Attachment 02 - Salient Characteristics - Test Stand Chiller.pdf

PDF 98 KB Posted

Attached to
1 SOMXS Hydraulic Test Stand Chiller (Includes Installation and Removal)
Solicitation number
FA441724Q0360
Issued by

About this file

This document appears to be a requirements document for a hydraulic test stand chiller at a government facility. The key details are:

The new chiller must meet the following specifications: refrigerant type 407C, max power 460 VAC/3 Phase/60 Hertz, weight 2100 LBS, flow rate 35.0 GPM@30 PSI, operating temperature 45 degrees, and fluid freeze point 35% Propylene Glycol. The old chiller used R22 refrigerant, had a max power of 460 VAC/3 Phase/60 Hertz, weighed 800 LBS, and operated at 50 degrees. The new chiller requires installation in place of the old unit, and the installer must also remove the old chiller.

This document is related to a federal contract opportunity, Solicitation Number FA441724Q0360, for the 1 SOMXS Hydraulic Test Stand Chiller (Includes Installation and Removal). The contract is being issued by the Department of the Air Force Special Operations Command.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements Document for Hydraulic Test Stand Chiller

In

945 Tully St. Hanger 90028 Hurlburt Field, FL 32544

Pact 180D Hydraulic Test Stand Chiller or equivalent will feature the following

Old Chiller Specification’s

- Refrigerant Type R22

- Max Power 460 VAC/3 Phase/60 Hertz

- Weight:800LBS

- Operating Temperature: Water is chilled to 50 degrees

- Water PSI is approximately 20 PSI throughout the test stand.

New Chiller Specification’s

- Refrigerant:407C

- Max Power 460 VAC/3 Phase/60 Hertz

- Weight:2100 LBS

- Flow Rate: 35.0 GPM@30 PSI

- Operating Temperature: Water is chilled to 45 degrees

- Max Power 460 VAC/3 Phase/60 Hertz

- Fluid Freeze Point: 35% Propylene Glycol

Custom Installation

A new Hydraulic Test Stand Chiller requires installation in place of the old unit. Upon installation, we will also require removal of the old chiller which is provided by the installer of the new unit.