Attachment_1_140P1224Q0067_ROMO_AFM_SOW_2024.pdf

PDF 2 MB Posted

Attached to
Rocky Mountain National Park Automated Fee Machine
Solicitation number
140P1224Q0067
Issued by

About this file

This document is a Statement of Work for acquiring industry-standard, Commercial-Off-The-Shelf (COTS) Automated Fee Machines (AFMs) with necessary software to perform, process, document, and report sales transactions at various locations in Rocky Mountain National Park (ROMO).

The scope includes providing the AFM hardware, software, configuration, installation, training, technical support, system administration, and managed services for Payment Card Industry (PCI) standards compliance. The contractor must provide 11 AFM units at 6 different locations, with the option to increase the quantity up to 12 units. The AFMs must be capable of processing credit/debit card payments, including EMV chip and PIN/signature and Near Field Communication (NFC) payments, and generating sales and transaction reports. The contractor must meet various federal compliance requirements, including PCI DSS, Federal Information Systems Management Act (FISMA), Americans with Disabilities Act (ADA), and Section 508. The period of performance is from January 1, 2025 to December 31, 2029, with optional annual renewals. The government anticipates delivery of all 11 AFM units by December 31, 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Automated Fee Machine for

ROMO

Version Date:

04/23/2024

*Procurement Sensitive* Page 1 of 40

The scope of this acquisition is to acquire industry-standard, Commercial-Off-The-Shelf (COTS), Automated Fee Machine(s) (AFM) hardware with the necessary software to perform, process, document, and report sales transactions; allow user role access control and product item management.

The scope includes all necessary software, hardware, configuration and installation, configuration, training, technical support, system administration support, including managed services for Payment Card Industry (PCI) standards compliance of the AFM unit(s) and warranty. These/this unit(s) will be installed at Rocky Mountain National Park (ROMO) a U.S. Department of the Interior (DOI), National Park Service (NPS) site.)

The NPS considers an AFM to be a self-pay point-of-sale station. These stations are used to collect government fees at unstaffed park locations (such as but not limited to park entrances or visitor centers after business hours and/or in the off season), campgrounds, day use parking lots and boat launch areas.

AFMs are programmed to accept payment for a product, print a receipt showing proof of purchase, and in some cases dispense a plastic card product (e.g., park-specific annual pass), and generate sales and transaction reports.

Products and services acquired through this procurement must be compliant with the following:

Payment Card Industry Data Security Standards (PCI DSS) and the Payment Application Data Security Standards (PA-DSS), as applicable to the proposed solution; Executive Order 13681 (EO, Improving Security of Consumer Financial Transactions to meet EMV Chip and PIN security standards; OMB Circular A-123 ("Management's Responsibility for Internal Control"); Federal Information Systems Management Act (FISMA) IT security; Americans Disabilities Act (ADA); and Section 508 of the Rehabilitation Act requirements.

The contractor must provide an AFM(s) and services which meet the requirements of this SOW.

Description of Equipment, Software, and Connectivity by Location

AFM Equipment and Software Overview

The contractor must provide and install 11 AFM(s) at 6 different locations in the park. This contract may be modified to include additional AFM’s up to a maximum of 12 quantity.

See Section2.2 AFM Connectivity and Programming by Location for a description of each installation location, its surrounding area, connectivity availability, and installation orientation (direction machine will be facing).

AFM Connectivity and Programming by Location

Refer to the Table below for names of the AFM installation sites and connectivity options available at the time of this procurement. See Section 9.0 Description of Existing Machine & Kiosk, Pedestal, and Cabinet.

140P1224Q0067 ROMO AUTOMATED FEE MACHINES

https://www.pcisecuritystandards.org/ https://www.whitehouse.gov/the-press-office/2014/10/17/executive-order-improving-security-consumer-financial-transactions https://www.whitehouse.gov/the-press-office/2014/10/17/executive-order-improving-security-consumer-financial-transactions

ROMO

*Procurement Sensitive* Page 2 of 40

Some locations may have multiple connectivity options and others may have only intermittent connectivity. The contractor must outline how sites will maintain accountability and accuracy of sales transactions during connectivity disruptions.

If a wireless cellular signal is available as the Primary Connectivity or the contractor wants to propose using it if it is the secondary connectivity option, the contractor must acquire the service and manage the contract for this wireless cellular connectivity.

Table 1: AFM Connectivity and Programming by Location chart:

Location Name Primary Connectivity

Power Source

Quantity of AFM units

Type of programming:

See Sections 7.3 Quick-Pick

Comments

Wild Basin Entrance Station

Commercial Internet

Solar 1 In-lane Quick-Pick No cell service available.

Park will run commercial internet to AFM.

Lily Lake Trailhead

Cellular Solar 1 Walk-up Quick-Pick AT&T or Verizon

Beaver Meadows Entrance Station

Cellular Solar 3 In-lane Quick-Pick AT&T or Verizon

Fall River

Cellular 110v A/C 3 In-lane Quick-Pick AT&T or Verizon

Lump Ridge Trailhead

Cellular Solar 1 Walk-up Quick-Pick AT&T or Verizon

Grand Lake

Cellular 110v A/C

2 In-lane Quick-Pick AT&T or Verizon

ROMO

*Procurement Sensitive* Page 3 of 40

Park Map of the Six (6) AFM Locations

Software Licensing

Software purchased by the government is owned by the government. The contractor must identify all licensing requirements applicable to the hardware or software, including, but is not limited to the following:

• Applicable license renewal requirements and procedures.

• Number of users allowed and associated fees; user set up and registration, change process, limitations (e.g., use on all government computers or limited), etc.

• Other fees (e.g., transactional, monthly or annual fees for the use of software such as in Software-as-a-Service (SaaS) where the software is remotely hosted and accessed as a Web-based service).

• New releases and/or upgrades to software or firmware fees (include details about procedures for minor release to fix bugs and major release with new features; frequency of releases/upgrades).

ROMO

*Procurement Sensitive* Page 4 of 40

Services and Deliverables Provided by Contractor

The contractor must provide services to ensure the equipment and/or software is installed and operational according to the functional and compliance requirements of this SOW. Examples of services may include but are not limited to: installation and configuration, training, operation manuals and related documents, service level agreement (SLA) and technical support, repairs and warranty terms, and system administration. In order to provide these services, the contractor must:

• Adhere to IT Security requirements; see Appendix-IT and Security Requirements.

• Maintain all payment application devices, software, and/or hardware included in the Cardholder Data Environment (CDE) and supported by this contract in accordance with the PA-DSS Implementation Guide for credit card application devices.

The contractor will not be granted DOI NPS network access to provide direct support for the installation, technical support or system administration of the solution as the machine will be using Cellular connectivity for communications and will not be placed on the NPS network. The Contractor must coordinate with and support an authorized NPS employee who will perform these functions based on guidance from the contractor. The contractor must indicate whether or not the NPS employee must be an IT Specialist, otherwise, the NPS will designate a non-IT NPS staff person as the point of contact.

Installation and Configuration Services

Installation Plan

The contractor must gather information from the park and provide an installation plan that includes the following considerations:

• Infrastructure, connectivity and communications (if applicable) and power type and availability options that must be in place at the installation site prior to installation (e.g., machine pedestal, power, etc.).

• List of all peripherals and supplies required to be supplied by the park and available for the installation and to begin operations (e.g., receipt paper, surge protectors, etc.)

• Detailed network description and/or diagram of hardware, other related equipment and software with names, locations, type of connectivity and IP addresses (if applicable and known).

• Milestone dates and tasks for configuring, testing, installing, training, and implementing.

• NPS information required by the contractor for installation and staff training logistics (e.g. the following and any additional information):

o Location and positioning of the equipment to minimize environmental impacts and other obstacles that could impede successful use of the machine (e.g., glare, direct sunlight, driving rain, hail, sand, prevailing winds, etc.).

o Timing considerations for installation (e.g., during park business hours, before park opens, after park closes, etc.).

o Access to NPS buildings and/or computers requiring an NPS escort or NPS staff with appropriate computer permissions (e.g. IT Specialist with administrative rights to install software).

ROMO

*Procurement Sensitive* Page 5 of 40 o Travel time, road conditions/closures, seasonal traffic, etc. to/from/between installations (e.g., congestion, periods of high visitation, inclement weather, distances, etc.).

o Contact numbers for NPS staff, installation team, collection locations, main switchboard, etc.

o Communication constraints (e.g., poor cell phone reception).

o Training, planning and logistics facility with adequate Internet connection, audio visual equipment support, access, size, etc.

Installation

The contractor must install the equipment and software at the locations described in Section 2.2 AFM Connectivity and Programming by Location. During Installation, the AFM and its software must be configured according to Section 4.0 Credit Card Compliance, Processing, and Programming, Section 6.0 AFM Functional and Technical Equipment, and Section 8.0 Products to Program.

Upon installation, the contractor must also test data transfer and sales activity processing, and successful card authorization and settlement by completing the following:

3.1.2.1 Testing of Configuration after Installation

The contractor must configure the equipment and software, test the configuration and verify accurate sales of products, receipt generation, data transfer and sales activity processing, including transaction authorizations and settlement, prior to operation. This test must be coordinated with the park’s installation point of contact.

The contractor must perform a test in the production environment before the unit is put into operation to ensure the credit card merchant account authorization and settlement is correct.

The Contractor must coordinate with the park POC to verify that the test funds reached the proper GL Revenue Account in the NPS Accounting Operations Center (AOC) daily summary report of credit card deposits prior to live credit card sales being performed.

3.1.2.2 Install According to PA-DSS Implementation Guide

The contractor must install payment systems in accordance with the PA-DSS Implementation Guide for the payment application device and must deliver:

• The PA-DSS Implementation Guide for the credit card payment application installed in the equipment or software.

• Documentation attesting and verifying that configurations and installations have been performed according to the PA-DSS Implementation Guide.

3.1.2.3 Post Installation and Acceptance report

Within five (5) days after an installation, the contractor must provide the NPS a report detailing the following:

• An updated network diagram of the equipment and software installed by collection location name, machine names, type of connectivity, and IP addresses.

• Follow-up items to be completed by the contractor or NPS.

ROMO

*Procurement Sensitive* Page 6 of 40

• Special notes, observations and/or obstacles identified during the installation.

• Training performed during the installation and remaining training to be provided.

• Installation completion acceptance document for Park Contracting Officer’s Representative

(COR) to sign acknowledging that the installation is complete.

Training

Onsite Training

The contractor must provide a comprehensive training session that includes a detailed agenda with objectives and outcome. There must be at least one (1) onsite training session for park end-users.

The contractor must provide the NPS with an electronic version of the training materials in Microsoft Word or PowerPoint at least [one (1) week in advance of the installation and at least [one (1)] printed copy.

Training must cover the use and maintenance of the equipment and software to include at minimum the following topics:

• User operations: logging on/off; performing transactions, generating operational and sales reports, etc.

• Manager operations: adding and deleting authorized users, modifying products (i.e., adding products, changing prices, question prompts, editing receipt header and footer, etc.), generating reports, etc.

• Maintenance and troubleshooting guide: adding paper, clearing a paper jam, changing components, minor repairs, routine schedule of maintenance items to perform, common troubleshooting issues etc.

• Help Desk procedures and contact information: level of service that will be provided, hours of contracted SLA, phone number(s), email, website, and shipping address.

Manuals and Documentation

PA-DSS Implementation Guide

The contractor must deliver its Payment Card Industry (PCI) Payment Application Data Security Standards (PA-DSSP) Implementation Guide for the delivered system’s integrated credit card payment application.

The contractor must also provide clear, detailed instructions describing park responsibilities for maintaining PCI DSS and PA-DSS compliance.

User Manuals

The contractor must deliver the user manual in an electronic format and at least one (1) printed user manual per piece of equipment and/or per software license. User manuals must clearly explain all functions of the equipment and software including operations, programming products and users, maintenance, and troubleshooting.

ROMO

*Procurement Sensitive* Page 7 of 40

Updated Manuals and Documentation

Within 30 days of any software or hardware update or new release, the contractor must provide the park with an updated user manual (electronic format) describing operational and technical changes. If the change is minor, a technical bulletin will be acceptable.

SLA and Technical Support

The contractor must provide technical support for the equipment and software to keep it operational with minimal down-time. The contractor must describe the technical support in writing in the form of a Service Level Agreement (SLA).

Service Level Agreement (SLA)

Items to be included in the technical support SLA:

• Support Mode: Methods by which users may access and receive assistance/service.

• Service Availability: Days and times when technical support will be available.

• Time Limit for Call Waiting: Average and maximum times that users may have to wait before speaking with a Support Representative.

• License Renewal Process: Timing and process for license renewal (if applicable).

• Access to Configurations: Methods by which contractor’s technical support team will access the park’s AFM(s) and software application to provide remote support.

• Patch Deployment Time: Verification that critical security patches will be deployed no more than one month from patch release, in accordance with PCI DSS Requirement 6.1.

• Hardware Repair: Options, availability and expected arrival time for hardware repairs, loaner parts, and spare parts to be received and operational at the park.

• Issue Resolution Time: Average and maximum times between report of a problem and resolution.

Help Desk Support Modes

The contractor must provide helpdesk support at minimum through the following modes: telephone and email.

Technical Support Days and Hours of Service

The Contractor’s proposal may include various service levels and pricing models (e.g., annual, monthly, or hourly support, 8-5 technical support vs. 24x7, etc.) along with the associated costs.

The contractor must provide technical support that meets the following minimum service level requirements:

3.4.3.1 Minimum Days and Hours of Service

The contractor must provide at minimum, unlimited remote support Monday thru Friday (excluding federal holidays), from 10:00 AM - 7:00 PM Eastern Time.

ROMO

*Procurement Sensitive* Page 8 of 40

3.4.3.2 Expanded Hours of Service

The contractor must provide expanded hours of coverage with unlimited remote support from 8:00AM- 8:00PM Eastern Time.

Urgent Technical Support Requests

The contractor must provide urgent* technical support to users according to the following minimum parameters:

• Response Time: 30 minutes for initial acknowledgement of the technical support request.

• Proposed Resolution Time: Resolution of the issue within two (2) hours, 95% of the time, unless it requires the shipment of a replacement part which must be shipped according to the contractor’s SLA.

*Urgent defined: Technical Support request conditions when one or more registers, printers, or card readers that are down at a location without an alternative or backup unit.

Normal Technical Support Requests

Contractor must resolve normal* technical support requests within the following parameters:

• Response Time: Two (2) hours for initial acknowledgement of the technical support request

• Resolution Time: Resolution of issue within four (4) days, 95% of the time.

*Normal Technical support requests may include, but are not limited to:

• Responding to questions about usage of the system

• Providing technical support to a NPS non-technical employee to troubleshoot and repair equipment

• Direct database manipulation or repair

• Modifying existing or adding new items/products

• Upgrade of software licenses

• Fixing or providing a workaround software bugs

• Diagnosing and resolving communications issues between the equipment, software, and any connections like the NPS designated processing bank

• Diagnosing and resolving credit card payment processing issues

• Fixing reporting errors

Report of Technical Support

The contractor must deliver within ten (10) business days following the end of a quarter*, a help desk summary report for the previous quarter’s help desk activities.

The report must be formatted to print either Letter or Legal size, with title of document and date created in header, page count in “page 1 of #” format in footer. If the contractor provides the park point of contact (POC) access to an online help desk system with the required information a report submission is not necessary.

The report must include at minimum the following information:

ROMO

*Procurement Sensitive* Page 9 of 40

• Date and time support, requested including hardware repairs and software upgrades.

• Short title to describe the nature of the support request.

• Name of person submitting request.

• Outstanding support requests by priority.

• Time to resolution for each support request.

• Resolutions outside of the allowable limits, per the SLA.

*Quarters defined: Qtr1-October through December; Qtr2-January thru March; Qtr3-April through June;

Qtr4-July through September.

Remote Technical Support

The contractor must provide remote technical support to a NPS employee who can perform non-technical tasks. The contractor’s technician may also access the equipment or software as long as they are compliant with the contractor access requirements described in Appendix-IT and Security Requirements.

Onsite Technical Support

If troubleshooting remotely does not resolve the hardware or software issue and the issue is not covered by the products warranty or contractors SLA, the contractor must provide an option for the government to procure onsite technical support through a contract modification, sections 3.5.2 Warranty for Hardware and 7.6 Travel apply to this requirement.

Hardware Repairs

Hardware Repairs

As part of the warranty, the contractor must perform remote troubleshooting of hardware supported under this SOW by guiding a NPS employee through performance of non-technical tasks with the equipment.

The contractor must describe the necessary tools for NPS employees to have on hand in order to perform the troubleshooting or repairs. If specialized tools are necessary, the contractor must provide them in a toolkit with the delivery of the AFM.

If remote technical support does not resolve the problem and the problem is not covered under the warranty the park may ship, at the park’s expense, the hardware to the contractor for repair.

Prior to initiating the repair and as part of the services provided in this SOW, the contractor must provide a description of repair needed, including the costs and estimated time of the repair of any parts that are out of warranty. The parts may either be ordered through a contract modification or purchased under the micro purchase authority based on the price list included in the contracts bid schedule.

Warranty for Hardware

The contractor must provide warranty support for any hardware provided through this contract. The contractor may propose the terms and delivery method for the warranty support.

ROMO

*Procurement Sensitive* Page 10 of 40

Items that must be covered in a warranty include:

• Length of Warranty.

• Point at which warranty begins.

• Warranty reporting procedures.

• Maximum time from defect report to equipment replacement or repair.

• Duration of warranty for replaced equipment.

• On-site vs. remote warranty service.

• Cost and process for extended warranties.

Return Material Authorization (RMA)

The contractor must provide a description of their Return Material Authorization (RMA) process for the repair of hardware under warranty.

Loaner Parts during Hardware Repairs

The contractor must provide an option in their SLA for the park to purchase loaner parts or equipment while the park’s part or equipment is under repair. The SLA must address how quickly the loaner parts may be expected to be available and shipped to the park.

Spare Parts

The contractor must provide a spare parts price list with the bid schedule which the park may purchase in order to make an emergency repair. The spare parts price list may be used for replacing parts during repairs of hardware that are out of warranty or to have on hand for immediate use. The spare parts price list should include individual and packages of the most common spare parts. Remanufactured parts must be indicated on the bid sheet for parts.

As part of Section 3.4.1 Service Level Agreement (SLA) and 3.5.1 Hardware Repairs, the contractor must provide remote technical support to the park POC who will install the spare part.

Destruction of Storage Devices

If any data storage device is removed from the AFM and is not reinstalled in the NPS AFM, the contractor must provide the NPS with certification that the data storage device was destroyed per guidelines in Draft NIST Special Publication 800-88 Revision 1, September 2012 or later.

Managed Services (PCI)

PCI DSS is a multifaceted security standard that includes requirements for security management, policies, procedures, network architecture, software design and other critical protective measures. This comprehensive standard is intended to help organizations proactively protect customer account data.

For requirements related to PCI DSS see Section 4.1 Credit Card Compliance. More information can be found at https://www.pcisecuritystandards.org/.

https://www.pcisecuritystandards.org/

ROMO

*Procurement Sensitive* Page 11 of 40

Managed System Administration Services

The payment device must be capable of processing Near Field Communication (NFC) transactions for contactless payments, supporting Apple Pay, Google Wallet and all other similar NFC-based payment systems before or when EMV Chip and PIN/signature processing is configured and functional. P2PE PTS 3.X Payment Device Hardware Encryption, the contractor must provide managed system administration in compliance with the PCI Data Security Standard (DSS).

Managed system administration services are defined as:

• Maintenance of firewall configuration on the deployed solution to prevent unauthorized access (DSS Requirement 1)

• Initial and ongoing configuration management and hardening of the underlying operating system (DSS Requirement 2)

• Regular updates to antivirus software (DSS Requirement 5)

• Updates and patching of operating system and critical software (DSS Requirement 6. 1)

• Logical access control, user account management, password and account lockout management and management of access control lists (DSS Requirements 7 and 8)

• Secure, remote access using two-factor authentication (DSS Requirement 8.3)

• Monitoring server security and reporting incidents (DSS Requirement 10)

• Vulnerability scanning and management – from within the network on which the equipment or software sits only (DSS Requirement 11.2)

• Host intrusion detection/prevention (DSS Requirement 11.4)

• File integrity monitoring (DSS Requirement 11.5)

Required Managed Services for Merchant PCI Compliance

The managed system administration services requirements in this solicitation will depend on the method by which the card processing payment devices or software will connect to the Internet.

The Managed Services for Merchant PCI Compliance table below shows managed services in each row;

the columns represent the various connectivity options. The contractor must perform the Managed Services based on the connectivity implemented at each location, as described in Section 2.2 Connectivity and Programming by Location, for the fields labeled as “Required by Contractor”. For example, maintenance of the firewall configuration on the network providing connectivity to the unit is required under this contract if the unit is connected via Commercial ISP but not if directly connected to the NPS Enterprise Service Network (ESN).

ROMO

*Procurement Sensitive* Page 12 of 40

Managed Services for Merchant PCI Compliance

DSS

Requirement

P2PE

PTS 3.x

Wireless Cellular

Direct ESN VSAT

ESN

Commercial

ISP

Hardware

(L2L) VPN

Analog Only No Connection

Maintenance of firewall configuration on the deployed solution to prevent unauthorized access

1 Not Applicable

Required by Contractor

Performed by NPS

Performed by NPS

Required by Contractor

Performed by NPS

Not Applicable

Not Applicable

Initial and ongoing configuration management and hardening of the underlying operating system

2 Not Applicable

Required by Contractor

Required by Contractor

Required by Contractor

Required by Contractor

Required by Contractor

Required by Contractor

Not Applicable

Update of antivirus software (DSS Requirement 5)

5 Not Applicable

Required by Contractor

Required by Contractor

Required by Contractor

Required by Contractor

Required by Contractor

Not Required Not Applicable

Updates and patching of operating system and other critical software (DSS Requirement 6.1)

6.1 Not

Applicable

Required by Contractor

Required by Contractor

Required by Contractor

Required by Contractor

Required by Contractor

Required by Contractor

Not Applicable

Logical access control, user account management, password and account lockout management and management of access control lists (DSS Requirements 7 and 8)

7,8 Not Applicable

Required by Contractor

Required by Contractor

Required by Contractor

Required by Contractor

Required by Contractor

Required by Contractor

Performed by NPS

Secure remote access using two-factor authentication (DSS Requirement 8.3)

8.3 Not

Applicable

Required by Contractor

Required by Contractor

Required by Contractor

Required by Contractor

Required by Contractor

Required by Contractor

Not Applicable

Monitoring of server security and incident reporting (DSS Requirement 10)

10 Not Applicable

Required by Contractor

Performed by NPS

Performed by NPS

Required by Contractor

Performed by NPS

Required by Contractor

Not Applicable

Vulnerability scanning and management

– internal only(DSS Requirement 11.2)

11.2 Not

Applicable

Required by Contractor

Performed by NPS

Performed by NPS

Required by Contractor

Performed by NPS

Required by Contractor

Not Applicable

Host intrusion detection/prevention (DSS Requirement 11.4)

11.4 Not

Applicable

Required by Contractor

Performed by NPS

Performed by NPS

Required by Contractor

Performed by NPS

Required by Contractor

Not Applicable

File integrity monitoring (DSS Requirement 11.5)

11.5 Not

Applicable

Required by Contractor

Required by Contractor

Required by Contractor

Required by Contractor

Performed by NPS

Required by Contractor

Not Applicable

ROMO

*Procurement Sensitive* Page 13 of 40

Validation of Managed Service Providers for Merchant PCI DSS Compliance

The contractor must achieve and maintain PCI DSS compliance for all of the managed services they are providing in accordance with the current version of PCI DSS published by the PCI Security Standards Council.

Annually, the contractor must provide validation of PCI compliance in the form of:

• A current Attestation of Compliance (AOC) that verifies compliance with the PCI DSS and,

• The executive summary from the Report on Compliance (ROC) or,

• A statement from a PCI Qualified Security Assessor (QSA) which certifies the scope of services covered by their annual assessment and states that the contractor’s AOC includes all relevant services related to their contract with the NPS.

The contractor must provide with their proposal either (a) the above documentation or (b) a statement that the contractor will provide the above documentation within three months of the award of the contract.

PCI DSS Compliance for Managed Services

PCI Managed Service providers must be on the Visa Global Registry of Service Provider, see Validation of Managed Service Providers and 4.1.9 PCI Data Protection Addendum Contract for more details.

Service Providers

Service providers used to store or manage NPS credit cardholder data must be registered through the Visa Global Registry of Service Providers as a validated Level 1 Service Provider.

PCI Data Protection Addendum

Upon award of a contract for this SOW, the contractor must sign the Attachment: PCI Data Protection Addendum.

Report of Managed Services

The contractor must deliver a summary report for the previous quarter’s system administration activities within 10 business days of end of each quarter. This report must include all:

• System configuration changes

• Patches applied

• Vulnerabilities and the remediation performed

• Data recovery activities http://www.visa.com/splisting/index.html

ROMO

*Procurement Sensitive* Page 14 of 40

Software Restoration and Backup Services

If ordered on the contract, the contractor must perform additional services of restoring or migrating software to a new location.

If the contractor requires a park employee to assist, the contractor must notify the park what information is needed to conduct the restoration or migration. This includes specifying the park resources needed (e.g. scheduling specific time with the park employee(s) such as Park IT Specialists and identifying the time needed to complete the restoration or migration).

Software Restoration

If ordered on the contract, the contractor must restore the software after a computer/server failure.

Restoration includes but is not limited to:

• Restoring park-specific configuration files and equipment programming and,

• Restoring recoverable transactional data files, and

• Restoring equipment communications.

Migration of Software to New Location

If ordered on the contract, the contractor must move the current software and transactional data files from an existing computer or server to a new one designated by the park. This includes but is not limited to:

• Installing current versions of the applicable software to the new computer or server,

• Ensuring all transactional data files, including any archived data, has been transferred properly, and

• Ensuring communications to/from the all equipment is functioning properly.

Software Configuration Back-up

The contractor must provide a current copy of the hardware and software system configuration as a back-up for restoration in case of equipment failure.

The contractor must either maintain the backup themselves or provide a written process for the park to maintain the back-up.

Notification and Scheduling

If the contractor requires a park employee to assist with any upgrade or relicensing, the contractor must schedule at least 14 calendar days in advance.

The contractor must communicate to the park employee what information is needed, how much time installations or upgrades will take, and whether specialists (e.g., Park IT Specialists) are required in order to complete the upgrade or relicensing.

ROMO

*Procurement Sensitive* Page 15 of 40

Upgrades to Current Versions of Software

The contractor must upgrade all equipment, payment applications, and back-office applications with the most current version of software or firmware available. The Contractor must notify the park within thirty (30) days of notification of software upgrades for any purchased equipment. Applicable upgrades must be implemented by the contractor within ninety (90) days. Available upgrades that address security vulnerabilities must be implemented by the contractor within thirty (30) days.

Credit Card Compliance, Processing, and Programming

Credit Card Compliance

Processing and Certification with Treasury-Designated Payment Processor

US Treasury regulation requires all credit card transactions collected by or on behalf of the government be deposited directly into a US Treasury NPS designated account through the Treasury’s Financial Management Services (FMS) Card Acquiring Service (CAS).

The contractor’s payment application software or device for processing credit card payments must be certified with the Treasury-designated payment processor (currently Vantiv’s Tandem processing platform).

Comply with FMS and Card Brand Card Processing Rules and Regulations

All card processing must follow the US Treasury Financial Manual (TFM) Part 5 – Chapter 7000: Credit and Debit Card Collection Transactions and individual Card Brand Operating Regulations and Mandates.

The contractor must comply with any applicable rules and mandates in these regulations and mandates.

Accepted Card Brands

The payment application software must be able to process visitor tenders of the Treasury designated credit card brands (Visa, MasterCard, Discover, American Express, Diners Club International, JCB, and China Union Pay). The payment application devices must be able to be modified to match any changes to the credit card brand options made by Treasury.

PA-DSS Contract Requirements for Hardware/Software

The Payment Application Data Security Standards (PA-DSS) identifies the security controls with which the proposed solution must comply and ensures a payment application can be deployed in a way that will not negatively impact a merchant’s PCI DSS compliance.

The contractor must ensure that any credit card payment application version used in processing NPS cardholder data is a current, PA-DSS validated payment application.

http://fms.treas.gov/cas/index.html http://fms.treas.gov/cas/index.html http://fms.treas.gov/cas/rules.html http://fms.treas.gov/cas/rules.html

ROMO

*Procurement Sensitive* Page 16 of 40

4.1.4.1 PA-DSS Validation Requirement

The PCI-DSS identifies the Payment Applications Data Security Standards (PA-DSS), security controls with which a payment application must comply. The contractor must ensure that any credit card payment application version used in processing NPS cardholder data is a current PA-DSS validated payment application. PA-DSS validation is specific to a payment application version number and includes a revalidation date and an expiration date.

The contractor must provide the specific name and version number of their payment application, and must demonstrate that this name and version number have been validated as PA-DSS compliant.

Refer to the database of Validated Payment Applications for details.

4.1.4.2 PA-DSS Implementation Guide Requirement

The contractor must ensure that the payment application is deployed in accordance with the instructions detailed in the PA-DSS Implementation Guide for the specific product suite and version that is associated with its PA-DSS validation.

The contractor must include the PA-DSS Implementation Guide as part of their proposal, and must ensure that the document includes appropriate proprietary markings.

EMV Chip and PIN Technology

New, replacement, and upgraded credit card processing devices must be capable of supporting Europay, MasterCard and Visa (EMV) functionality.

4.1.5.1 EMV Chip and PIN and Signature Capable

The equipment must be delivered with the credit card payment device capable of supporting EMV chip and PIN and chip and signature processing.

4.1.5.2 EMV Chip and PIN and Signature Functional

Credit card payment device must be functional for chip and PIN and chip and signature transactions. At or before delivery of this functionality, the contractor must provide proof of certification from Treasury’s designated payment processor.

At or prior to delivery, the contractor must provide instructions and operating procedures for chip and PIN and chip and signature processing in an electronic format that includes the following items: start up guide and troubleshooting guide.

Near Field Communication (NFC) Payments

The payment device must be capable of processing Near Field Communication (NFC) transactions for contactless payments, supporting Apple Pay, Google Wallet and all other similar NFC-based payment systems before or when EMV Chip and PIN/signature processing is configured and functional.

https://www.pcisecuritystandards.org/approved_companies_providers/vpa_agreement.php

ROMO

*Procurement Sensitive* Page 17 of 40

P2PE PTS 3.X Payment Device Hardware Encryption

Any payment devices that accept credit cards and communicate over an IP/SSL connection, including satellite or commercial DSL, must be compatible with the PCI PIN Transaction Security (PTS) 3.X standard and be deployed as part of a Point-to-Point Encryption (P2PE) solution supported by Vantiv.

The contractor must propose, configure, and install P2PE PTS 3.x credit card payment application device at each AFM which communicates using an IP connection.

NOTE: The contractor may propose to NOT implement this requirement and instead provide the services required under Section 3.6 System Administration (Managed Services) for the implemented connectivity.

4.1.7.1 P2PE Encryption and Processing per Transaction Fees

The contractor must include the encryption and/or transaction fees charged by the encryption provider, which may be a 3rd party gateway provider, supported by the Treasury designated bank Vantiv.

Below is a monthly estimate through this contract’s period of performance:

Month Estimate of Credit Card Transactions

January 500 February 500 March 1000 April 1000 May 2000 June 2500 July 3500 August 3000 September 2500 October 2500 November 1000 December 1500 Total

4.1.7.2 Magnetic Credit Card Readers

If IP/SSL is used for connectivity, any magnetic strip reader (MSR) as part of the equipment solution must be PTS 3.x validated or they must be deactivated from reading the Cardholder Data Primary Account Number (PAN) and/or the Sensitive Authentication Data (SAD).

ROMO

*Procurement Sensitive* Page 18 of 40

Credit Card Processing

Credit Card Authorization

The payment application solution must be able to obtain a credit card authorization and print a receipt in a pre-determined amount of time, set by the system administrator (i.e., 60 seconds for a dial-up, analog connection or 5 seconds for an IP connection). If this threshold is exceeded, the payment application must force the transaction and obtain authorization upon connection.

The AFM should allow the same credit card to be used more than once on the same day at any one machine and for the same dollar amount. This occurs when a visitor is purchasing a variety of pass or permit types that may have varying expiration dates.

If the AFM cannot be programmed to NOT allow the same credit card to be used more than once in a day, it must allow payment for multiple products as a single transaction but print separate receipts for each product/item with the relevant expiration dates. For example, a visitor pays for a campsite for 4 days and a 1-day boat permit during a single transaction. The visitor’s total would reflect the sum due for the campsite and the boat permit, but s/he would receive individual receipts for the campsite and the boat permit, showing the appropriate expiration date for each.

Intermittent / Offline Store and Forward

When connectivity is intermittent or offline for an unexpected reason and communications are not available for card authorization-after a designated period of time (e.g 15 seconds for IP and 60 seconds for dial-up connections), the payment application solution must securely (according to PCI DSS Standards) capture, process, store and forward the authorization request as soon as the network connection to the authorizing bank is reestablished.

All transactions stored in the offline mode and then rejected must be documented and included in a report to the NPS.

Cardholder Data Storage

No cardholder data may be stored in the machine, even if encrypted, after authorization or after settlement of any transaction.

Credit Card Programming

Merchant ID Account (MID)

The payment application device or software must use a Merchant ID (MID) account obtained from the US Treasury’s Fiscal Services- designated processor and its platform for each collection location.

The contractor must provide the name of the PA-DSS Validated payment application software that will be handling the credit card authorization and settlement.

ROMO

*Procurement Sensitive* Page 19 of 40

Upon award for implementation, the contractor must provide any additional information necessary for the Park POC to submit the application to create the MID account.

Terminal ID (TID) and Terminal Number (TIN) for MID

The contractor must program the payment application to ensure each AFM has a unique Terminal ID (TID)/TIN associated with a MID. This is required for the NPS fee collection equipment inventory purposes.

The contractor must work with the park and Treasury’s processor (Vantiv) to determine when there should be unique merchant IDs (MIDs) for multiple AFM units versus allowing multiple AFM units to share a single MID with unique TID/TINs.

The contractor is responsible for properly programming and providing a report of the payment application devices and software with the correct MID and TID/TIN.

Test Equipment and MID

Contractors, in coordination with NPS park/site and Vantiv, must conduct test transactions to ensure that the equipment is properly programmed before the equipment is operational and available to accept cards from visitors.

Cardholder Data Security on Reports

Credit cardholder data must be masked on all reports. If the PAN is included in any report, no more than the first 6 digits and the last 4 digits may be printed. The card expiration date and CVV number must never print. The contractor must handle and process cardholder data per PCI DSS standards as well as any requirements of the Fair and Accurate Credit Transactions Act (FACTA).

Federal and IT Compliance Requirements

Federal IT Security and Network Access

Protecting the NPS network and the visitor information is a high priority and compliance with all relevant security policies is essential. The contractor must agree to adhere to all relevant security standards.

Any user accessing the NPS ESN through the software VPN must have and use current NPS active directory credentials and a Personal Identity Verification (PIV) card (“smart card”). If the contractor requires access to the DOI/NPS network to support the equipment or software, refer to the procedures and requirements in Appendix: IT and Security Requirements.

ROMO

*Procurement Sensitive* Page 20 of 40

Section 508 of the Rehabilitation Act

In 1998, Congress amended the Rehabilitation Act of 1973 to require Federal agencies to make their electronic and information technology (EIT) accessible to people with disabilities. Inaccessible technology interferes with an ability to obtain and use information quickly and easily. Section 508 was enacted to eliminate barriers in information technology, open new opportunities for people with disabilities, and encourage development of technologies that will help achieve these goals. The law applies to all Federal agencies when they develop, procure, maintain, or use electronic and information technology. All EIT procured under this RFP, including [EQUIPMENT] units and software applications, must comply with the requirements of Section 508. Additional information about Section 508 compliance can be found at http://www.section508.gov.

The contractor must complete Attachment– AFM Section 508 Accessibility Requirements for the applicable requirements. The contractor must indicate the compliance of the proposed solution as:

Fully, Partially, Not, or Don’t Know.

Americans Disabilities Act (ADA) Accessibility

The physical AFM must comply with the Americans Disabilities Act (ADA) accessibility requirements applicable to their design, user options and interfaces.

• All AFMs must be no more than 48 inches above ground to ensure customer operated controls are accessible.

• More information on accessibility can be found at:

http://classicinside.nps.gov/documents/Basic_ADA_Accessibility_Guidelines_for_AFM%27s.pdf and http://www.access-board.gov/adaag/ADAAG.pdf

AFM Functional and Technical Equipment

Following are the functional requirements section defines the requirements that the AFM units must meet.

AFM Unit Basic Functional Requirements

The NPS uses terminology developed by the parking industry to describe choices or options available through an AFM. Two program options used by the NPS: “Quick-Pick” and “Pay-by-Space.” Refer to 2.2 AFM Connectivity and Programming by Location for the programming type for each machine.

Whichever program is selected, they must both meet the following basic requirements:

Ease of Transaction Processing

The AFM must have a user-friendly interface to prompt the customer through the purchase process in a clear and timely manner (e.g., payment and tender options, instructions for exchanging the AFM receipt for the appropriate product (entrance pass, camping permit, etc.), other information as necessary.

Menu prompts should be simple, instructions clear, and ease of use intuitive.

http://www.section508.gov/ http://classicinside.nps.gov/documents/Basic_ADA_Accessibility_Guidelines_for_AFM%27s.pdf http://www.access-board.gov/adaag/ADAAG.pdf

ROMO

*Procurement Sensitive* Page 21 of 40

Product Pricing

The AFM programming must be flexible to allow sales of multiple products at varying prices. Park staff with the appropriate user rights must have the ability to change pricing for each product. See Section 8.0 Products to Program for a draft of product pricing. The contractor must review and confirm the product pricing with the designated park POC.

Applying a Discount to a Product

The AFM programming must allow for a configurable discount function. Any future system expansion could include campground AFMs, which would require this functionality.

The specific business practice is for when the visitor owns an Interagency Senior or Access Passport, s/he qualifies for a 50% price discount on a specific product such as camping. The AFM must be able to:

• Prompt the visitor for the six (6) to nine (9) digit pass number associated with the discount.

• Calculate the appropriate price discount and prompt for payment that includes the discount.

• Allow the passport number entered must to be displayed on the receipt.

• Limit/restrict to not allow the Senior or Access Interagency pass number to be used for a discount for more than one product per transaction. If feasible, the program should restrict the use of a specific number to one transaction for the duration of its use (for example, the discount will only apply to one campsite at a time for the duration of the visit).

• Park staff, with the appropriate user rights, must have the ability to change the discount percentage for each for each product.

Multiply Price Charged by Quantity Entered

The AFM program must be configured to multiply the product by a quantity input by the visitor and then calculate the price for the total number of products and the payment due.

6.1.4.1 Apply specific question prompts for multiplying the rate

The AFM will prompt the visitor to enter the quantity for each product being purchased based on specific question prompts (e.g., “How many camping nights are you camping?” or “How many people?”

or “How many daily entrance fee receipts?”). See section 8.0 Products to Program for the specific questions per rate.

Calculate Expiration Date & Time for Valid Thru Date

The AFM program must calculate and display the expiration date on the receipt based on the following:

• Number of days valid – the expiration date is calculated based on the number of days or months the product can be used beginning with the sale date and the appropriate validity period for the specific pass. (i.e., Daily passes expire at sundown on the date sold; Weekly pass is valid for up to 7 days including the date of purchase; Annual passes expire at the end of the twelfth month of the month it was purchased).

ROMO

*Procurement Sensitive* Page 22 of 40

• Rate Multiplier: the expiration date is calculated based on the quantity days the visitor chooses to purchase (i.e., camping nights x number of days up to the maximum allowed).

• Set expiration date: the expiration date is calculated based on a pre-determined, specific date

• No expiration date: the product does not have expiration date (i.e., Interagency Senior and Access passports are valid for the owner’s lifetime).

The park staff, with the appropriate user rights, must be able to change the expiration date and time for each product.

Entry of Data based on Question Prompt

The AFM programming must allow the entry of alpha numeric data to a question prompt (i.e., number of people in the vehicle, the selected campsite number, Fee Notice Payment number, etc.)

Tender Processing

The contractor must program the AFM to accept the following tenders for payment:

6.1.7.1 Acceptance of Credit Card for Tender

The AFM programmed according to Sections 3.6 Managed Services (PCI), 4.0Credit Card Compliance, Processing, and Programming, and 4.0 Credit Card Compliance, Processing, and Programming.

Credit cards will be the only form of tender accepted.

Receipts configuration

AFMs must be programmed to not allow duplicate receipts to print unless configured to print two receipts (e.g. one for the visitor’s payment records and one for providing to the NPS in exchange for an Interagency Pass or posting at the specific campsite). See section 8.0 Products to Program for the specific receipt configuration per product.

AFM receipt printers must have the option to print or not print a receipt…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .