Attachment 03 - Blank IGE PNQS 25-8705 Gas Line Repair.xlsx
XLSX spreadsheet 18 KB Posted
- Solicitation number
- FA330025Q0518
About this file
The document is an Independent Government Estimate (IGE) Cost Breakdown template for a gas line repair project at Maxwell Air Force Base. The project involves multiple gas line modification tasks, including cutting and capping existing 3" and 8" steel lines, installing new polyethylene lines and valves, and running new gas lines to housing and maintenance areas. The estimate breaks down potential costs into categories such as material, labor, overhead, and profit, though all line items are currently showing $0.00, suggesting this is a blank template prepared for future cost estimation.
The related federal contract opportunity is a 100% Small Business Set-Aside solicitation (FA330025Q0518) issued by the Department of the Air Force Air Education and Training Command. The project's construction magnitude is estimated between $250,000 and $500,000, located at Maxwell AFB in Alabama. The specific scope includes cutting and capping existing gas lines, placing new gas lines, and installing new gas valves in accordance with the project Statement of Work (PNQS 25-8705), with the work to be performed strictly following specified drawings and specifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Total CONSTRUCTION COST ESTIMATE BREAKDOWN OMB No. 0704-0193
| CONTRACTOR | DATE | ADDRESS | 400 Cannon Street | |||||||
| 14-Jan-25 | Maxwell Air Force Base Alabama | |||||||||
| CONTRACT FOR (Work to be performed) | PROPOSED TOTAL CONTRACT PRICE | |||||||||
| Gas Line Repair | $0.00 | |||||||||
| PURCHASE REQUEST NUMBER | PROJECT NUMBER/WORK ORDER | WORK LOCATION | ||||||||
| PNQS 25-8705 Gas Line Repair | Maxwell AFB | |||||||||
| UNIT | MATERIAL/EQUIP. COSTS | LABOR RATES | OTHER | |||||||
| LINE | ITEM | OF | QUANTITY | AVERAGE | DIRECT | LINE | ||||
| NO. | MEASURE | UNIT | TOTAL | RATE | TOTAL | COSTS | TOTAL | |||
| DIVISION 1 (General Requirements) | ||||||||||
| Mobilization | LS | $0.00 | $0.00 | |||||||
| Superintendent | WK | $0.00 | $0.00 | |||||||
| DIVISION 2 (Site Work) | $0.00 | $0.00 | ||||||||
| 1.0 | Cut and Cap 3" steel line. | ea | $0.00 | $0.00 | ||||||
| 2.0 | Run 2" line to Housing | lf | $0.00 | $0.00 | ||||||
| 3.0 | Run 1 1/4" Line to Housing Maint. | lf | $0.00 | $0.00 | ||||||
| 4.0 | Cut and Cap 8" Steel line | ea. | $0.00 | $0.00 | ||||||
| 5.0 | Add 8" poly line tie into 8" Steel | lf | $0.00 | $0.00 | ||||||
| 6.0 | Remove 8" Steel Valve and Replace with 8" Poly Valve | ea. | $0.00 | $0.00 | ||||||
| 7.0 | Install 3" Poly Line | lf | $0.00 | $0.00 | ||||||
| TOTAL | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | ||||||||
| Material Costs | $0.00 | $0.00 | ||||||||
| Tax on Materials | 10% | $0.00 | $0.00 | |||||||
| TOTAL MATERIAL COST | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| Labor Cost | $0.00 | $0.00 | ||||||||
| Insurance & Tax on Labor | 20% | $0.00 | $0.00 | |||||||
| TOTAL LABOR COST | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | ||||||||
| Total Other Direct Costs | $0.00 | $0.00 | $0.00 | |||||||
| Total Material, Labor, Tax & Insurance | $0.00 | $0.00 |
| TOTAL DIRECT COSTS | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | |||
| Overhead | 10% | $0.00 | $0.00 | $0.00 | |
| Subtotal | $0.00 | $0.00 | $0.00 | $0.00 | |
| Profit | 10% | $0.00 | $0.00 | $0.00 | |
| Sub Total | $0.00 | $0.00 | |||
| TOTAL | $0.00 | $0.00 | $0.00 | ||
| Bonds | 2.5% | $0.00 | $0.00 | ||
| TOTAL | $0.00 | $0.00 | $0.00 | ||
| $0.00 | $0.00 |