Attachment 05 - Base Offer Cost Breakdown.pdf
PDF 64 KB Posted
- Solicitation number
- 36C24821R0103
About this file
This document is a cost breakdown template for a two-phase design-build project to replace flanged valves at a veterans hospital. The project number is 573-20-106 and it is a 100% service-disabled veteran-owned small business set-aside being conducted by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8. The cost breakdown template includes 16 construction divisions with spaces to provide labor costs, material costs, and total costs for each. At the bottom is a section to include overhead, profit, bond, and total base offer costs. An attachment to the solicitation provides additional details on the statement of work, experience requirements, and references standards for the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| S02 - solicitation MOD - 36C24821R0103 0001.pdf | ||
| Attachment 08- REFERENCE STANDARDS.doc | DOC document | |
| LOS CERTIFICATION SOLICITATION VERSION 1 Dec 17 2020.doc | DOC document | |
| Attachment 09- Wage Determination.pdf | ||
| Attachment 07 - NETWORK ANALYSIS SCHEDULES.doc | DOC document | |
| Attachment 06 - GENERAL REQUIREMENTS.doc | DOC document | |
| S02 - SOLICITATION FOR 36C24821R0103 - Replace Flanged Valve.pdf | ||
| Attachment 03 - Experience Information Sheet.docx | DOCX document | |
| Attachment 01 -Statement of Work.pdf | ||
| Attachment 02 - EMR.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer Cost Breakdown
Project Number:
Date:
Project Title
Project Location
Offeror Name
Offeror Street
Offeror City State Zip
Item Description Labor Cost Material Cost Total Cost
Division 1 General Requirements $ - $ - $ -
Division 2 Existing Conditions - - -
Division 3 Concrete - - -
Division 4 Masonry - - -
Division 5 Metals - - -
Division 6 Wood and Plastic - - -
Division 7 Thermal & Moisture Protect - - -
Division 8 Doors and Windows - - -
Division 9 Finishes - - -
Division 10 Specialties - - -
Division 11 Equipment - - -
Division 12 Furnishings - - -
Division 13 Special Construction - - -
Division 14 Conveying Equipment - - -
Division 21 Fire Suppression - - -
Division 22 Plumbing - - -
Division 23 HVAC - - -
Division 26 Electrical - - -
Division 27 Communications - - -
Division 28 Electronic Safety & Security - - -
Division 31 Earthwork - - -
Division 32 Exterior Improvements - - -
Division 33 Utilities - - -
Division 34 Transportation Subtotal - - -
Attach: 08
Division Subtotals : $ - $ - $ -
Overhead % 0.00% -
Profit % 0.00% -
Bond % 0.00% -
Overhead/Profit Subtotals : $ -
Total Base Offer Cost $ - $ - $ -