and transportation, and will be responsible for detailed cutting specifications, including severing junipers at ground level, removing live limbs, and scattering slash within specified parameters. The project is designated as a Total Small Business Set-Aside under NAICS code 115310, with the government intending to award a single Firm-Fixed Price contract.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUREAU OF LAND MANAGEMENT – Upper Snake Field Office Performance Work Statement

2025 Cedar Hollow Juniper Thinning F-1

1. General: This is a non-personal services contract to provide for juniper thinning services. The Government shall not exercise any supervision or control over the providers performing these services. Such contract service providers shall be accountable solely to the Contractor who, in turn, is responsible to the Government.

1.1. Description of Services/Introduction: The Upper Snake Field Office (USFO), Bureau of Land Management (BLM) is acquiring services for fuels reduction to reduce the risk of wildland fires while improving sagebrush steppe and wildlife habitat. The Contractor shall furnish all personnel, tools, labor, supervision, equipment, materials, supplies, transportation, training, and incidentals necessary to perform juniper thinning services in accordance with the specifications provided.

1.2. Background: The Cedar Hollow Juniper Thinning Contract is a juniper treatment project focused on the removal of young seedlings and saplings from within a previously treated cut and burn unit. The treatment area consists of typical upper elevation sagebrush steppe habitat with intermixed Utah Junipers that have been encroaching into the lower elevation sites. Juniper densities within the treatment unit range from 10-50 stems per acre, with most less than five feet in height and two inches in diameter. Because of the scattered nature of the target vegetation within the treatment unit, not all acres within the established boundary of the unit will require the same amount of labor to achieve the specifications.

1.3. Objectives: The objective of this service to implement a maintenance thinning designed to remove young juniper seedlings and saplings that have resprouted/repopulated the site since the initial treatment in 2003.

The thinning is intended to maintain the current native vegetation composition and cover and retain its designation as sagebrush steppe habitat.

1.4. Scope: The work under this contract includes the thinning of 420 acres of Utah juniper seedlings and saplings through the manual cutting and scattering of treatment slash per contract specifications, (see Detailed Specifications 4.2.2).

1.5. Period of Performance: Treatment operations will begin on or after August 13, 2025, as soon as weather and site conditions are favorable. The Contracting Officer’s Representative (COR) will notify the contractor that favorable conditions have been met and the contractor shall be prepared to operations within three (3) calendar days of notification. All operations shall be completed no later than September 30, 2025.

Estimated Start Date: August 13, 2025

Required End Date: September 30, 2025

1.6. General Information:

1.6.1. Designation of Contracting Officer’s Representative: The Contracting Officer (CO) shall designate the COR and Project Inspector (PI). The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documentation executed by the CO prior to completion of the contract.

1.6.2. Hours of Operation: Work hours under this contract shall be limited to the time between one-half hours before sunrise to one-half hour after sunset each day. Work will not be permitted on Federal holidays, unless authorized by the COR.

1.6.3. Federal Observed Holidays: In addition to any holidays declared by Executive Orders, the following Federal Legal Holidays are observed: New Year’s Day, Martin Luther King Jr. Day, President’s Day, Memorial Day, Juneteenth, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, Christmas Day.

1.6.4. Place of Performance: Project area is located in Fremont County, Idaho approximately seven (7) miles northwest of Ashton, Idaho (T9N R32E Sec. 8, 9, 17 & 20). Access is made by way of E 1300 N and N 3125 E and unimproved two-track roads. The treatment area consists entirely of

BLM public land; however, private land is adjacent to but outside the treatment area. Elevations at the treatment site range from 5,200 feet to 5,500 feet. Acreage of the unit was determined by calculations based on a horizontal plane using GIS technology. See attached vicinity and unit location maps for general location of the project area. Site is accessible from native surface roads and by walk-in of up to 1.5 miles.

1.6.5. Pre-work Conference: Prior to commencement of work, a meeting may be requested by the CO to be attended by the Contractor, the COR and the PI. The meeting will be held at the project site or the Upper Snake Field Office at a time mutually agreeable to the Contractor and the CO to discuss the work schedule and to familiarize both parties with the responsibilities of each under this contract. At this time the Contractor shall provide to the COR a written "performance/work plan" that details dates, locations, equipment, and employees to provide for orderly completion of the work within the contract performance time. This work schedule must be acceptable to the Government. At a minimum, the schedule must reflect a work progress rate equal to the available amount of contract performance time.

1.6.6. Progress Reports: Contractor will provide weekly progress summaries, during treatment, to the BLM Representative (COR and/or PI). Regular communication between BLM Representatives and the Contractor is required to help alleviate any problems or potential delays.

1.6.7. Invoicing: Invoices shall be submitted through IPP for payment, after services have been performed with supporting invoice on company letterhead and referenced purchase order number.

Unit Costs offered must be “All-Inclusive” for materials, labor, transportation, surcharges, fees and services necessary and incidental to thinning services. Invoices shall reflect only those costs indicated in the Price Schedule. All expenses relating to maintenance and operation of equipment shall be considered in the all–inclusive pricing. The Contract will be considered completed and payment due when all areas furnished to the Contractor by the Government have been treated to the standards specified.

1.6.8. Project Boundary Marking: The location and access to the area is shown on the vicinity and unit location maps. Project area will not be marked prior to treatment, and it will be the responsibility of the contractor to navigate and identify the treatment boundaries with the supplied georeferenced maps provided by the BLM.

1.6.9. Access: Access to the project areas will be identified on the maps prior to the contractor starting the implementation phase. Access will be through private land and will require the contractor to remain on designated routes and ensure gates are left as they find them. Contractor will assume responsibility for any additional access if desired. If roads or any type of access become subject to damage, because of adverse weather conditions or other natural and or political reasons, the COR/PI will relay information to the contractor, and a Stop Work Order may be implemented by the CO until other access can be decided.

1.6.10. Notification of Cessation or Restart of Work: The Contractor will notify the COR whenever he/she intends to cease operations for three (3) or more days and will notify the COR before starting operations after a shutdown of three (3) or more days.

1.6.11. Personnel Requirements: The Contractor must always maintain an adequate work force to ensure timely completion of the work and is responsible for the crew knowing the requirements of the contract. The crew is also responsible for maintaining a safe working environment following OSHA standards. The Contractor must attend the pre-work meeting and provide a written performance/work plan including crew manifest prior to beginning work.

1.6.11.1. Key Personnel: The following personnel are considered key personnel by the Government:

A Contractor Representative/Foreman must be on-site at all times directing work. This person must be fluent in English and will also serve as an on the ground contact person for the COR/PI. Failure to maintain a Contractor Representative/Foreman will result in suspension of work until an acceptable on-the-ground Contractor Representative/Foreman is provided. A maximum of five (5) days will be allowed to produce a qualified Contractor Representative/Foreman. Failure to do so within five days may result in the CO issuing a Suspend Work Order. CO and COR must be informed of any changes of Contractor

Representative/Foreman. The contractor will also furnish a legible list of all contract employees (last name, first name) to the assigned COR. If there are any changes to the list of contract employees during the life of the contract a new list will be provided to the

COR.

1.6.12. Camping: Camping on agency-administered lands will only be allowed on site(s) pre-approved by an authorized officer. Camping areas for crews will be identified and surveyed for cultural resources prior to use of that camp location. Some camp sites including designated camp sites have been identified and cleared for use, ask the COR for details. The Contractor shall maintain all camping areas in an orderly and sanitary manner. The ordering and maintenance of portable toilets and dumpsters is the responsibility of the contractor. All fire regulations and restrictions shall be followed. All garbage and refuse shall be removed from the camp site(s) by the Contractor and disposed of offsite before final payment is made.

1.6.13. Risk and Damages: The Contractor shall assume all risks in connection with performance of the contract and shall be liable for any damages to persons or property in connection with the prosecution of the work, including the employees of the Contractor.

1.6.14. Protection of Improvements: The COR may order a cessation of work if vehicles are operated on roads within the work area when ground or weather conditions cause or lead to loss of traction.

Such conditions usually develop where frozen ground is thawing, when snow is melting, and during or immediately following rainstorms. Any soil and ground disturbance caused by equipment during and after operations will be rehabilitated.

1.6.15. Salvage Rights: No salvage will be allowed.

1.6.16. Safety

1.6.16.1. It is the responsibility of the contractor to ensure for the safety of employees and general public during treatment. The treatment area will remain open to public access and, as such, the contractor shall furnish warning signs to be placed at treatment area access points.

Should public safety become a concern, the contractor shall stop all operations and work with the COR/PI to resolve the issue.

1.6.16.2. The Contractor shall comply with all the applicable Idaho State Fire Prevention Laws, Restrictions, Rules, Regulations, and Standards. If a fire is started or discovered, work crews will immediately notify Eastern Idaho Interagency Fire Center (208) 524-7600. See Section 6 for additional information.

F-2

2. Definitions

2.1 Bole: The trunk or main stem of a tree.

2.2 Contractor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.3 Contracting Officer (CO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.4 Contracting Officer’s Representative (COR): An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.5 DBH: Diameter at breast height; the diameter of a tree measured at a point 4.5 feet above the ground on the uphill side of the tree.

2.6 Dead Tree: A standing tree with no crown, or less than 30% live crown, or a very thin crown with yellowing needles. Also includes green trees visibly infested with insects and/or diseases.

2.7 Deliverable: Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.

2.8 Equipment: A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale and does not ordinarily lose its identity or become a component part of another article when put into use. Equipment does not include material, real property, special test equipment or special tooling.

2.9 Key Personnel: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal. The prime contractor is responsible for performance of all subcontractors.

2.10 Leave Tree: The largest, healthiest, best-formed trees shall be selected as leave trees. ALL Aspen, Douglas-fir, Engleman spruce, sub alpine fir and Limber pine will be retained regardless of size.

2.11 Quality Control: All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.12 Safety Hazards: Any ground or above ground hazards that would pose a danger to Contractor’s personnel or operating equipment must be identified and mitigated by the Contractor prior to commencing operations.

2.13 Sapling: Young tree larger than a seedling but smaller than a pole (generally >4’ tall and <10.0” DBH).

2.14 Skid Trail: A path used during ground-based operations to move material or machinery from one area to another.

2.15 Slash: Any material cut by the Contractor, or which has been previously cut, either during logging or a previous maintenance treatment; the residue left on the ground after felling timber and brush.

2.16 Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

F-3

3. Government Furnished Property and Services

3.1. The Government will provide the following items to the Contractor:

3.1.1. Provide various USGS 7.5-minute quadrangles (1:24,000 scales) or GIS equivalent with clear cut project area boundaries clearly identified.

3.1.2. Provide GIS shapefiles of the project boundary in NAD84 coordinate system.

3.1.3. A georeferenced pdf map file will be provided that delineates the treatment perimeters. The Contractor must have a smart device capable of accepting and displaying georeferenced files.

3.1.4. A list of contacts, including emergency contacts, will be provided at the pre-work meeting.

F-4

4. Contractor -Furnished Items and Services

4.1. Equipment Requirements:

4.1.1. Unless otherwise specified, the Contractor shall provide all labor, transportation, materials, supplies, and equipment necessary to perform the work as described herein.

4.1.2. Ensure that all equipment is power washed and free of soil, seeds, vegetative matter, or other debris that could contain noxious weed seeds prior to being transported to BLM-administered land. In addition, if equipment is found operating in a noxious weed area, the equipment must be cleaned before leaving project or moving to another area.

4.1.3. GPS equipment must have an accuracy of +/- 10 meters and be capable of accepting/uploading shapefiles or track logs.

4.2. Service Requirements:

4.2.1. It shall be the responsibility of the Contractor (i.e., knowledge and experience of the crew leader) to determine the quantity of work needed to meet the specifications identified in this PWS.

4.2.2. Detailed Specifications: Cut and Scatter

4.2.2.1. Thinning unit (420 acres): No live limbs shall be left on the stumps of cut trees.

4.2.2.2. The material to be treated consists of live Utah juniper seedlings and saplings.

4.2.2.3. Cut and scatter all existing living material so that all top and side branches are free of the central stem and the slash does not exceed 6 inches in depth. Central stem length shall not exceed 4 feet.

4.2.2.4. Completely sever all live junipers with the stump height no taller than ground level on the uphill side. No live (green) limbs shall be left on the stumps of cut trees.

4.2.2.5. Felled seedlings and saplings within 50 feet of either side of any erosion rill or gully will “NOT” be placed in the erosion rill or gully.

F-5

5. Specific Tasks

5.1 Cut and Pile: The Contractor shall perform the thinning services in designated areas in conformance with these specifications. Unless otherwise specified, the Contractor shall furnish all personnel, tools, labor, supervision, equipment, materials, supplies, transportation, training, and incidentals necessary to perform the thinning services in accordance with the specifications provided (see Detailed Specifications 4.2.2).

Services shall be billed in accordance with pricing schedule.

F-6

6. Applicable Technical Orders, Specifications, Regulations, Manuals

6.1. Fire Prevention: Primarily for purposes of fire prevention and control, the Contractor shall comply with the following provisions:

6.1.1. Prior to starting operations during a closed fire season or periods of high fire danger, the Contractor shall prepare a fire prevention and fire control plan to the satisfaction of the COR.

6.1.2. Provide and maintain in good repair on the contract area the following equipment for use during a closed fire season or periods of high fire danger:

6.1.2.1. Firefighting tools shall be kept at vehicle staging areas or at such other place(s) as the COR shall designate whenever employees of the Contractor are working on the contract area. All firefighting tools shall be identified, organized, and easily accessible to all Contractor employees. The fire tools shall be in good condition, be tight on strong handles, and have sharp cutting edges. There shall be at least one (1) tool for each Contractor employee working on the contract area. Three-fourths (3/4) of all fire tools shall be shovels, hoes, or other scraping tools. The fire tools shall be used only for fighting fire.

6.1.2.2. A shovel in good condition with not less than a three (3) foot handle and a blade not less than seven and three-quarters (7 3/4) inches wide shall be within fifty (50) feet of any power saw when in operation.

6.1.2.3. Two (2) back-pack pumps at each vehicle staging area to be kept full of water and in good operating condition.

6.1.2.4. A serviceable chemical fire extinguisher of at least eight (8) ounces minimum capacity shall be carried during a closed fire season or period of high fire danger by each saw operator using a power saw on the contract area. Such fire extinguisher shall be filled and in operating condition and shall at all times be immediately available to the operator when the saw is being fueled or the motor of the saw is running. Any fueling of a power saw shall be done in an area which has first been cleared of all flammable material. Power saws shall be moved at least twenty (20) feet from the place of fueling before the engine is started. A shovel shall be available with each gas can when refueling. Each power saw shall be equipped with an exhaust system and a spark arresting device.

6.1.2.5. The CO may require additional fire tools and fire equipment as the fire danger may warrant.

Technical Exhibits:

DELIVERABLE FREQUENCY REFERENCE MEDIUM/FORMAT SUBMIT TO

Performance/Work Plan Once 1.6.5 Pre-work conference

By email in PDF format or hard copy COR

Crew Manifest Once, and as needed when crew manifest changes.

1.6.11 Personnel

Requirements

By email in PDF or scanned or hard copy COR

Progress Reports Once a week during treatment.

1.6.6 Progress

Reports By phone call or email COR

Required services table with AQL:

PERFORMANCE

TASK PERFORMANCE STANDARD ACCEPTABLE

QUALITY LEVEL

METHOD(S) OF

SURVEILLANCE

Cut and Pile (PWS 5.1)

Stump height no taller than ground level 95% Random inspection

Live limbs removed 95% Random inspection

Trees felled that meet specifications 95% Random inspection

Scattered slash within 6” of ground level 95% Random inspection