Attachment 05 - Base Offer Cost Breakdown.pdf

PDF 64 KB Posted

Attached to
Y1DA--FY21 NRM Tier 2 (PROJ: 573-20-106) DB - Replace Flanged Valves Hospital Wide
Solicitation number
36C24821R0103
Issued by

About this file

This document is a cost breakdown template for a two-phase design-build project to replace flanged valves at a veterans hospital. The project number is 573-20-106 and it is a 100% service-disabled veteran-owned small business set-aside being conducted by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8. The cost breakdown template includes 16 construction divisions with spaces to provide labor costs, material costs, and total costs for each. At the bottom is a section to include overhead, profit, bond, and total base offer costs. An attachment to the solicitation provides additional details on the statement of work, experience requirements, and references standards for the project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Offer Cost Breakdown

Project Number:

Date:

Project Title

Project Location

Offeror Name

Offeror Street

Offeror City State Zip

Item Description Labor Cost Material Cost Total Cost

Division 1 General Requirements $ - $ - $ -

Division 2 Existing Conditions - - -

Division 3 Concrete - - -

Division 4 Masonry - - -

Division 5 Metals - - -

Division 6 Wood and Plastic - - -

Division 7 Thermal & Moisture Protect - - -

Division 8 Doors and Windows - - -

Division 9 Finishes - - -

Division 10 Specialties - - -

Division 11 Equipment - - -

Division 12 Furnishings - - -

Division 13 Special Construction - - -

Division 14 Conveying Equipment - - -

Division 21 Fire Suppression - - -

Division 22 Plumbing - - -

Division 23 HVAC - - -

Division 26 Electrical - - -

Division 27 Communications - - -

Division 28 Electronic Safety & Security - - -

Division 31 Earthwork - - -

Division 32 Exterior Improvements - - -

Division 33 Utilities - - -

Division 34 Transportation Subtotal - - -

Attach: 08

Division Subtotals : $ - $ - $ -

Overhead % 0.00% -

Profit % 0.00% -

Bond % 0.00% -

Overhead/Profit Subtotals : $ -

Total Base Offer Cost $ - $ - $ -

File details come from the government source that posted it. Updated .