This document contains a solicitation for a federal contract opportunity and related pricing worksheet. The solicitation is to modernize the elevator in building 1990 at Shaw Air Force Base in South Carolina. Work will include replacing the existing control system and installing a new overspeed governor, governor rope, and car and counterweight roller guides in accordance with the statement of work. The award will be evaluated using lowest price technically acceptable procedures, considering experience within the last three years with open-access elevators of five or more stops. A site visit is scheduled for March 7, 2024 and questions are due by March 12, 2024. The pricing worksheet provides unit pricing and labor estimates for various materials and tasks associated with the modernization work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

`FOR OFFICE USE ONLY
Project:B1990 Modernize ElevatorVLSB 24-0013Project Engineer:Christopher Smith
Location:B1990Department:20 CES
Contractor:
Address:
PR No.:
For Official Use Only
ReferenceLine No.ItemUnit of MeasureQuantityMaterial CostsLabor CostsDirect CostLine Total
Unit CostTotalLabor Hours per Unit (Means)Labor Cost per Unit (Means)Total Labor-HoursAvg. Rate ($/hr)Total
Machine Room
1New AC Motor & Adapterea0.0
2Rope gripperea0.0
3Machine support beams and bedplateea0.0
4Hardwareea0.0
5Elevator hoist ropes,shackles and springsea0.0
6Elevator Controller VVVF/ACea0.0
7Selector/ Levellingea0.0
8Governor mounting plateea0.0
Electrtical
9Conduit / Racewayea0.0
10Wiringea0.0
11Hardwareea0.0
12Elecrical Connectors / sundriesea0.0
Hoistway
13Limit Switches top/bottomea0.0
14Stop Switchers top / bottomea0.0
15Governor/Governor Guardea0.0
16Governor Tenision wgtea0.0
17Governor Rope/hitch shackleea0.0
18Traveling Cable #1ea0.0
19Traveling Cable #2ea0.0
20Kellems gripsea0.0
21Hostway riser and conduitea0.0
22Hoistway wiringea0.0
23Door Lock wiringea0.0
24Car guidesea0.0
25CWT guidesea0.0
26Adapter platesea0.0
27Guide cover plantesea0.0
28Hardwareea0.0
29Sundries - hoisting equipment/chain falls/scaffoldingea0.0
Hoistway Door
30Hoistway door headersea0.0
31Hoistway door panelsea0.0
32Hoistway door tracks, hangers, locks and closersea0.0
33Hardwareea0.0
34Sundries - specialize equipment, tools, materials, riggingea0.0
Fixtures
35Hall stationsea0.0
36Hall laternsea0.0
37Access stationsea0.0
38Jamb braileea0.0
39Hall station wiringea0.0
40Car operating panelea0.0
41Sundries - wire labels/terminal blocks/junction stationsea0.0
Elevator Car Door
42Elevator Car Doorea0.0
43Car Door trackea0.0
44Car Door headerea0.0
45Door reversal edgeea0.0
46Elevator door operatorea0.0
47Car wiringea0.0
48car conduit/flex and connectorsea0.0
49Cartop Inspection Stationea0.0
50Mobilization
51Perdiem - 2 personnel / 15 daysdays0.0
52Frieghtea0.0
Totals:$0.00$0.00$0.00$0.00
Total Material Cost:$0.00
Total Labor Cost:$0.00
Direct Cost:$0.00
Total Line Item Cost:$0.00
Overhead:0%$0.00
Subtotal:$0.00
Profit:0%$0.00
Subtotal:
Bond:0.0%
Total Contract Price: