Program Guide, PG-18-15, Volume C May 2006
Department of Veterans Affairs
VA Medical Center Projects
A/E Submission Instructions for Minor and NRM Construction Program:
• Schematics
• Design Development
• Construction Documents
Program Guide, PG-18-15, Volume C Page i
Department of Veterans Affairs Washington, DC 20420
FOREWORD
This document states the minimum requirements for each submission in the production of VA Schematics, Design Development, and Construction Documents for Minor and NRM Construction Program for Medical Center Projects. It will give VA reviewers and the A/E a clear understanding of what is required of the A/E at each stage of design.
This document does not relieve the A/E firms of their professional responsibility to produce a correct, complete, and fully coordinated set of construction documents.
Lloyd H. Siegel William W. Graham Director, Facilities Quality Office (Acting) Director, Engineering Management and Field Support Office
Program Guide, PG-18-15, Volume C Page ii
Table of Contents
I. GENERAL 1
A. INTRODUCTION 1
B. A/E RESPONSIBILITIES 3
C. SUBMISSION POLICY 4
D. QUALITY ASSURANCE/QUALITY CONTROL (QA/QC) 4
E. ADDITIONAL SERVICES 5
F. CRITICAL PATH METHOD PHASING MEETINGS 5
II. SUBMISSIONS 6
A. SITE DEVELOPMENT 6
B. ARCHITECTURAL 8
C. FIRE PROTECTION 11
D. INTERIOR DESIGN 14
E. STRUCTURAL 16
F. PLUMBING 18
G. SANITARY 19
H. HVAC 20
I. ELECTRICAL 24
J. EQUIPMENT 26
K. STEAM GENERATION 27
L. STEAM DISTRIBUTION (OUTSIDE) 29
M. SOLID WASTE DISPOSAL SYSTEM INCLUDING INCINERATION 30
N. AUTOMATIC TRANSPORT 32
O. ASBESTOS ABATEMENT 34
P. SPACE PLANNING 36
Q. CRITICAL PATH METHOD (CPM) 37
R. ESTIMATING 38
S. SPECIFICATIONS 39
T. FINAL BID DOCUMENTS 40
III. DISTRIBUTION OF A/E MATERIAL 41
A. SYMBOL IDENTIFICATION OF CONTRACT DRAWINGS 41
B. GENERAL NOTES 41
Program Guide, PG-18-15, Volume C 1 November 2008
A/E SUBMISSION INSTRUCTIONS FOR
MINOR AND NRM CONSTRUCTION PROGRAM
MEDICAL CENTER PROJECTS
I. GENERAL
A. INTRODUCTION
1. This document contains information and minimal submission requirements for contract documents specified in the A/E contract.
2. The Department of Veterans Affairs (VA) may contract with an Architect/Engineer (A/E) for any portion of a design: Schematics, Design Development, Construction Documents, or a combination of these.
a. For projects where the VA is contracting for Schematics Documents only, Schematics and Design Development Documents only, or Schematics, Design Development, and Construction Documents, the VA will provide the Design Program (if available), Facility Development Plans (if available), and VA design standards to accompany the Scope of Work for the project.
b. For projects where the VA is contracting for Design Development and Construction Documents only, the VA will provide the Schematics Plans and VA design standards to accompany the Scope of Work for the project.
c. For projects where the VA is contracting for Construction Documents only, the VA will provide the Design Development Plans and VA design standards to accompany the Scope of Work for the project.
3. Coordinate all activities with the VA Medical Center (VAMC). Hold informal meetings (upon mutual consent of the VA and the A/E) at the VAMC to discuss the design and related issues. Continue to expand contacts by telephone, rough sketch studies and other means of communication with the purpose of finalizing a general design approach to be followed.
4. Final approved Schematic documents shall be the basis for the development of the Design Development phase. Likewise, final approved Design Development documents shall be the basis for the development of the Construction Documents phase. The VAMC must approve any changes from each set of documents before the A/E proceeds to the next phase.
5. VA will review all submittals for functional and aesthetic relationships. However, no further functional decisions are anticipated after the Design Development phase.
6. Provide a design narrative/analysis for each technical discipline (e.g., architectural, mechanical, fire protection, etc.) which describes the intent of each discipline with schematic and/or design development submission.
7. Provide computations and sizing calculations for electrical, mechanical (HVAC, plumbing, and steam), sanitary, structural and fire protection designs. For computerized calculations, submit complete and clear documentation of computer programs, interpretation of input/output, and description of program procedures.
8. Provide individually packaged drawings for each submission to each unit specified in the "Distribution of A/E Materials" section.
Program Guide, PG-18-15, Volume C 2
9. Submit a complete set of final approved drawings incorporating all revisions, within 30 days after completion of the Schematics and Design Development stages.
10. At each review stage, the VA’s technical reviewer, a value-engineering consultant, or a construction manager will perform a value engineering review. The A/E shall complete their own value-engineering review at each design stage.
11. Submit final drawings (Bid Documents) CD to be used with the Revit and AutoCAD versions at the VAMC. Submit instructions on the use of the disks along with a complete listing of all layers that are used.
12. At 50% & 95% submissions, the A/E shall complete the attached Fire Protection Outline (some parts of this outline might not be applicable: wherever this is the case, the A/E shall so indicate for each line item) as referenced on the VA’s Technical Information Library.
Furthermore, at 50% and 95% submissions, the A/E is required to perform third-party fire/life-safety reviews. The A/E shall also be required to report the amount of time necessary to complete the outline and any questions or problems the A/E incurs as a result of completing the outline each time the outline is completed. The A/E will also be required to complete the Resolution portion of the Fire and Safety Project Review Report (sample attached) after each submission review. This is to be submitted after each subsequent submission. Directions for completing the outline are attached as a sample letter. These directions are to be followed by the A/E with the exception that the first point of contact shall be the COR. Everything mentioned herein shall be both in hard copy and on CD.
13. The A/E will be required to coordinate the design with VA staff that would be involved with construction (i.e. doctors, managers, and other staff responsible for any work area to be involved in construction [i.e. normal work flow disrupted]) such that there would be least disruption of normal work flow.
14. In each submission, the A/E shall resubmit the material specified in the prior submission, revised according to the comments made by the VA at the prior review. “The A/E shall return all original VA mark-ups of each submission at the next submission, showing that all comments have been addressed (a short response by an appropriate A/E representative shall be indicated next to each VA comment [i.e. see detail 1]).”
15. To the extent applicable, all electronic drawings are to be in 3D and all hard copies are to be in 2D. All relative existing work shall be shown as field verified by the A/E. The intent here is to show how equipment will fit and to show entire runs of duct and pipe (i.e.
from where new conduit meets existing to the termination point in the wall at the outlet). All desks, equipment, and P.C.’s planned to be put in the new and renovated space (relocated and/or planned) shall also be shown to see the relation of outlets to such.
16. The A/E will be required to make formal presentations for each design review in person. The A/E will take written minutes of all design reviews and provide the Contracting Officer and the COR with the original (hard copy and cd) and a copy, respectively, within seven calendar days.
The A/E will also make a written inspection report (hard copy and cd) within seven calendar days after each site inspection during construction.
17. The A/E will be required to indicate in the contract specifications that the contractor shall hold weekly meetings with VA staff and take minutes of each meeting (hard copy and cd) which are to be distributed within two work days of each meeting to each meeting attendee.
Program Guide, PG-18-15, Volume C 3
18. The A/E’s cost estimate should never exceed the authorized funding, but if it does at any point, the A/E shall immediately inform the Contracting Officer and the COR in writing with the cost and justification by the A/E. Cost will be reviewed first at each submission and if the A/E does not present a plan within budget, the review of the submission will immediately cease and the A/E will be required to provide a new submission within budget within 24 hours.
19. “Each” drawing using symbols and/or abbreviations of any kind shall have a legend unique to that drawing defining such. This is to avoid having to flip through drawings looking for definitions and the uniqueness will avoid having to hunt through long legends. “Each” plan drawing shall have true north and building north shown.
20. All estimates shall be based on the most up-to-date working drawing available and shall be current as of the date of submission. Cost will include labor burden, sales tax, and applicable tiered sub-contractor’s fees as mentioned in the master specifications. Escalation as of time of award shall be shown as a separate line item.
21. The A/E shall subcontract a Fire & Safety P.E. (Professional Engineer) to review 50% and 95% submission in total (drawings, specs, estimate, fire protection outline, etc.) and provide review comments to the VA and A/E electronically. The A/E will provide responses to the review comments by the Fire & Safety P.E. to the Fire & Safety P.E. and COR electronically. The A/E will provide one full copy of each review submission to the Fire & Safety P.E.. The cost for this shall be added as a Part IV on the A/E fee proposal and not included in Parts I(a), I,II, or III.
B. A/E RESPONSIBILITIES
1. Contract documents shall meet or exceed the requirements of this document.
2. The A/E is responsible for producing a complete set of drawings, design narrative/analysis, calculations, sample boards, and specifications in accordance with professional standard practices and VA criteria. Each A/E discipline shall receive a copy of their respective VA design manuals, standard details, construction standards, and VA National CAD Standard Application Guide. The AE is responsible for obtaining the NCS.
3. A/E shall conduct coordination meetings between A/E technical disciplines before submitting material for each VA review and provide minutes of the meetings to VAMC.
4. A/E shall adhere to the approved Memorandum of Agreement (MOA).
5. A/E shall provide a checklist of all submittals, certifications, tests, and inspections required per drawing and specification section. The A/E shall also provide a list of all sole source and brand name or equal items, along with drawing and specification references.
6. In addition, the A/E shall conduct interim fire protection installation inspections and witness final fire protection equipment testing.
Program Guide, PG-18-15, Volume C 4
7. During the 50% submission design review, the A/E shall present on project phasing and shall be fully developed at the 95% design review.
8. The Government must retain rights to all associated software and have full access to all elements of the System. At no point can the Government be locked out of the System.
9. During Pre-Final Inspection, the A/E shall inspect all work shown on the contract documents to ensure all work is complete and installed as designed.
10. The A/E is to edit the most recent VA master specification sections that should be available on the TIL. Specification recycled from another project will not be accepted. The A/E will be required to provide a list of salient characteristics in the specifications for each brand name or equal item approved. The new space shall have complete energy management functionality that communicates with this facility’s existing energy management system.
11. Perform a complete site survey to evaluate existing conditions and space available for new construction and renovations. Survey the existing system to determine the reliability, and compliance with present day codes and standards.
C. SUBMISSION POLICY
1. There is a Schematic* submission, a Design Development (DD**) submission, and a
Construction Document (CD***) submission indicated in this guide. The VAMC may alter the submission requirements depending upon the complexity of the project by adding or deleting certain reviews. Where additional reviews might be required, the VAMC will issue, at their discretion, a detailed “Statement of Task” or supplemental instructions to the A/E, which would be provided at the time of solicitation for a fee proposal.
2. At each submission, the A/E shall date all material and present the designs on VA standard size drawings that are appropriately labeled, "SCHEMATIC SUBMISSION", “DESIGN DEVELOPMENT SUBMISSION”, OR “CONSTRUCTION DOCUMENT SUBMISSION”, in large block letters above or beside the VA standard drawing title block. In each submission, the A/E shall incorporate the corrections, adjustments, and changes made by VA at the previous review.
3. The 95% submission is the “completed design” from the A/E prior to review by the VA.
Anything less will not be accepted as the 95% submission. “The 95% submission is not 95% of the design.” This allows final review comments of the A/E’s completed design to be included in the 100% submission so that the 100% submission is a true 100% submission and such that no more changes are necessary.
4. 100% Bid Documents shall be stamped and sealed by licensed architects and engineers registered in the state of Pennsylvania.
D. QUALITY ASSURANCE/QUALITY CONTROL (QA/QC)
In an effort to reduce construction change orders due to design errors and omissions, the Office of Facilities Management has initiated a Quality Assurance/Quality Control program.
Program Guide, PG-18-15, Volume C 5
The A/E shall develop, execute, and demonstrate that the project plans and specifications have gone through a rigorous review and coordination effort. The requirements are as follows:
1. Fee Proposal: Provide an outline of the actions that your firm will take during the design process along with an associated fee.
2. Two Weeks after Receipt of the Notice of Award: Submit a detailed QA/QC Plan describing each step that will be taken during the development of the various phases of design. Each step should have an appropriate space where a senior member of the firm can initial and date when the action has been completed.
3. 100% Submittal: Submit the completed QA/QC Plan along with the latest marked-up documents (plans, specifications, etc.) necessary to ensure that a thorough review and coordination have been completed.
E. ADDITIONAL SERVICES
If additional services (i.e. surveys, soil borings, asbestos surveys, water flow testing, or lead surveys), are necessary to be performed by consultants, submit criteria for the work to be performed to the VAMC Contracting Officer as soon as possible. Upon approval of the criteria, submit proposals and qualifications of at least three firms being considered for the work in accordance with the contract procedures (CP1) of the contract, together with a proposal from the recommended firm and a brief justification for its selection, for VA approval. A/E should submit survey information for the Schematic Review.
F. CRITICAL PATH METHOD PHASING MEETINGS
A. If required and prior to submission of Schematic material, the A/E shall meet with the
VAMC’s Project Manager to discuss and outline phasing requirements for the project.
These phasing requirements shall describe the general sequence of the project work, estimated project duration, and what Government constraints will exist that will influence the Contractor's approach to the construction project. The A/E shall be responsible for recording the phasing requirements.
B. Submit a phasing narrative and phasing plans (on reduced size plans) within two weeks after each phasing meeting to the VAMC Project Manager. VA will review these submission(s) and return comments to the A/E within two weeks of receipt. The A/E will then use this information in preparing their schematic, design development, and construction document submissions.
Program Guide, PG-18-15, Volume C 6
II. SUBMISSIONS
A. SITE DEVELOPMENT
Submit the following:
Site Development: Schematics* DD** CD***
Narrative Analysis of site Circulation study Phasing analysis Parking analysis Development concept showing proposed buildings and structures
Landscape drawings with plant groupings Topographic, utility, and landscape survey Demolition plan Layout plan showing location of:
• Building and structures
• Roads
• Fire Access
• Parking
• Accessible spaces
• Van spaces
• Mechanical and electrical equipment on grade
• Future expansion
• Off-site roads
• Off-site utilities
• Service area(s)
• Entrances and exits
• Walks
• Inlets
• Contractor's staging area
• Vertical and horizontal road alignment
• Paving joint patterns Grading plan showing:
• Existing contours
• Proposed contours
• Spot elevations at structure corners, entrances, equipment pads, etc.
• First floor elevations
Program Guide, PG-18-15, Volume C 7
Site Development: Schematics* DD** CD***
• Rim and invert elevations on storm drainage fixtures
• Erosion and sediment control Rock excavation (quantity) Planting plan showing:
• List of plant material
• Limits of irrigation Site details Landscape details Signage plan and schedule Specifications
* Submit site and landscape plans at an appropriate scale to show all work involved.
** Submit site and landscape plans at same scale as topographic/utility survey incorporating all revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated site and landscape plans incorporating all revisions required by comments from the design development phase.
Program Guide, PG-18-15, Volume C 8
B. ARCHITECTURAL
Submit or show the following:
Architectural: Schematics* DD** CD***
Location of:
• Rooms1
• Doors2
• Corridor(s)3
• Basic column grid/sizes
• Expansion and seismic joints
• Electrical closets
• Equipment rooms
• Signal and telephone closets
• Mechanical shafts and space
• Stair(s)
• Ramp(s)
• Elevator(s)
• Automatic Conveyances Floor Plans/Drawings:
• All floors (new and renovated)
• Penthouse
• Roof plan
• Pipe basement
• Pipe tunnel
• Reflected ceiling4
• Equipment floor plans 1:50 (1/4 inch) scale5
• Demolition plans6 Room names and numbers7 Program net/designed net Exterior dimensions/total building gross area Size and shape of all departmental functions and services9
Exterior building elevations10 Finish floor elevations11 Door locations, sizes, and swings Wall thickness and chase walls Handrail location/dimensions Fixed equipment Equipment elevations and details Plumbing fixtures Wheelchair accessible facilities Wall sections12
Program Guide, PG-18-15, Volume C 9
Architectural: Schematics* DD** CD***
Building sections13 Finish grades at corners, entrances, exits, platforms, and ramps
Fire and smoke rated partitions14 Lead-lined and radiofrequency shielded partitions14
Fire extinguisher cabinets14 Spray-on fire proofing (see fire protection) Construction details15 Drafting symbols, abbreviations, and general notes
Door, window, and louver schedules Interior details, elevations, sections Finish schedule16 Graphics and signage17 Color rendering Specifications Lead abatement18 Lead abatement specification19
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch). A scale of 1:200 (1/16 inch) is acceptable for architectural floor layout if an entire floor cannot be shown on one sheet. Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
B. NOTES:
1. Use lines between spaces to indicate the centerline of the partition (for schematics only).
2. Indicate doors with a slash mark.
3. Along the corridor, the line shall represent the corridor side of the partition.
4. Indicate ceiling mounted equipment, lighting fixtures, air diffusers, registers, tracks, and other significant elements.
5. Identify all equipment for each room. Indicate and coordinate all equipment with the
Equipment Guide List (Program Guide 7610) and Activated Equipment List. Use VA standard symbols and notation to distinguish between contractor-furnished and installed (CC), VA-furnished contractor-installed (VC), VA-furnished and installed (VV), VA-furnished with construction funds [VC(CF) and VV(CF)], and relocated (R) equipment. Equipment floor plans are not required for the offices, consultation rooms, classrooms, conference
Program Guide, PG-18-15, Volume C 10 rooms, and waiting rooms within the above departments. Draw equipment details which are necessary for major decisions, though complete detailing is not required for this submittal.
6. Indicate existing finish schedule and notes on plan.
7. Label as required for schematic drawings. Coordinate new room numbering with medical center.
8. Use the same names on drawings as those used in the space program. Provide area figures in fractional form, e.g., 400/390. Indicate space provided, but not called for in the space program, as: -/390.
9. Label each service or activity listed in the Project Scope Data of the Design Program and indicate boundaries with a distinctive line. Include the activity code number (see Handbook 7610).
10. If the project requires exterior work, show all facades indicating massing, proposed fenestration and the building relationship to adjacent structures and the finish grade. Show all significant building materials, including their colors, any proposed roof top mechanical equipment, architectural screens, skylights, and stacks on the elevation drawings. If building is designed for future expansion (vertical and/or horizontal), delineate elevations with and without the future expansion. If project is an addition, show elevations of the existing building in sufficient detail to illustrate the relationship between the new and existing in terms of scale, material, and detail.
11. Define the relationship of the finish ground floor to finish grade at major entrances and docks.
12. Indicate construction including fire resistance rating, building materials and systems, and proposed sill and head heights of openings. Indicate both new and renovated areas on form provided by VA.
13. Define building configuration. Draw sections at the same scale as floor plans, normally 1:100 (1/8 inch). If the building abuts an existing structure, indicate in the section how the new floor elevations align with existing.
14. Identify psychiatric areas where special considerations are required to ensure the safety of patients (e.g. hard ceilings, safety glazing, etc.).
15. Indicate new building components and systems, such as window design, roofing system, special entryways, building "skin", and any special architectural elements for the project.
Complete detailing of miscellaneous items is not required for this submission.
16. Indicate all building systems, materials, and future expansion, if applicable.
17. Submit a drawing for all which is part of the construction contract.
18. Provide square meters (feet) of lead paint and x-ray shielding to be removed.
19. Format provided in SPECIFICATIONS. If there is no VA master specification, develop contract specification that is in compliance with regulations of the Environmental Protection Agency.
Program Guide, PG-18-15, Volume C 11
C. FIRE PROTECTION
Fire Protection: Schematics* DD** CD***
Fire protection narrative:1
• Fire and smoke separation
• Fire sprinkler/standpipe system
• Size of fire pumps
• Water supply available/max. demand
• Water flow testing results
• Fire alarm systems2
Existing to be modernized Base loop system for interface of new construction
• Kitchen extinguishing systems
• Size of air handling unit
• Exit paths from each zone
• Distances to stairs
• Occupancy of each area
• Exit calculations for each floor
• Smoke control features Floor Plans/Drawings:3 & 4
• Sprinkler zones
• Fire alarm zones
• Smoke zones
• Building water supply
• Interior sprinkler supply lines
• Standpipes
• Fire extinguisher cabinets
• Fireproofing of structural members
• Sprinkler/standpipe riser supply piping
• Termination of sprinkler main and inspector test drains
• Sprinkler alarm valves
• Waterflow and tamper switches
• Sprinkler system fire department connections
• Sprinkler design hazards per NFPA 13
• Exit signs and emergency lighting
• Occupied areas not protected by automatic sprinklers
Calculations
Program Guide, PG-18-15, Volume C 12
Estimated capacities for proposed air handling units in cubic meters (cubic feet) per minute
Location of:
• Fire alarm system
• Annunciator panels
• Pull stations
• Flow switches
• Audio-visual devices
• Smoke detectors
• Duct smoke detectors
• Smoke dampers
• Fire dampers
• Fire alarm risers5
• Exit signs
• Emergency lighting
• Fire sprinklers
• Standpipes
• Fire hydrants
• Fire pumps
• Post indicator valves
• Sectional valves
• Fire extinguisher cabinets
• Electromagnetic door hold open devices Wall sections indicating fire resistive ratings Staff sleeping rooms Excavation plan signage Door and window schedule with fire rating or fire rated glazing
Zoning of each fire alarm initiating device Details:
• Fire pump system (capacity and pressure)
• Elevation and isometric view of fire pump
• Stairwell sign
• Annunciator panel Interconnection of fire alarm system with:
• Smoke dampers
• Air handlers
• Elevator controls
• Kitchen fire extinguishing and fire pump system
• HVAC system with smoke duct detectors Single line riser diagram for fire alarm system
Program Guide, PG-18-15, Volume C 13
Height/configuration of storage racks and shelving
Specifications
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch).
Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
C. NOTES:
1. Indicate NFPA 220 and UBC fire resistive rating of the building, NFPA 101 occupancy type, and fire protection code analysis to access compliance with NFPA 101.
2. Determine type, features, age, reliability, compliance with present day codes, capacity, zoning, supervision, control panel and power supplies, initiating devices and circuits, and auxiliary functions for existing fire alarm system. Indicate manufacturer, model number, voltage, and wiring style of existing alarm systems and devices. Provide recommendations for the proposed fire alarm work.
3. Provide information to meet JCAHO requirements, e.g. location of all fire rated barriers, smoke barriers, exit signs, fire extinguishers, manual pull stations, smoke detectors, and sprinkler flow switches. Show all interim life safety measures such as temporary systems Fire Alarm, Sprinkler, and Smoke.
4. At DD Submission, add room names, room numbers, door locations and swings, smoke and fire rated partitions, sprinkler/standpipe risers to floor plans. Identify psychiatric areas on drawings so areas for institutional type heads are identified. Add location of all valves (post indicator, sectional) and backflow preventer if provided.
5. Show new equipment and/or the necessary changes involved if modification to the existing system is required. Include any recommendations where certain requirements of VA criteria might be waived, in order to allow the existing equipment to be reused.
Program Guide, PG-18-15, Volume C 14
D. INTERIOR DESIGN
Submit the following:
Interior Design: Schematics* DD** CD***
Written interior design concept1 Illustrate overall design solution2 Material and finish samples Sketches Design solution for interior spaces:
• Perspectives
• Plans
• Details
• Elevations
• Sections
• Wayfinding
• Floor patterns
• Wall patterns
• Lighting
• Signage
• Handrails
• Bumper guards Specification section 09050 Finish schedule Exterior colors and materials Sample boards for interior and exterior materials, products, and finishes
Edited carpet and wallcovering specifications Specifications Keyed Finish plans Interior design details, elevations, and sections
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch).
Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
D. NOTES:
1. Provide a document of data collected in interior design programming. Include collection and analysis of data from the VAMC project coordinator and interior designer. Data includes, but is not limited to the following: existing interior and exterior design and materials, light, Program Guide, PG-18-15, Volume C 15 safety, patient profile, customer’s “vision” or desired image, public vs. private spaces, complete signage package, goals of customer, relationship to existing facilities, future expansion/renovation plans, regional influences, etc.
2. Discuss and illustrate the overall design solution for the primary areas of the project using marked-up floor plans, loose sketches, and material and finish samples. Use broad categories of materials, finishes, color palettes, patterns, textures, and scales. Separately group all major neutral background materials and finishes that will be used and discuss how they will be integrated with all other materials and finishes on the project. Include all primary and secondary corridors, typical patient and toilet rooms, lobbies, atriums, eating spaces, chapels, waiting rooms, and exam rooms. Show the relationship among departments and functions, and between public and private spaces.
Program Guide, PG-18-15, Volume C 16
E. STRUCTURAL
Structural: Schematics* DD** CD***
Three alternative structural systems for typical bays1
Supporting calculations2 Cost estimates for each system3 Recommend preferred system Column locations Shear load resisting elements4 Boring location plan5 Structural plans6 Sections Details Size/location of:
• Columns
• Beams Lateral load resisting elements Load bearing walls Slabs Foundations Elevations Schedules General notes Boring logs Subsurface investigation report Estimated quantity of rock
(1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
E. NOTES:
1. When only one structural system is possible due to other project requirements, include an explanatory statement and submit only that structural system.
2. Include vertical and lateral load design for CD submission.
3. Include foundation and fireproofing.
Program Guide, PG-18-15, Volume C 17
4. Indicate existing utilities and structures within, adjacent, or contiguous to the new construction.
5. Upon approval of the subsurface investigation criteria, submit qualifications of at least three consultants being considered for the work together with the proposal of the consultant recommended as most qualified.
6. If there is only a CD submission, provide a Structural Engineering Analysis Submission within six weeks from the notice of award including sketches, calculations, and cost estimates of three alternative structural systems for typical bays, boring location plan for subsurface investigation, and consultant qualifications. For vertical expansion projects, analyze existing structure for structural feasibility.
Program Guide, PG-18-15, Volume C 18
F. PLUMBING
Plumbing: Schematics* DD** CD***
Narrative:
• Existing plumbing systems to be used and necessary modifications
• New plumbing systems
• New or modified water treatment Floor Plans/Drawings:
• Room names
• Identify
Existing plumbing fixtures w/ VA numbering system
New plumbing fixtures w/ VA numbering system
Existing equipment New equipment New medical gas outlets New laboratory gas outlets Plumbing piping
• Size of pipe
• Equipment schedule
• Fire & smoke partitions
• Demolition plans
• Riser diagrams
• Legend, notes, and details Location and size of sprinkler riser, standpipes, and fire pumps (see fire protection)
Location of emergency eyewash and shower equipment
Calculations (equipment & piping) List of Required Contract Specifications Contract Specifications
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all revisions required by comments from schematics phase.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
(1/4 inch).
Program Guide, PG-18-15, Volume C 19
G. SANITARY
Sanitary: Schematics* DD** CD***
Narrative:
• Existing sanitary systems:
underground water, sanitary sewers, storm sewers, & fuel gas with sources, disposal methods, storage pressures, condition, etc.
• New sanitary systems
• Provide water analysis & expected yield if well required
• Circulation study to assess emergency vehicle access
Install test well, if well is required.
Utility Plans/Drawings showing existing and new sanitary systems:
• Size of pipes
• Invert elevations of sewers
• Locate/size
Pumps Storage facilities Treatment equipment Fire hydrants Sectional and post indicator valves Backflow preventer
• Areas of new irrigation system
• New irrigation system
• Profiles of sanitary & storm sewers
• Demolition Plans
• Legend, notes, and details Point of connection to sprinkler system Calculations List of specifications Contract Specifications
* Submit utility drawings at same scale as provided for Site Development drawings.
** Submit utility drawings at same scale as provided for Site Development drawings, incorporating all revisions required by comments from the schematics phase.
*** Submit utility drawings at same scale as provided for Site Development drawings, Submit legend, notes, and details at a scale not less than 1:100 (1/8 inch).
Program Guide, PG-18-15, Volume C 20
H. HVAC
HVAC: Schematics* DD** CD***
Description of HVAC systems Equipment for each functional space Life cycle cost analysis1 Tentative location/sizes:
• Mechanical equipment room
• Principal vertical shafts Block layout of equipment Louvers:2
• Outside air
• Exhaust air
• Relief air Engineering calculations3 Selection of HVAC equipment Catalog cuts of equipment Room by room heating and cooling loads Zone by zone heating & cooling loads Building block heating & cooling loads Tabulation of steam consumption Psychometric chart for air handling unit Coil entering and leaving conditions Fan motor heat gains Consumption of humidification loads Sound/acoustic analysis Room-by-room air balance charts4 Chilled water plant:5
• Quantity and type of chillers
• Capacity in tons of refrigeration
• Electrical equipment Heating system:
• Total heating load
• Domestic hot water load
• Humidification load
• Equipment steam demand
• Zoning of heating system
HVAC floor plan:6
• Main supply, return and exhaust ductwork
• Volume dampers
Program Guide, PG-18-15, Volume C 21
HVAC: Schematics* DD** CD***
• Fire and smoke partitions
• Fire and smoke dampers
• Smoke detectors
• Automatic control dampers
• Air quantities for each room
• Air inlets/outlets
• Rises and drops in ductwork
• Expansion loops
• Anchors
• Vales
• Drip assemblies
• Balancing fittings Interconnection of HVAC equipment with fire protection equipment (see fire protection)
Plan/section of mechanical equipment rooms Schematic flow and riser diagrams7 Schematic control diagrams8 HVAC demolition drawings Phasing plan Equipment schedule Seismic bracing VA symbols and abbreviation Selection of
• Pumps
• Fans Sizing and selection of
• Expansion tanks
• Steam to hot water convertor
• Heat exchangers Sound analysis Complete selection data Outside chilled water and condenser water distribution9
Standard detail drawings Automatic temperature control drawings10 HVAC specifications
(1/4 inch) including equipment.
revisions required by comments from schematics.
Program Guide, PG-18-15, Volume C 22
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
H. NOTES:
1. Provide specific design recommendations and full back-up data. Include the heating and cooling capacities of each functional area and the block cooling and heating loads for each new and/or existing building.
2. The locations of these louvers must not allow short circuiting of air from emergency generator exhaust or truck waiting and loading dock areas into air intake etc. Consider factors affecting louver location such as visibility, historical considerations, wind direction, and nuisance and health hazard odors (from emergency generator or truck exhausts).
3. Include room-by-room, peak zone-by-zone, and building block heating and cooling loads.
Provide a tabulation of steam consumption based on data from all sources. Show correlation between each HVAC zone boundary and architectural floor area correlation between the architectural room numbers and abbreviated/coded room numbers used with computer input data sheets.
4. Show supply, return, exhaust, make-up, and transfer quantities with intended pressure relationships, i.e. positive, negative, or zero with respect to adjoining spaces.
5. Provide pertinent data on accessories such as pumps and cooling tower etc. Show the extent of the outside chilled water and condenser water piping. Clearly show how the piping will be laid in tunnels, trenches, or by direct burial.
6. Show ceiling clearances, at locations where ducts cross each other, by providing 1:50 (1/4 inch) scale local sections. Show all ductwork and piping 150 mm (6 inch) and larger in double line. Show separate floor plans for air distribution and piping unless waived by VA.
Show clearances required for access and maintenance with coil and tube pull.
7. Show typical air handling systems and all hydronic systems with existing capacities and new estimated loads. Verify actual operating conditions and capacities of HVAC systems prior to design.
8. Show control devices, such as, thermostats, humidistats, flow control valves, dampers, freezestats, operating and high limit sensors for all air systems and fluids, smoke dampers, duct detectors etc. Provide a written description of the sequence of operation on the floor plans. Detail the scope of work involved with the Central Engineering Center (ECC) and address if enough spare capacity is available or a new ECC is required. Show a point schedule for analog/digital input/output to be included in ECC.
9. Show pipe sizes and insulation with plans, profile, sections, details, and all accessories, such as, anchors, expansion loops/joints, valves, manholes, capped and flanged connections, interface between the new and existing work (if any). Clearly indicate interferences (if any) with the existing utilities and/or landscape elements on outside piping layout drawings. Show rerouting any utilities, cuttings of roads, pavements, trees, etc., and the extent of new and demolition work. Outside utility drawings shall be based on the study of the latest site drawings, discussions with engineering personnel, and actual site inspection of the existing utility.
Program Guide, PG-18-15, Volume C 23
10. Show all duct detectors, control valves/dampers static pressure sensors, differential pressure control assemblies, etc., whose actual physical location is critical for the intended sequence of operation on floor plans.
Program Guide, PG-18-15, Volume C 24
I. ELECTRICAL
Electrical: Schematics* DD** CD***
Narratives:
• Design1
• Life cycle analysis for electrical systems
Location and size of:
• Electrical equipment2
• Electric closets3
• Telephone closets3
• Signal closets3
• Electrical distribution equipment Drawings showing:
• Electrical plot plan of existing and proposed underground power (including manholes)
• Telephone systems
• Signal inter-building systems
• Proposed electrical system4
• Electric symbols
• Lighting fixture schedule
• Emergency Life Safety Equipment
(see fire protection)
• Symbols, note, abbreviations List of specialty areas Method of short-circuit calculations Method of voltage drop and demand calculations Utility company correspondence Utility company requirements Load calculations for normal & emergency use Drawings:
• Lighting layouts
• Power layouts
• Signal layouts
• Specialty area layouts
• Demolition plans Riser diagrams Branch circuit wiring (typ.)
Location and size of:
Program Guide, PG-18-15, Volume C 25
Electrical: Schematics* DD** CD***
• Primary distribution switchgear/switchboard
• Engine-generator sets
• Substation/padmounted transformer
• Manholes Location of smoke dampers and duct smoke detectors
Interconnection of electrical control equipment with HVAC equipment (see fire protection)
Smoke partitions and fire alarm zones Fire alarm and signal riser diagrams (see fire protection)
Calculations for emergency generator(s) Phasing scheme Electrical details
* Submit, as a minimum, a single line layout at a scale not less than 1:100 (1/8 inch).
(1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
I. NOTES:
1. Include basic assumptions, points of interconnection, impact of new construction to existing electrical distribution system, current demand loading (high voltage switchgear and primary feeder), and projected load of new construction. Propose various feasible electrical systems for project and provide advantages/disadvantages.
2. Include means and clearances for installation, maintenance, and removal/replacement of equipment.
3. Electrical, signal and telephone closets must stack vertically.
4. Include high voltage and low voltage switchgear, transformers and low voltage main and/or distribution panels, branch panels and methods of feeding 277/480 volt and 120/208 volt normal and emergency panels.
Program Guide, PG-18-15, Volume C 26
J. EQUIPMENT
Equipment: Schematics* DD** CD***
Equipment (on architectural drawing) Activation Equipment List (Excel format)
(1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, Program Guide, PG-18-15, Volume C 27
K. STEAM GENERATION
Steam Generation: Schematics* DD** CD***
Report on new and existing steam loads1 Life-cycle cost analysis of steam supply alternatives
Analysis of alternate plant locations Life-cycle cost analysis for alternative types of equipment
Life-cycle cost analysis for heat recovery alternatives
Data on emissions regulations Data on methods of compliance Selection of major equipment Plot plan with new and existing plant locations Fuel related storage and handling facilities Alternate plan view layouts of new and existing plant
Plot plan of steam generating facility2 Catalog cuts on equipment from two manufacturers
Plans/sections/locations of:
• Equipment
• Major piping
• Pipe supports Demolition Schematic flow diagrams of all piping systems Calculations:
• Equipment sizing
• Major piping systems
• Steam load
• Control and regulating valve
• Flowmeter systems
• Steam trap
• Heating and ventilating system
• Steam piping Schedules Equipment lists Verification of emission regulations List of standards and details
Program Guide, PG-18-15, Volume C 28
Steam Generation: Schematics* DD** CD***
(1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
K. NOTES:
1. Include maximum and minimum summer and winter demands and total annual production.
Provide break-down of new steam loads into categories of end use such as building heating, humidification, reheat, domestic hot water, sterilization, line losses, kitchen, and laundry.
2. Show boilers, pumps, heat recovery devices, tanks, and emission control devices.
Program Guide, PG-18-15, Volume C 29
L. STEAM DISTRIBUTION (OUTSIDE)
Steam Distribution (Outside): Schematics* DD** CD***
Estimate steam and condensate loads Life-cycle cost analysis of steam distribution system
Calculations of pipe sizing Steam distribution plot plan Existing underground utilities Soil conditions report Performance requirements for steam traps
Calculate pipe stress Select expansion facilities for piping Location of:
• Manholes
• Pipe expansion devices Profile drawings including existing utilities Plan views/sections/dimensions for major piping, pipe layout, and pipe supports of:
• Manholes
• Trenches
• Tunnels Demolition Plans
* Submit outside steam generation plans at an appropriate scale to show all work involved.
** Submit outside steam generation plans at same scale as topographic/utility survey incorporating all revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated outside steam generation plans
Program Guide, PG-18-15, Volume C 30
M. SOLID WASTE DISPOSAL SYSTEM INCLUDING INCINERATION
Submit the following:
Solid Waste Disposal System Including Incineration:
Schematics* DD** CD***
Incineration report including:
1. amount and type of waste (new & existing)
2. emissions regulations and types of emissions controls required
3. life-cycle cost analysis on alternatives for waste disposal
4. calculations of equipment sizing and description of types of equipment
5. viable alternatives for waste disposal
Evaluation of capability of existing incinerator Complete description of existing processing system
Tests to determine remaining service life and capacity of system
Plot plan with new plant location and location of existing plant
Plan view layout of new system or existing system showing new equipment location
Load calculations on amount and types of waste Plot plan with location of new processing system Plans/sections showing locations of:
• Equipment
• Major piping Demolition Catalog cuts (2 min.) of equipment selections Emissions control devices Schedules Equipment lists List of standards to be furnished later List of special details to be furnished later Verification of applicable emissions regulations affecting design or operation
Specifications
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch).
Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.
Program Guide, PG-18-15, Volume C 31
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, Program Guide, PG-18-15, Volume C 32
N. AUTOMATIC TRANSPORT
Automatic Transport: Schematics* DD* CD*
Automatic transport systems (ATS):
• Narrative w/ recommended improvements for exiting system
• Traffic study including existing and proposed ATS w/ alternate methods of distribution
Changes to existing systems (arch. dwgs.)
Hoistway (arch. dwg.)
Machine room vents (arch. dwg.)
Type of ventilation (mech. dwg.)
Electrical requirements (elect. dwg.)
Drawings:1, 2, & 3
• Automatic Transport Systems
• Elevators
• Dumbwaiters
• Other ATS systems Sizes/dimensions/details:
• Hoistway enclosures
• Pits
• Pit ladders
• Machine area ladder and railings
• Entrances
• Machine rooms Locations/dimensions:
• Elevator cars
• Entrances
• Counterweights
• Trap doors Location of hoistway vents Location of steel hoisting beams Size of machine beams Size of end reactions Location/detail of machine beam pockets Rail loadings Hydraulic elevator piston pit loads
Details
Program Guide, PG-18-15, Volume C 33
Automatic Transport: Schematics* DD* CD*
• Hoistway entrances for elevators
• Carlifts
• Dumbwaiters
• Trash chutes
• Linen chutes
• ETVS
Elevator machine room equipment layout Interface with automatic recall and shutdown
(see fire protection)
Specifications
* Submit, as a minimum, a single line layout for at a scale not less than 1:100 (1/8 inch).
Submit a complete double line layout of areas of critical importance, at a scale of 1:50 (1/4 inch) including equipment.
** Submit minimum 1:100 (1/8 inch) scale floor plans, new and renovated, incorporating all revisions required by comments from schematics.
*** Submit fully dimensioned, complete, and coordinated 1:100 (1/8 inch) scale floor plans, incorporating all revisions required by comments from the design development phase.
N. NOTES:
1. Include tracking, piping, battery charging areas, blower rooms, queuing areas, cart holding areas, cart washer, central control area, and floor or wall recessed transport control units.
Indicate architectural features in areas to be utilized for these systems. Indicate on architectural drawings all the major equipment located in machine rooms, secondary levels, pits, and the areas…