Attachment_05_-_C108435_HEALTH_AND_SAFETY_1.pdf
PDF 106 KB Posted
- Attached to
- NIH Water Treatment Program
- Solicitation number
- 75N99022R00025
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 05 HEALTH AND SAFETY
CONTRACTOR SAFETY AND HEALTH:
https://www.ors.od.nih.gov/sr/dohs/Documents/Contractor%20Health%20and%20Safety%20Requirem ents.pdf
PROJECTS DELIVERABLES:
Affirmation of Deliverables to be fully completed and submitted by their safety officer:
https://www.ors.od.nih.gov/sr/dohs/Documents/Affirmation%20of%20Contractor%20Safety%20Deliver able.pdf Contractor registration with www.constructsecure.com Activity Hazard Analysis to be submitted with the Site Specific Accident Prevention Plan:
https://www.ors.od.nih.gov/sr/dohs/Documents/Activity%20Hazard%20Analysis.pdf Submittal of the attached CESO Checklist A-02 indicating the order the Site Specific Accident Prevention Plan shall be submitted and which programs apply to the scope of work.
Contractor Site Supervisor Orientation scheduled through Mr. Clarence Dukes or Mr. Chris Loser
CRANE PROJECTS:
Affirmation of Deliverables to be fully completed and submitted by their safety officer:
https://www.ors.od.nih.gov/sr/dohs/Documents/Affirmation%20of%20Contractor%20Safety%20Deliver able.pdf Contractor registration with www.constructsecure.com Crane Plan Checklist items:
https://www.ors.od.nih.gov/sr/dohs/Documents/Crane%20Lift%20Plan%20Checklist.pdf Activity Hazard Analysis to be submitted with the Site Specific Accident Prevention Plan:
https://www.ors.od.nih.gov/sr/dohs/Documents/Activity%20Hazard%20Analysis.pdf Contractor Site Supervisor Orientation scheduled through Mr. Clarence Dukes or Mr. Chris Loser
ABATEMENT PROJECT COMPLIANCE REQUIREMENTS:
Abatement activities shall be scheduled through the PO. A list of DEP abatement contractors is available upon request.
Abatement plans shall be submitted to James.Ganz@nih.gov Abatement plans shall meet the COC Matrix attached (i.e. lead, etc.)
ADDITIONAL REFERENCE:
Additional reference(s): https://www.ors.od.nih.gov/sr/dohs/YourRole/Pages/Contractor-Safety- Materials.aspx
Submit complete packages with the project no. C108762 Siemens Maintnenance in the subject line to James.Ganz@nih.gov , safety@nih.gov and maddie.lydon@nih.gov.
https://www.ors.od.nih.gov/sr/dohs/Documents/Contractor%20Health%20and%20Safety%20Requirements.pdf https://www.ors.od.nih.gov/sr/dohs/Documents/Contractor%20Health%20and%20Safety%20Requirements.pdf https://www.ors.od.nih.gov/sr/dohs/Documents/Affirmation%20of%20Contractor%20Safety%20Deliverable.pdf https://www.ors.od.nih.gov/sr/dohs/Documents/Affirmation%20of%20Contractor%20Safety%20Deliverable.pdf http://www.constructsecure.com/ https://www.ors.od.nih.gov/sr/dohs/Documents/Activity%20Hazard%20Analysis.pdf https://www.ors.od.nih.gov/sr/dohs/Documents/Affirmation%20of%20Contractor%20Safety%20Deliverable.pdf https://www.ors.od.nih.gov/sr/dohs/Documents/Affirmation%20of%20Contractor%20Safety%20Deliverable.pdf http://www.constructsecure.com/ https://www.ors.od.nih.gov/sr/dohs/Documents/Crane%20Lift%20Plan%20Checklist.pdf https://www.ors.od.nih.gov/sr/dohs/Documents/Activity%20Hazard%20Analysis.pdf mailto:Brian.Czarnecki@nih.gov https://www.ors.od.nih.gov/sr/dohs/YourRole/Pages/Contractor-Safety-Materials.aspx https://www.ors.od.nih.gov/sr/dohs/YourRole/Pages/Contractor-Safety-Materials.aspx mailto:Brian.Czarnecki@nih.gov mailto:safety@nih.gov mailto:safety@nih.gov mailto:maddie.lydon@nih.gov
File details come from the government source that posted it. Updated .