Attachment 01 - VHA Required Div 01 Spec Sections.pdf
PDF 116 KB Posted
- Attached to
- C1BG--503-22-703 EHRM Training and Admin Space Support Design - Altoona, PA (VA-22-00051831) CANCELLATION
- Solicitation number
- 36C77623R0042
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHA Required Division 01 – General Requirement Specification Sections
* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.
01 00 00 – General Requirements
01 32 16.01 - Architectural and Engineering CPM Schedules
01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build)
01 33 23 - Shop Drawings, Product Data, and Samples
01 35 26 – Safety Requirements
01 42 19 – Reference Standards
01 45 00 - Quality Control
01 45 29 – Testing Laboratory Services
01 57 19 - Temporary Environmental Controls
01 74 19 – Construction Waste Management
01 81 13 – Sustainable Construction Requirements
01 91 00 - General Commissioning Requirements
File details come from the government source that posted it. Updated .