Attachment 04 Maintenance Task List.pdf

PDF 135 KB Posted

Attached to
Vertical Lift Module Maintenance Support Services
Solicitation number
SP330025Q0094
Issued by

About this file

This document is a maintenance task list for Modula Vertical Lift Module Equipment at DLA Distribution facilities. The list outlines required semi-annual and annual maintenance tasks for the vertical lift module system, including detailed inspection and service requirements.

The maintenance tasks are comprehensive and include general visual inspection, carousel operational testing, lubrication of various components (bottom tracks, casters, link assemblies), mechanical inspections (top wheels, roller chains, drive sprockets), electrical system checks (contactors, CIB/IPC panels, foot switches), and safety feature verification. Specific lubrication requirements are detailed, including the use of Drydene grease No 52257 or equivalent, SAE 30W/40W oxidation resistant H104 grade oil for certain components, and SAE 90W gear oil for the gear reducer. All maintenance must be performed according to factory recommended procedures and specifications, with requirements for both electrical service (voltage level checks and adjustments) and mechanical service (inspection and adjustments).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TASK SEMI-ANNUAL ANNUAL *NOTES

General Visual Inspection X X 5 Carousel Operational Test – Initial X X 5 Check Error Reports – Respond as necessary X X 6, 7 Check function of all safety features/components X X 6, 7 Lubricate Bottom Tracks X X 1 Lubricate Casters X X 2 Lubricate Lower Link Assembly X X 3 Lubricate Upper Link Assembly X X 3 Top Wheels X X 7 Top Tracks X X 7 Roller Chains X X 3, 7 Drive & Idler Sprockets X X 7 Hardware X X 7 Top & Bottom Links – Sizing X X 7 Gear Reducer X X 4, 7 V-Belts X X 7 Motor (tach.) X X 7 Motor Brushes X X 7 Current Limit X X 6 IR Comp X X 6 Pillow Blocks – Top & Bottom Drive Sprockets X X 2, 7 Pillow Block Set Screws – Tighten Securely X X 7 Contactors X X 5, 6 CIB / IPC Panels X X 5, 6 Electrical Connections X X 6 Foot Switches X X 6 Hand Switches X X 6, 7 Carousel Operational Test – Final X X 5

Electrical Service: Check voltage levels, adjust, and tighten. Document settings.

Mechanical Service: Inspect and adjust.

TES:

orm ALL maintenance IAW factory recommended procedures and specifications.

MAINTENANCE TASK LIST

Modula Vertical Lift Module Equipment

DLA Distribution

FREQUENCY

ubricate with Drydene grease (No 52257) or equivalent. Fill auto-lubricator reservoirs after tional check.

Lubricate with standard wheel bearing grease or Drydene grease (No 52257) or equivalent.

Lubricate with SAE 30W or SAE 40W oxidation resistant, H104 grade oil.

Lubricate/Replenish with SAE 90W gear oil.

Clean & Inspect.

Attachment-VLM Mtnc Tasks