APPENDIX - B
DRAWINGS
For
CONSTRUCT NEW ADC FACILITY
TYNDALL AFB FLORIDA
FOR PROJECT XLWU 19-8402
SHEET ID
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
G-001
FI
N
A L
R
FP
TY
N
D A
LL
A
IR
F
O R
C E
B A
S E
, F
LO
R
ID
A
C O
N
TR
U C
T N
E W
A D
C F
A C
IL
IT
Y
B
C O
VE
R S
H E
E T
TYNDALL AIR FORCE BASE, FLORIDA
CONTRUCT NEW ADC FACILITY, B1287
DESIGN BUILD RFP
FY 2021, PN XLWU19-8402
SHEET INDEX
SHEET NO. SHEET TITLE
GENERAL
G-001 COVER SHEET AND DRAWING INDEX
G-002 VICINITY AND LOCATION MAP
LIFE SAFETY
LS101 LIFE SAFETY PLAN
CIVIL
C-300 EXIST. CONDITIONS AND REMOVALS
C-301 SITE PLAN
C-302 UTILITY PLAN
ARCHITECTURAL
A-101 FLOOR PLAN
A-102 REFLECTED CEILING PLAN
A-201 EXTERIOR ELEVATIONS
INTERIOR DESIGN
IS101 FURNITURE PLAN
ELECTRICAL
ES100 SITE PLAN - ELECTRICAL
113 115
214a
1052 1053
11531154
1352 1333
B1287
PROJECT SITE
MAIN GATE
COMMERCIAL GATE (CLEVELAND)
HWY. 98
HWY. 98
CL
EV
EL
AN
D
AIREY AVE.
SUWANNEE AVE.
MISSISSIPPI RD.
SU
W
AN
NE
E
AV
E.
HAUL ROUTE
BEACON BEACH ROAD
SHEET ID
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
G-002
FI
N
A L
R
FP
TY
N
D A
LL
A
IR
F
O R
C E
B A
S E
, F
LO
R
N
TR
U C
T N
E W
A D
C F
A C
IL
IT
Y , B
V
IC
IN
IT
Y A
N D
L O
C A
TI
O
N M
A P
NOTES:
1. DISPOSAL AREAS FOR RUBBLE, UNSUITABLE EXCESS
SOIL MATERIALS, OR OTHER CONSTRUCTION DEBRIS
ARE NOT AVAILABLE ON THE BASE FOR THE
CONTRACTOR'S USE. DISPOSAL MUST BE PROVIDED BY
THE CONTRACTOR AT SITES OFF GOVERNMENT LANDS.
2. BORROW SITES ARE NOT AVAILABLE FOR USE BY THE
CONTRACTOR ON THE BASE. ALL BORROW MATERIALS,
TOPSOIL OR OTHER SOIL MATERIAL SHALL BE
PROVIDED FROM COMMERCIAL SOURCES BY THE
CONTRACTOR FROM OFF SITE LOCATIONS. THE
BORROW MATERIAL SELECTED BY THE CONTRACTOR
SHALL BE APPROVED BY THE CONTRACTING OFFICER'S
REPRESENTATIVE. SOILS BROUGHT ON SITE AND USED
FOR BACKFILL SHALL BE PROPERLY TESTED OR
CERTIFIED CLEAN.
3. CONTRACTOR STAGING AREAS SHALL BE RETURNED
TO ORIGINAL CONDITIONS (OR REFLECT NEW
CONSTRUCTION) AS MUCH AS PRACTICAL AT THE
COMPLETION OF CONSTRUCTION.
NTS1 LOCATION MAP (TYNDALL AFB)
PLAN NORTH
113.40 SF
OFFICE
112.36 SF
OFFICE
2 175.67 SF
CONFERENCE
113.71 SF
PARALEGAL
130.43 SF
LOBBY
47.94 SF
UNISEX
43.43 SF
MECH.
42.28 SF
WOMEN'S
46.45 SF
MEN'S
31.49 SF
ELECT.
68.83 SF
STORAGE
31.34 SF
COMM.
COVERED
BREAK AREA
ENTRY CANOPY
107.53 SF
BREAK ROOM
208.38 SF
CORRIDOR
CLOSET
CLOSET
EGRESS WIDTH: 34"
EGRESS CAPACITY: 170 OCC.
EGRESS WIDTH: 34"
EGRESS CAPACITY: 170 OCC.
TRAVEL DISTANCE: 69 FT
COMMON PATH OF TRAVEL: 43.5 FT
LIFE SAFETY LEGEND
EXIT
TRAVEL DISTANCE
BUSINESS OCCUPANCY
100 SQ. FT PER PERSON
ASSEMBLY OCCUPANCY
15 SQ. FT PER PERSON
STORAGE/MECHANICAL
300 SQ. FT PER PERSON
1 HOUR RATED FIRE BARRIER
NO
HATCH
LIFE SAFETY CODE SUMMARY
DESIGN BUILDING CONTRACTOR SHALL PROVIDE FULL LIFE SAFETY PLANS IN ACCORDANCE WITH UFC 3-600-01 AND THE RFP.
APPLICABLE CODES
THE FOLLOWING LIFE SAFETY SUMMARY IS BASED ON THE REQUIREMENTS OF UFC 3-600-01 CHANGE 4, AND THE 2018 EDITION OF THE INTERNATIONAL BUILDING CODE, AND THE 2018 EDITION OF NFPA 101 AS REFERENCED BY THE UFC.
OCCUPANCY TYPE
THE BUILDING IS CONSIDERED MIXED USE NONSEPARATED BUSINESS GROUP B [IBC 304] AND BUSINESS OCCUPANCY [NFPA
101 CH. 38].
HEIGHT AND AREA
NON-SPRINKLERED BUSINESS OCCUPANCIES ARE PERMITTED TO BE 55 FT IN HEIGHT [IBC TABLE 504.3], 2 STORIES [IBC TABLE 504.4], AND 23,000 SQ. FT. IN AREA [IBC TABLE 506.2]. THE NEW BUILDING WILL BE 1-STORY, APPROXIMATELY 14 FEET IN
HEIGHT, AND APPROXIMATELY 1,600 SQ. FT. IN AREA.
CONSTRUCTION TYPE
THE BUILDING WILL BE TYPE IIB CONSTRUCTION WHICH REQUIRES NO RATING FOR THE PRIMARY STRUCTURAL FRAME, ALL
WALLS AND PARTITIONS, AND FLOOR AND ROOF CONSTRUCTION [IBC TABLE 601].
BUILDING SEPARATION
THE BUILDING WILL BE LOCATED GREATER THAN 30 FT FROM A LOT LINE. EXTERIOR WALLS ARE NOT REQUIRED TO BE
RATED [IBC TABLE 602].
REQUIRED FIRE RESISTANCE RATINGS
ALL BUILDING ELEMENTS SHALL BE DESIGNED IN ACCORDANCE WITH IBC TABLE 601 FOR FIRE RESISTANCE RATINGS OF BUILDING ELEMENTS FOR TYPE II CONSTRUCTION. ALL STRUCTURAL ELEMENTS ARE NOT REQUIRED TO BE RATED.
INTERIOR FINISH REQUIREMENTS
INTERIOR FINISHES ARE PERMITTED TO BE CLASS A, B, OR C FOR INTERIOR WALL AND CEILINGS [NFPA 101 38.3.3.2, 12.3.3].
THERMAL AND ACOUSTIC INSULATION SHALL HAVE A FLAME SPREAD RATING NOT HIGHER THAN 75, AND A SMOKE- DEVELOPED RATING NOT HIGHER THAN 150, UNLESS OTHERWISE PERMITTED BY UFC 3-600-01, SECTION 8-3.
FIRE PROTECTION SYSTEMS
THE BUILDING DOES NOT REQUIRE A SPRINKLER SYSTEM IN ACCORDANCE WITH CHAPTER 5 AND 6 OF THE IBC, AND UFC
3-600-01 9-7.2.1.1 BASED ON ITS CONSTRUCTION TYPE, HEIGHT, AND AREA.
THE BUILDING DOES NOT REQUIRE A FIRE ALARM SYSTEM IN ACCORDANCE WITH NFPA 101 38.3.4.1 AND UFC 3-600-01 BASED
ON ITS HEIGHT AND OCCUPANT LOAD OF LESS THAN 50 OCCUPANTS.
THE BUILDING DOES NOT REQUIRE A MASS NOTIFICATION SYSTEM SINCE THE FACILITY IS ROUTINELY OCCUPIED BY LESS THAN 11 PERSONNEL AND HAS A POPULATION DENSITY OF LESS THAN ONE PERSON PER 430 SQ. FT. THEREFORE IT IS
DESIGNATED AS LOW OCCUPANCY AND UFC 4-010-01 DOES NOT APPLY.
A STANDPIPE SYSTEM IS NOT REQUIRED PER UFC 3-600-01 9-10.2.2 BASED ON THE HEIGHT AND AREA.
PER UFC 3-600-01, 9-17.1, GENERAL PURPOSE FIRE EXTINGUISHERS FOR PERSONNEL USE ARE REQUIRED IN ACCORDANCE
WITH NFPA 101 AND NFPA 10.
MEANS OF EGRESS
TWO EXITS ARE PROVIDED FROM THE BUILDING PER NFPA 101 38.2.4.1.
TRAVEL DISTANCE SHALL NOT EXCEED 200 FT [NFPA 101 38.2.6.3]. COMMON PATH OF TRAVEL SHALL NOT EXCEED 75 FT [NFPA 101 38.2.5.3.3]. SEE LIFE SAFETY PLAN FOR EXIT LOCATIONS, EGRESS CAPACITIES AND TRAVEL DISTANCES.
THE EXIT SHALL BE PROVIDED WITH SIGNAGE READILY VISIBLE FROM ANY DIRECTION OF EXIT APPROACH. EXITS SHALL BE PROVIDED WITH CONTINUOUS ILLUMINATION DURING OCCUPIED HOURS, AND SHALL BE PROVIDED WITH EMERGENCY
ILLUMINATION FOR A MINIMUM DURATION OF 1-1/2 HOURS UPON LOSS OF NORMAL LIGHTING.
EMERGENCY LIGHTING NOT REQUIRED BUT WILL BE PROVIDED IN EGRESS CORRIDORS.
FIRE DEPARTMENT ACCESS
FIRE DEPARTMENT AND EMERGENCY VEHICLE ACCESS IS NOT REQUIRED PER UFC 3-600-01 9-1.1 SINCE THE BUILDING IS
LESS THAN 5,000 SQ. FT.
SHEET ID
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
LS101
FI
N
A L
R
FP
TY
N
D A
LL
A
IR
F
O R
C E
B A
S E
, F
LO
R
N
TR
U C
T N
E W
A D
C F
A C
IL
IT
Y
B
LI
FE
S A
FE
TY
P
LA
N
1/4" = 1'-0"1 LIFE SAFETY PLAN
A-201
A-201
A-201
A-201
113.40 SF
OFFICE
112.36 SF
OFFICE
175.67 SF
CONFERENCE
113.71 SF
PARALEGAL
130.43 SF
LOBBY
47.94 SF
UNISEX
43.43 SF
MECH.
42.28 SF
WOMEN'S
46.45 SF
MEN'S
31.49 SF
ELECT.
51' - 4"
68.83 SF
STORAGE
31.34 SF
COMM.
COPIER
COVERED
BREAK AREA
ENTRY CANOPY
107.53 SF
BREAK ROOM
208.38 SF
CORRIDOR
CLOSET
CLOSET
4' - 0"
4' - 0" 4' - 8" 4' - 0" 4' - 8" 4' - 0" 4' - 8"
4'
0"
4' - 0"4' - 8"
4'
8"
4' - 8" 12' - 8" 3' - 4"
4'
0" 3'
4"
ABOVE
10 7
ABOVE
A
A
AAAA
3 4
B
A-102
________________________________________________A-201
A-201
A-201
A-201
8 9 10
0.
:1
SHEET ID
S
IZ
E
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
A-101
FI
N
A L
R
FP
TY
N
D A
LL
A
IR
F
O R
C E
B A
S E
, F
LO
R
N
TR
U C
T N
E W
A D
C F
A C
IL
IT
Y
B
O O
R A
N D
R O
O F
PL
AN
3/16" = 1'-0"1 FLOOR PLAN
3/16" = 1'-0"2 ROOF PLAN
KEY NOTES
1. SPLIT FACED 8 CMU BLOCK.
2. INTERIOR GYPSUM WALL BOARD ON METAL
STUDS.
3. ALUMINUM CANOPY.
4. ALUMINUM COLUMN.
5. ALUMINUM COPING.
6. 4'-0" X 4'-0" STOREFRONT SYSTEM.
7. 3'-0" X 7'-0" HOLLOW METAL DOOR AND FRAME.
8. STANDING SEAM METAL ROOF.
9. ALUMINUM GUTTER.
10. ALUMINUM DOWNSPOUT.
11. STOREFRONT SYSTEM WITH ENTRANCE DOOR.
12. ALUMINUM ENTRANCE DOOR
ROOM SCHEDULE
NUMBER NAME
FLOOR
FINISH WALL FINISH CEILING FINISH
CEILING
HEIGHT COMMENTS
1 OFFICE CARPET PAINTED GWB ACT 9' - 0"
2 OFFICE CARPET PAINTED GWB ACT 9' - 0"
3 CONFERENCE CARPET PAINTED GWB ACT 9' - 0"
4 PARALEGAL CARPET PAINTED GWB ACT 9' - 0"
5 LOBBY POR. TILE PAINTED GWB ACT 9' - 0"
6 UNISEX POR. TILE POR.TILE PAINTED GWB 9' - 0"
7 MECH. CONC. CMU EXPOSED 9' - 0"
8 WOMEN'S POR. TILE POR.TILE PAINTED GWB 9' - 0"
9 MEN'S POR. TILE POR.TILE PAINTED GWB 9' - 0"
10 ELECT. CONC. PAINTED GWB EXPOSED 9' - 0"
11 STORAGE VCT PAINTED GWB ACT 9' - 0"
12 COMM. VCT PAINTED GWB PAINTED GWB 9' - 0"
13 BREAK ROOM POR. TILE PAINTED GWB ACT 9' - 0"
14 CORRIDOR CARPET PAINTED GWB ACT 9' - 0"
15 CLOSET CARPET PAINTED GWB ACT 9' - 0"
16 CLOSET CARPET PAINTED GWB ACT 9' - 0"
DOOR SCHEDULE
NUMBER WIDTH HEIGHT TYPE COMMENTS
1 3' - 0" 7' - 0" INTERIOR WOOD, HM FRAME
2 3' - 0" 7' - 0" INTERIOR WOOD, HM FRAME
3 3' - 0" 7' - 0" INTERIOR WOOD, HM FRAME
4 3' - 0" 7' - 0" INTERIOR WOOD, HM FRAME
6 3' - 0" 7' - 0" INTERIOR WOOD, HM FRAME
7 3' - 0" 7' - 0" HM DOOR AND FRAME
8 3' - 0" 7' - 0" INTERIOR WOOD, HM FRAME
9 3' - 0" 7' - 0" INTERIOR WOOD, HM FRAME
10 3' - 0" 7' - 0" HM DOOR AND FRAME
11 2' - 6" 7' - 0" INTERIOR WOOD, HM FRAME
12 3' - 0" 7' - 0" INTERIOR WOOD, HM FRAME
13 2' - 6" 7' - 0" INTERIOR WOOD, HM FRAME
15 3' - 0" 7' - 0" INTERIOR WOOD, HM FRAME
16 2' - 6" 7' - 0" INTERIOR WOOD, HM FRAME
17 0' - 0" 0' - 0"
WINDOW SCHEDULE
NUMBER WIDTH HEIGHT TYPE
SILL
HEIGHT COMMENTS
A 4' - 0" 4' - 0" Instance-Window-Fixed 3' - 4" B 4' - 0" 3' - 0" Window-Sliding-Double 3' - 0" C 6' - 0" 4' - 0" Instance-Window-Fixed 3' - 0"
0 2' 4' 8' 12'
PLAN NORTH
SCALE:3/16" = 1'-0"
GRAPHIC SCALE
A-201
A-201
A-201
A-201
A-102
ACT CEILING TYP. U.N.O.
GWB
CEILING
GWB
CEILING
OPEN
SHEET ID
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
A-102
FI
N
A L
R
FP
TY
N
D A
LL
A
IR
F
O R
C E
B A
S E
, F
LO
R
N
TR
U C
T N
E W
A D
C F
A C
IL
IT
Y
B
R
EF
LE
C
TE
D
C
EI
LI
N
G P
LA
N
3/16" = 1'-0"1 REFLECTED CEILING PLAN
1/2" = 1'-0"2 MILLWORK ELEVATION
0 2' 4' 8' 12'
PLAN NORTH
SCALE:3/16" = 1'-0"
GRAPHIC SCALE
0 2'1' 4'
SCALE:1/2" = 1'-0"
FLOOR LEVEL
0' - 0"
ROOF PLAN
14' - 0"
5 8
6 7 12
2'
8" 8"
4'
0" 2'
0"
4'
8"
A-102
FLOOR LEVEL
0' - 0"
ROOF PLAN
14' - 0"
6 11
A-102
6'
8"
FLOOR LEVEL
0' - 0"
ROOF PLAN
14' - 0" 1
8" 4'
0"
2'
0" 4'
8"
6 7
FLOOR LEVEL
0' - 0"
ROOF PLAN
14' - 0"
SHEET ID
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
A-201
FI
N
A L
R
FP
TY
N
D A
LL
A
IR
F
O R
C E
B A
S E
, F
LO
R
N
TR
U C
T N
E W
A D
C F
A C
IL
IT
Y
B
B U
IL
D
IN
G
E
LE
V A
TI
O
N S
1/4" = 1'-0"1 NORTH ELEVATION
1/4" = 1'-0"2 SOUTH ELEVATION
KEY NOTES
1. SPLIT FACED 8 CMU BLOCK .
2. SMOOTH FACED 8 CMU BLOCK.
3. ALUMINUM CANOPY.
4. STEEL COLUMN PAINTED.
5. ALUMINUM COPING.
6. 4'-0" X 4'-0" STOREFRONT SYSTEM.
7. 3'-0" X 7'-0" HOLLOW METAL DOOR AND FRAME.
8. STANDING SEAM METAL ROOF.
9. ALUMINUM GUTTER.
10. ALUMINUM DOWNSPOUT.
11. STOREFRONT SYSTEM WITH ENTRANCE DOOR.
12. ALUMINUM ENTRANCE DOOR
1/4" = 1'-0"3 EAST ELEVATION
1/4" = 1'-0"4 WEST ELEVATION
0 4'2' 8'
SCALE:1/4" = 1'-0"
GRAPHIC SCALE
OFFICE STORAGE
ELECT.
COMM.
BREAK ROOM
WOMEN'S
MEN'S
MECH.
UNISEX
LOBBYPARALEGAL
CORRIDOR
CONFERENCE
OFFICE
CLOSET
CLOSET
A-102
BC-1
BC-1
FC-1
FC-1
C-3 MP-1
C-1 BOOKCASE - 5 SHELF
FC-1 FILE CABINET - 5 DRAWER LATERAL
MP-1 MOBILE PEDESTAL - BBF WITH CUSHION
C-1 CHAIR - LOBBY WAITING & OFFICE GUEST CHAIR
C-2 CHAIR -CONFERENCE
C-3 CHAIR - TASK/OFFICES
CR-1 CREDENZA
D-1 DESK - L SHAPED
S-1 SHELVES - STORAGE
T-1 TABLE - CONFERENCE
TV-1 50" TELEVISION
BC-1 CR-1
S-1
C-1,Typ.
C-2,Typ.
C-1,Typ.
BC-1
C-1,Typ.
C-3
D-1
C-3
D-1
REF
T-1
SHEET ID
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
TE
M
A R
K D
E S
C R
IP
TI
O N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
IF101
FI
N
A L
R
FP
TY
N
D A
LL
A
IR
F
O R
C E
B A
S E
, F
LO
R
N
TR
U C
T N
E W
A D
C F
A C
IL
IT
Y
B
FU
R
N
IT
U R
E
PL
AN
1/4" = 1'-0"G6 FURNITURE PLAN
LEGEND
CATV SERVICE
GCEC TRANSFORMER (EXISTING)
TELECOM PEDESTAL (EXISTING)
ELECTRIC ROOM
COMM ROOM
ELECT ROOM 10 COMM ROOM 12
PANEL
PP-1
PANEL
PP-C
SPD SPD
T
SERVICE RATED PANEL
SERVICE ENTRANCE
M
GCEC XFMR (EXISTING)
COMM ROOM 12
TELEPHONE
BACKBOARD
TBB-1
4" SERVICE ENTRANCE
CONDUIT (SEE SITE PLAN)
TELEPHONE PEDESTAL
(EXISTING)
CATV SERVICE
SHEET ID
N
3 5 7 9 11 13 15 17 19
L
J
G
E
C
A
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
2 4 6 8 10 12 14 16 18 20
P
M
K
H
F
D
B
ES100
F
IN
A L
D B
R F
P
T Y
N D
A L L
A
IR
F O
R C
E B
A S
E F
L O
R
ID
A
C O
N S
T R
U C
T N
E W
A D
C F
A C
IL
IT
Y B
S
IT
E P
L A
N
E L E
C T
R
IC
A L
PLAN NORTH
0 15' 30' 60' 1" = 10'-0"A1
SITE PLAN - ELECTRICAL
GENERAL NOTES
DESCRIPTION#
1 SIZE THE ELECTRIC SERVICE ENTRANCE EQUIPMENT PER RFP SECTION 15.4.1
DISTRIBUTION EQUIPMENT.
2 PROVIDE ELECTRICAL SERVICE ENTRANCE PER RFP SECTION B 15.3, SITE
POWER DISTRIBUTION.
3 PROVIDE TELECOM SERVICE ENTRANCE PER RFP SECTION 14.1.3.
4 REFER TO THE RFP SECTION 6,SITEWORK, GEOTECHNICAL AND LANDSCAPING
FOR UTILTY JACKING AND BORING REQUIREMENTS.
12" = 1'-0"F16
POWER RISER DIAGRAM
12" = 1'-0"B16
TELECOM RISER DIAGRAM
1540637365E Stamp
1540637365E Rectangle
File details come from the government source that posted it. Updated .