Attachment 03 - Blank IGE PNQS 25-8705 Gas Line Repair.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Maxwell AFB - PNQS 25-8705 Repair Natural Gas Distribution System Amendment 01
Solicitation number
FA330025Q0518
Issued by

About this file

The document is an Independent Government Estimate (IGE) Cost Breakdown template for a gas line repair project at Maxwell Air Force Base. The project involves multiple gas line modification tasks, including cutting and capping existing 3" and 8" steel lines, installing new polyethylene lines and valves, and running new gas lines to housing and maintenance areas. The estimate breaks down potential costs into categories such as material, labor, overhead, and profit, though all line items are currently showing $0.00, suggesting this is a blank template prepared for future cost estimation.

The related federal contract opportunity is a 100% Small Business Set-Aside solicitation (FA330025Q0518) issued by the Department of the Air Force Air Education and Training Command. The project's construction magnitude is estimated between $250,000 and $500,000, located at Maxwell AFB in Alabama. The specific scope includes cutting and capping existing gas lines, placing new gas lines, and installing new gas valves in accordance with the project Statement of Work (PNQS 25-8705), with the work to be performed strictly following specified drawings and specifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total CONSTRUCTION COST ESTIMATE BREAKDOWN OMB No. 0704-0193

CONTRACTORDATEADDRESS400 Cannon Street
14-Jan-25Maxwell Air Force Base Alabama
CONTRACT FOR (Work to be performed)PROPOSED TOTAL CONTRACT PRICE
Gas Line Repair$0.00
PURCHASE REQUEST NUMBERPROJECT NUMBER/WORK ORDERWORK LOCATION
PNQS 25-8705 Gas Line RepairMaxwell AFB
UNITMATERIAL/EQUIP. COSTSLABOR RATESOTHER
LINEITEMOFQUANTITYAVERAGEDIRECTLINE
NO.MEASUREUNITTOTALRATETOTALCOSTSTOTAL
DIVISION 1 (General Requirements)
MobilizationLS$0.00$0.00
SuperintendentWK$0.00$0.00
DIVISION 2 (Site Work)$0.00$0.00
1.0Cut and Cap 3" steel line.ea$0.00$0.00
2.0Run 2" line to Housinglf$0.00$0.00
3.0Run 1 1/4" Line to Housing Maint.lf$0.00$0.00
4.0Cut and Cap 8" Steel lineea.$0.00$0.00
5.0Add 8" poly line tie into 8" Steellf$0.00$0.00
6.0Remove 8" Steel Valve and Replace with 8" Poly Valveea.$0.00$0.00
7.0Install 3" Poly Linelf$0.00$0.00
TOTAL$0.00$0.00$0.00$0.00$0.00
$0.00$0.00$0.00
Material Costs$0.00$0.00
Tax on Materials10%$0.00$0.00
TOTAL MATERIAL COST$0.00$0.00
$0.00$0.00$0.00
Labor Cost$0.00$0.00
Insurance & Tax on Labor20%$0.00$0.00
TOTAL LABOR COST$0.00$0.00
$0.00$0.00$0.00
Total Other Direct Costs$0.00$0.00$0.00
Total Material, Labor, Tax & Insurance$0.00$0.00
TOTAL DIRECT COSTS$0.00$0.00$0.00
$0.00$0.00$0.00
Overhead10%$0.00$0.00$0.00
Subtotal$0.00$0.00$0.00$0.00
Profit10%$0.00$0.00$0.00
Sub Total$0.00$0.00
TOTAL$0.00$0.00$0.00
Bonds2.5%$0.00$0.00
TOTAL$0.00$0.00$0.00
$0.00$0.00

Signature: ______________________________________