About this file
This document is a Statement of Work (SOW) for a federal contract opportunity to procure new Oracle Solaris servers and Network Attached Storage (NAS) controllers for the 10th Space Operations Squadron (10 SOPS).
The SOW details the minimum technical requirements for the Solaris servers and NAS controllers, including the specific hardware configurations, Information Assurance (IA) compliance, delivery timelines, and documentation requirements. The contract also requires the provider to have an office in the United States and comply with the Buy American Act. The federal contract opportunity is solicitation number FA255024Q0033, issued by the Department of the Air Force Space Command. The purpose is to replace the current Oracle servers and NAS that cannot support necessary IA upgrades for the Mobile User Objective System (MUOS) and associated ground systems operated by 10 SOPS. Only Oracle-branded products can meet the compatibility requirements. Offers will be evaluated on the technical capability to meet the specifications outlined in the SOW.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1 - 10 SOPS Oracle Server Hardware SOW 1 Rev2.pdf | ||
| 10 SOPS Oracle Hardware Solicitation amend 2.docx | DOCX document | |
| 10 SOPS Oracle Hardware Solicitation amend.docx | DOCX document | |
| 10 SOPS Oracle Hardware Solicitation 1.docx | DOCX document | |
| 10 SOPS Oracle Brand Name JA_r 1 (1).pdf | ||
| 10 SOPS Oracle Hardware Solicitation.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Specification Sheet Det D MUOS Server Mission Sustainment
1.0 Background
10 SOPS is responsible for the operations and maintenance of the Mobile User Objective System (MUOS) Military Satellite Communications (MILSATCOM) constellation and associated ground systems, including the Satellite Control Network (SCN), the Integrated Satellite Control System 3.1 (ISCS 3.1). Current Solaris servers and Network Attached Storage currently cannot support required Information Assurance upgrades. In order to maintain current operating levels and comply with Information Assurance polices, 10 SOPS has a requirement to procure new Solaris servers and Network Attached Storage able to support the Solaris 11.4 Operating System. The servers and Network Attached Storage will be located at 10 SOPS, Detachment Delta (DET D), Schriever SFB Colorado.
2.0 Requirements
Provide the items listed in sections 2.1 to 2.2 (these are the minimum requirements; provider must meet or exceed the minimum requirements). All items are required to be new. Refurbished and used equipment will not be accepted. Additionally, all offers’ shall have an office in the United States and comply with the Buy American Act per Far 25.1. Additionally all items must meet the Information Assurance specification required in 2.4.
2.1 Solaris Servers
Provider must meet or exceed this configuration. One (1) Solaris SPARC S7-1 server with the hardware configuration as detailed below (prebuilt):
| ITEM |
| PRODUCT |
| DESCRIPTION FOR ONE SPARC S7-1 |
| TOTAL QTY |
| 1 |
| Base Unit: |
| One (1) - SPARC S7-2 server: base with 2 SPARC S7 8-core 4.27 GHz processors, TAA compliant (for factory installation) |
| 1 |
| 2 |
| Memory: |
| Eight (8) - 32 GB DDR4-2400 DIMM (for factory installation) |
| 8 |
| 3 |
| Operating System: |
| One (1) - Oracle Solaris with fallback-boot image and Oracle VM Server |
for SPARC preinstall (for factory installation)
| 4 |
| PCIe filler panel: |
| Three (3) - PCIe filler panel (for factory installation) |
| 3 |
| 5 |
| Hard Drive: |
| Eight (8) - 1.2 TB 10000 rpm 2.5-inch SAS-3 HDD with marlin bracket (for factory installation) |
| 8 |
| 6 |
| Power cord: |
| Two (2) - Power cord: Sun Rack jumper, straight, 2 meters, C14 plug, C13 connector, 10A (for factory installation) |
| 2 |
| 7 |
| PCIe Host Bus Adapter: |
| One (1) - Oracle Storage 12 Gb SAS PCIe HBA, internal (for factory installation) |
| 1 |
| 8 |
| Cable management assembly: |
| One (1) - Cable management assembly (for factory installation) |
| 1 |
| 9 |
| Support for Systems: |
| One (1) - Year 1 Oracle Premier Support for Systems |
Period of performance start and end dates will be determined upon first point of delivery of product.
| 10 |
| Data and Device Retention: |
| One (1) - Year 1 Oracle Customer Data and Device Retention |
Period of performance start and end dates will be determined upon first point of delivery of product.
Provider must meet or exceed this configuration. Two (2) Solaris SPARC T8-1 servers with the hardware configuration as detailed below (prebuilt):
| ITEM |
| PRODUCT |
| DESCRIPTION FOR ONE SPARC T8-1 |
| TOTAL QTY |
| 1 |
| Base Unit: |
| One (1) - SPARC T8-1 server: base with 1 SPARC M8 32-core 5.0 GHz processors, TAA compliant (for factory installation) |
| 2 |
| 2 |
| Memory: |
| Sixteen (16) - 32 GB DDR4-2400 DIMM (for factory installation) |
| 32 |
| 3 |
| Operating System: |
| One (1) - Oracle Solaris with fallback-boot image and Oracle VM Server |
for SPARC preinstall (for factory installation)
| 4 |
| Hard Drive: |
| Eight (8) - 1.2 TB 10000 rpm 2.5-inch SAS-3 HDD with marlin bracket (for factory installation) |
| 16 |
| 5 |
| Power cord: |
| Two (2) - Power cord: Sun Rack jumper, straight, 2 meters, C14 plug, C13 connector, 10A (for factory installation) |
| 4 |
| 6 |
| Cable management assembly: |
| One (1) - Cable management assembly (for factory installation) |
| 2 |
| 7 |
| Support for Systems: |
| One (1) - Year 1 Oracle Premier Support for Systems |
Period of performance start and end dates will be determined upon first point of delivery of product.
| 8 |
| Data and Device Retention: |
| One (1) - Year 1 Oracle Customer Data and Device Retention |
Period of performance start and end dates will be determined upon first point of delivery of product.
2.2 Network Attached Storage Controller
Provider must meet or exceed this configuration. Six (6) identical Network Attached Storage Controllers. The hardware configuration must meet the minimum parameters as detailed below (prebuilt):
| ITEM |
| PRODUCT |
| DESCRIPTION FOR ONE CONTROLLER |
| TOTAL QTY |
| 1 |
| Base Unit: |
| One (1) - Oracle ZFS Storage ZS9-2: controller, mid-range, TAA compliant |
| 1 |
| 2 |
| Cable: |
| Two (2) - Cable: 3 meters, mini-SAS HD to mini-SAS HD, active optical (for factory installation) |
| 2 |
| 3 |
| Fibre Host Bus Adapter: |
| One (1) - Oracle Storage Dual Port 16 Gb or 32 Gb Fibre Channel PCIe HBA with 2 transceivers, Qlogic (for factory installation) |
| 1 |
| 4 |
| Power cord: |
| Two (2) - Power cord: Sun Rack jumper, straight, 2 meters, C14 plug, C13 connector, 10A (for factory installation) |
| 2 |
| 5 |
| Support for Systems: |
| One (1) - Year 1 Oracle Premier Support for Systems |
Period of performance start and end dates will be determined upon first point of delivery of product.
| 6 |
| Data and Device Retention: |
| One (1) - Year 1 Oracle Customer Data and Device Retention |
Period of performance start and end dates will be determined upon first point of delivery of product.
2.3 Drive Enclosure
Provider must meet or exceed this configuration. Six (6) identical Drive Enclosures, for connection to the Network Attached Storage Controllers, with the hardware configuration as detailed below:
| ITEM |
| PRODUCT |
| DESCRIPTION FOR ONE ENCLOSURE |
| QTY |
| 1 |
| Base Unit: |
| One (1) - Oracle Storage Drive Enclosure DE3-24P: base chassis (for factory installation) |
| 1 |
| 2 |
| Power cord : |
| Two (2) - Power cord: Sun Rack jumper, straight, 2 meters, C14 plug, C13 connector, 10A (for factory installation) |
| 2 |
| 3 |
| Hard Drive: |
| Twenty Four (24) - 1.2 TB 10000 rpm 2.5-inch SAS-3 HDD with marlin bracket (for factory installation) |
| 24 |
| 4 |
| Support for Systems: |
| One (1) - Year 1 Oracle Premier Support for Systems |
Period of performance start and end dates will be determined upon first point of delivery of product.
| 5 |
| Data and Device Retention: |
| One (1) - Year 1 Oracle Customer Data and Device Retention |
Period of performance start and end dates will be determined upon first point of delivery of product.
2.4 Information Assurance Requirements
All IA and IA-enabled COTS IT products implemented in the system have been evaluated or validated through one of the following sources: International Common Criteria (CC) for Information Security Technology Evaluation Mutual Recognition Arrangement, the National Information Assurance Partnership (NIAP) Evaluation and Validation Program, or the Federal Information Processing Standard FIPS validation program.
Web sites:
https://aplits.disa.mil/processAPList.action https://www.commoncriteriaportal.org/
3.0 Delivery
Delivery required 30 days ARO. Actual delivery date must be coordinated with 10 SOPS Michael Richards (805) 989-4335.
All items will be shipped to:
10th Space Operations Squadron 661 13th Street, Building 375 Point Mugu, CA 93042-5003
4.0 Technical Capability
Technical capability of proposed items to meet the requirement will be assessed by evaluating either commercial product brochures, drawings or technical information submitted in response to FAR Clause 52.212-1, INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS, Subparagraph (b)(4). At a minimum the offeror must provide a technical description of the items being offered in sufficient detail to evaluate compliance with the requirements. Offerors technical information will be used to determine whether the items proposed meet the specifications required. Technical information will be evaluated as technically acceptable or technically unacceptable. Offers which are determined to be technically unacceptable may not be considered further for award.
5.0 Documentation
Delivery shall include any drawings, technical documentation, manuals and software that are standard from the manufacturer for the items purchased at no additional charge.