Attachment 04 - MH-107-0518101-ATL SBT Mechanical Penthouse.pdf
PDF 673 KB Posted
- Solicitation number
- 36C24822R0086
About this file
This sources sought notice requests Standard Form 330 qualification packages from architecture and engineering firms for the replacement of chillers at the VA Caribbean Healthcare System in San Juan, Puerto Rico. Firms must be SDVOSB certified and licensed in Puerto Rico. The project scope involves design and construction documents for replacing the Community Living Center and South Bed Tower chillers. The construction value is estimated between $2-5 million. Responses are due by April 28, 2022 and firms will be evaluated on their qualifications, specialized experience with healthcare and renovation projects, capacity, past performance, location, reputation, and claims history. The selected firm may also provide construction period services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 06 - MH2-300 CLC MECH DRW 1.pdf | ||
| Attachment 02 - Site Plan.pdf | ||
| Attachment 05 - MH2-306 CLC MECH DRW 2.pdf | ||
| 36C24822R0086 (AE 672-22-601) Sources Sought.docx | DOCX document | |
| Attachment 01 - SOW.docx | DOCX document | |
| Attachment 03 - VHA Supplemental Contract Requirements for Combatting COVID-19.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S7-3
STAIR
S7-1
S7-2
PH-6
SWITCHGEAR ROOM
EMERGENCY
PH-2
SWITCHGEAR ROOM
CPH-1
CORRIDOR
PH-1
ELEVATOR
MACHINE ROOM
PH-3
MECHANICAL ROOM
PH-4
CONTROL ROOM
FEC
FE
FE
FEC
FEC
FE
FE
FE
FEC
A B C D E F G H J K L MA.8 K.8
1.2
1.3
F.3
T
J J
TT
AHU-1
AHU-2 AHU-3
AHU-4
AHU-5
AHU-6 AHU-7
CH-1
CH-2
CT-2
CT-1
DUCT, DN
18X26 EA
DUCT, DN
18X26 EA
& CHEMICALS
CONTROLS
WATER T’MT
12" CWR
16" CWS
10" CHR
O/A PLENUM
O/A PLENUM O/A PLENUM O/A PLENUM
DN
12" CWS
12" CWR
4" BYPASS
10" INLET
12" OUTLET
BOD=10’-0"
56X44 44X31
3’-9"
BOD=
56X40
FD
TO ROOF
DUCT, DN
18X24 EA
TO ROOF
BOD=10’-6"
34X36
BOD=10’-6"
34X36
FD
BOD=10’-6"
36X34
BOD=10’-6"
36X34
BOD=10’-6"
36X34
B O
D
X
BOD=10’-6"
36X34
FOT
6" MPS
2"PCR
10" CHWR TO CENTRAL PLANT - RUN HIGH
10" CHWS FROM CENTRAL PLANT - RUN HIGH
3" CWR - RUN HIGH
3" CWS - RUN HIGH
4" HWR - RUN LOW
4" HWS - RUN LOW
PLUMBING PIPE, SEE PLUMBING FOR INFO
4"HWS
4"HWR
CHEM TM’T
4" MPS
5"MPS
C W
S
R
FD
FD
FD
FD
FD
FDFDFD
FD
FDFD
FD
FD
FD
FDFD
FD
FD
BOD=10’-6"
36X34
BOD=11’-4"
36X34
BOD=10’-6"
34X36
BOD=10’-6"
36X34
BOD=10’-6"
36X34
FDFD
BOD=10’-6"
36X34
FDFD
BOD=10’-6"
36X34
BOD=10’-6"
34X36
GEF-1
BOD=3’-6"
90X24
ROOM MONITORING PANEL
SCBA CABINET AND REFRIGERATION
EPO
EPO
EPO
ALARM HORN AND STROBE (TYP.)
EMERGENCY POWER OFF SWITCH,
O/A PLENUM
SSCU-2
SSFCU-2
SLOPE TO PRV STATION
4" HPS (100#) FROM BOILER PLANT - RUN LOW,
SLOPE TO SHAFT
2" PUMPED COND. RETURN TO BOILER PLANT - RUN LOW,
REDUCING STATION
STEAM PRESSURE
BOD=10’-6"
34X36
H
S
FD
PLUMBING
SEE
HEATERS
WATER
DOMES.
RISE
RISE RISE
10" CHR
R
S
RISE
8" CHS
10" CHS FROM CEP
CONNECTION
12" EQUALIZER
FD
FLOOR
ABOVE
9’-7"
SG-3
FLOOR
LOW TO
RG-3
ON FLOOR
SSFCU-3,
(BELOW PIPING)
30X22, BOD=9’-6"
DN
10" CHS
R
E Q
U A
L
IZ
E R
AS-1
CHP-1
CHP-2
ET-1
CHP VSD’S
CP-3CP-2CP-1
FM
FM
FM
S
R
S
R
8"CHS
8"CHR
6" CHR
6" CHS
4" CHS
4" CHR
DP
4"
R.O. (TYP.)
3" CHS&R
4" MPS
DN
10" CHR TO CEP
RR
HWP-2
HWP-1
AS-2
CRU-1
ET-2
HX-1
BF-2
FH-4
IEF-4 IEF-5
FH-5
IEF-6 FH-6
V-1
GEF-2
AHU-12
AHU-11
AHU-10
FH-2
IEF-2
FH-1
IEF-1
FM
FM-4
FM-1
FH-3
IEF-3
FM-3
FM-2
ROOF
DUCT TO
DUCT, DOWN
18X24 EA
BOD=10’-6"
36X34
ROOF
DUCT TO
DUCT, DN
12X14 EA
TO ROOF
DUCT
TO ROOF
DUCT, DN
18X36 EA
DOWN TO FLOOR
3’-0" DEEP SHEETMETAL PLENUM BEHIND,
BOTTOM 8’-0" ABOVE FLOOR. PROVIDE
7’-0"X8’-0" LOUVER WITH BIRDSCREEN
THROUGH ROOF
SRV 6" DISCHARGE
BOD=11’-4"
36X34
BEHIND, DOWN TO FLOOR
4’-0" DEEP SHEETMETAL PLENUM
BOTTOM 5’-0" ABOVE FLOOR. PROVIDE
21’-4"X4’-0" LOUVER W/BIRDSCREEN,
BEHIND, DOWN TO FLOOR
4’-0" DEEP SHEETMETAL PLENUM
BOTTOM 5’-0" ABOVE FLOOR. PROVIDE
21’-4"X4’-0" LOUVER W/BIRDSCREEN,
BEHIND, DOWN TO FLOOR
3’-0" DEEP SHEETMETAL PLENUM
BOTTOM 5’-0" ABOVE FLOOR. PROVIDE
9’-0"X4’-0" LOUVER W/BIRDSCREEN,
BEHIND, DOWN TO FLOOR
3’-0" DEEP SHEETMETAL PLENUM
BOTTOM 5’-0" ABOVE FLOOR. PROVIDE
9’-0"X4’-0" LOUVER W/BIRDSCREEN,
BEHIND, DOWN TO FLOOR
4’-0" DEEP SHEETMETAL PLENUM
BOTTOM 5’-0" ABOVE FLOOR. PROVIDE
21’-4"X4’-0" LOUVER W/BIRDSCREEN,
BOD=12’-10"
56X44
FOT
2’-0" DEEP SHEETMETAL PLENUM BEHIND
BOTTOM 12’-0" ABOVE FLOOR. PROVIDE
16’-0"X4’-0" LOUVER W/BIRDSCREEN,
DOWN TO FLOOR
3’-0" DEEP SHEETMETAL PLENUM BEHIND,
BOTTOM 8’-0" ABOVE FLOOR. PROVIDE
12’-0"X8’-0" LOUVER W/BIRDSCREEN
BDD
(TYP)
STOBE AND HORN
REFRIGERANT ALARM
(TYP. 2)
MONITOR
REFRIGERANT
R
IS
E
BOD=13’-5"
56X44
RAF-12
RAF-11
RAF-10RAF-9
RAF-6
RAF-4
RAF-3
RAF-2
RAF-1
90X12
90X12
BOD=8’-0"
90X24
8’-0"
BOD=
90X24
PLENUM BEHIND, DOWN TO FLOOR
4’-0" DEEP X10’-6" TALL SHEETMETAL
BOTTOM 5’-0" ABOVE FLOOR. PROVIDE
25’-0"X4’-0" LOUVER W/BIRDSCREEN,
PLENUM BEHIND, DOWN TO FLOOR
4’-0" DEEP X10’-6" TALL SHEETMETAL
BOTTOM 5’-0" ABOVE FLOOR. PROVIDE
19’-0"X4’-0" LOUVER W/BIRDSCREEN,
EPO
(4)
SR
B O
D
X
SSFCU-1, ON FLOOR
S-3SA
36X36
36X34
36X34
S
S A
36X36
36X36
AND AAV
VACUUM BREAKER
AND AAV
BREAKER
VACUUM
FD
M
M M
2" RS, 1-3/8" RL
O/A PLENUM
O/A PLENUM
3/4" RS
3/8" RL,
AHU-9AHU-8
RAF-8
ROOF CURB
FLASHABLE
STRUCTURAL
ATTACH TO A
SSCU-4
ROOF CURB
FLASHABLE
STRUCTURAL
ATTACHED TO A
3" CHWS&R
DOWN
OGEE
BOD=7’-9"
56X96
BOD=12’-6"
130X20
3"
BOTTOM 4’-0" ABOVE FLOOR
12’-0"X12’-0" LOUVER W/BIRDSCREEN,
PIPING HIGH
ROUTE REFRIGERANT
TO SSFCU-4
X
X
20X16
X
(4) 12X12
SG-2
12X6
SG-2
12X6
SG-2
12X6
SG-2
SSFCU-4
(TYP. 2)
16X18 DOWN
44X56
BOD=8’-10"
30X18, SR
M
A
M
M
FA
G
EXISTING VA HOSPITAL
ADDITION
Office of
Facilities
Management
FULLY SPRINKLERED
SHEET TITLE PROJECT NUMBER
BUILDING NUMBER
DRAWING NUMBERSCALE
NORTH
PROJECT
NORTH
TRUE
DATE
DRAWN
STAMPKEY PLANDATE
CHECKED
CONSULTANTS: PROJECT NAME
ATLANTA, GEORGIA 30309
999 PEACHTREE STREET, NE
HEERY INTERNATIONAL, INC.
0 8’ 16’
1/8" = 1’-0"
NEW
SALEM, IN 47167
601 ANSON STREET, SUITE 101
DEARINGER CENTER
EQUIPMENT SYSTEMS PLANNING, INC.
SAN JUAN, PUERTO RICO
NEW PATIENT BED BUILDING
DEPARTMENT OF VETERANS AFFAIRS
N/A
05181-01
ISSUES
EQUIPMENT SYSTEMS PLANNING, INC.
08/21/06
FINAL SUBMITTAL
o n e e ig h t h in c h o n e f o o t 1
B
A
C
D
E
F t h r e e in c h e s e f o o t o n e a d a lf in c h s e f o o t o n e in e f o o t t h r q u a r t e r s in e f o o t o a lf in e f o o t t h r e e e ig h t h s in e f o o t o q u a r t e r in e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
MH-107
KDM
HMS
08/21/06
HVAC PLAN
30% SUBMITTAL PENTHOUSE FLOOR
95% SUBMITTAL 10/09/06
KEYED NOTES:
131313
MH-302
MH-302
MH-301
MH-301
15 15
171717
FINAL SUBMITTAL 11/11/06
19 18
24 1
1 REVISION #1 02/14/07
27 27 27
2 REVISION #4 04/15/08
3 REVISION #5 05/26/08
4 REVISION #6 07/04/08
5 MSK7 03/10/09
6 MSK9 03/10/09
RECORD DOCUMENT 12/25/09
7 06/15/10POST-TURNOVER REVISION
(APPLIES TO MH-107 ONLY)
SEE DRAWING 2/AF-201. SEE MH-701.
PROVIDE TWO 6’-0" LONG X 3’-0" HIGH HOISTWAY VENT LOUVERS AND MOTORIZED DAMPERS.
IN ROOM PH-6)
TRANSFORMERS
(TYPICAL 4
FAN SPEED.
STRUT-MOUNTED VARIABLE FREQUENCY DRIVE, CONTROLLER IS ISOLATION ROOMS’ EXHAUST
COORDINATE DUCT ROUTING WITH ELEVATOR EQUIPMENT FOOTPRINTS.
STRUT-MOUNTED VARIABLE FREQUENCY DRIVE, CONTROLLING RETURN FAN SPEED.
WALL-MOUNTED VARIABLE FREQUENCY DRIVE, CONTROLLING RETURN FAN SPEED.
SEE DRAWINGS ON AF-201.
STRUT-MOUNTED VARIABLE FREQUENCY DRIVE, CONTROLLING HEATING-WATER PUMP SPEED.
WALL-MOUNTED VARIABLE FREQUENCY DRIVE, CONTROLLING CHILLED-WATER PUMP SPEED.
STRUT-MOUNTED VARIABLE FREQUENCY DRIVE, CONTROLLING ADJACENT AIR HANDLER FAN SPEED.
WALL-MOUNTED VARIABLE FREQUENCY DRIVE, CONTROLLING ADJACENT AIR HANDLER FAN SPEED.
WALL-MOUNTED VARIABLE FREQUENCY DRIVE, CONTROLLING TOWER FAN SPEED.
LOCATION OF MAIN HVAC CONTROL PANELS.
LOCATION OF POWER MONITORING CONTROL SERVER. SEE EP-107.
LOCATION OF ECC (ONE OF TWO), ON DESK. SEE 15902.
(DELETED).
(DELETED)
SEE "TYPICAL PIPE ANCHOR/SUPPORT DETAIL" ON MH-502.
PROVIDE PIPE ANCHOR AT ELEVATOR MACHINE ROOM FLOOR SLAB (APPROX. EL.=175’).
SEE MH-402
THERMOSTAT OPERATING FAN V-1 SPEED.
LOUVER , INTERLOCKED WITH FAN V-1, TO OPEN WHEN FAN V-1 OPERATES AT ITS HIGH SPEED.
PROVIDE A 144X96 MOTORIZED OPERATING DAMPER IN SHEETMETAL COLLAR HIGH BEHIND
STRUT-MOUNTED VARIABLE FREQUENCY DRIVE, CONTROLLING FAN V-1.
PIPE AIR-CONDITIONING UNIT CONDENSATE FROM P-TRAP TO SPILL INTO FLOOR DRAIN.
ISOLATE TRANSFORMER WITH 0.30-INCH STATIC DEFLECTION ELASTOMERIC PAD-TYPE ISOLATORS.
(2) 1-1/8" RS AND (2) 3/8" RL. SPLIT SYSTEM MANUFACTURER TO CONFIRM PIPE SIZES.
ATTACH FAN-COIL TO A 4" HIGH CONCRETE HOUSEKEEPING PAD.
HOUSEKEEPING PAD.
ATTACH FAN-COIL UNIT TO A 8" TALL FLOORSTAND, IT ATTACHED TO A 4" HIGH CONCRETE
PROVIDE 6" WIDE FLEXIBLE FABRIC DUCT CONNECTOR AT FAN-COIL UNIT OUTLET COLLAR.
SPLIT SYSTEM MANUFACTURER TO CONFIRM PIPE SIZES.
SEE MH-108 FOR CONTINUATION.
REFRIGERANT PIPING TO SSFCU-3.
SEE DRAWING 3/AF-201. SEE MH-701.
PROVIDE ONE 6’-0" LONG X 3’-0" HIGH HOISTWAY VENT LOUVERS AND MOTORIZED DAMPERS.
VHASAJMARTIJ35
Text Box
SBT MECH PENTHOUSE
| References |
| gg_ab01, gg_ab01-0518101-ATL.dgn, Default |
| s_nsg01, C: |
| _HII_PRJ |
| new-job |
| s_nsg01-0518101-ATL.dgn, Default |
| a_ncp04, C: |
| _HII_PRJ |
| new-job |
| a_ncp07-0518101-ATL.dgn, Default |
| a_nfp04, C: |
| _HII_PRJ |
| new-job |
| a_nfp07-0518101-ATL.dgn, Default |
| s_ncp04, C: |
| _HII_PRJ |
| new-job |
| s_ncp07-0518101-ATL.dgn, Default |
| a_nc08, a_ncp08-0518101-ATL.dgn, Default |
| m_nhp07, C: |
| _HII_PRJ |
| new-job |
| m_nhp07-0518101-ATL.dgn, Default |
| m_dee, EE-401-0518101-ATL.dgn, Default |
| m_dee02, EE-401-0518101-ATL.dgn, Default |
File details come from the government source that posted it. Updated .