Attachment 02 Instructions to Offerors.docx
DOCX document 27 KB Posted
- Attached to
- CART Services - DFAS Columbus
- Solicitation number
- HQ042324QE020
- Issued by
-
Defense Finance and Accounting Service
About this file
This document contains the Instructions to Offerors for a Request for Quotation (RFQ) issued by the Defense Finance and Accounting Service (DFAS) for Communication Access Realtime Translation or Captioning (CART) services at their Columbus, Ohio location.
The RFQ requires offerors to submit quotations by September 27, 2024 that include a technical approach, past performance, and pricing. The technical approach should address the availability of local and virtual certified interpreters and the process for vetting and assessing interpreters. The past performance section should list up to 3 recent and relevant contracts, and include completed past performance questionnaires. Pricing should be provided for the base year and option periods. Evaluation will be based on the technical approach, past performance, and price, with the technical approach and past performance being more important than price. DFAS intends to award a labor-hour contract to the responsible offeror whose quotation represents the best value.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HQ042324QE020 AMD 0001.pdf | ||
| Attachment 03 Past Performance Questionnaire.docx | DOCX document | |
| Attachment 01 Performance Work Statement.docx | DOCX document | |
| RFQ HQ042324QE020.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HQ042324QE020
DFAS-CO CART Services
INSTRUCTIONS TO VENDORS/EVALUATION FACTORS
Defense Finance and Accounting Service (DFAS) is issuing a Request for Quotation (RFQ) for the services specified in the attached Performance Work Statement (PWS). Quotation evaluation will be conducted in accordance with FAR part 13, with the intention to award a contract to one vendor. Quotations must be received by email to Brent Lehrke at brent.l.lehrke.civ@mail.mil by 2 p.m. ET, 9/27/2024.
Questions regarding this solicitation are due to brent.l.lehrke.civ@mail.mil by 2 p.m. ET 9/23/2024. Questions will be answered at the discretion of the Contracting Officer.
| 1. | GENERAL INSTRUCTIONS: |
| 1.1. | Quotations shall include two attachments and shall be submitted in one email. The first attachment represents the vendor’s response to Non-Priced Factors 1 and 2. The second attachment represents the vendor’s Price Quote, Factor 3. The first page of each attachment shall include the RFQ number, date of submittal, the vendor’s name, address, CAGE code, POC name, phone, and email. Vendors may use the body of their email as a cover letter. Limit the cover letter to 1 page. |
| 1.2. | Text shall be single-spaced, on 8 1/2 x 11-inch paper, with minimum one-inch margins on all sides and minimum 12-point font. Text and graphics shall be in a format readable by Adobe PDF, Microsoft Word, PowerPoint or Excel. Note: There is a 15MB limit for email submissions. |
| 1.3. | Page Limitations. Any pages in excess of the page limitations below will not be considered. |
| Attachments |
| Page Limits |
| First Page Attachment #1 (see 1.1) |
| 1 page |
| Factor 1 – Technical Approach |
| 3 pages |
| Factor 2 – Past Performance |
| 5 pages |
| First Page Attachment #2 (see 1.1) |
| 1 page |
| Factor 3 – Price (Microsoft Excel) |
| No Page Limit |
2. SUBMISSION INSTRUCTIONS:
Factor 1 – Technical Approach Describe your technical approach for meeting PWS requirements. Include a description of the following:
1. A brief explanation of how many local certified interpreters are available to support onsite requests for the DFAS Columbus location.
2. A brief explanation of how many virtual certified interpreters are available to support virtual requests.
3. A brief explanation of how current and new interpreters are vetted and assessed in the hiring processes.
Factor 2 – Past Performance
| (A) | Provide a list of no more than three (3) of your most recent and relevant contracts. Only recent and relevant contracts will be evaluated or considered. Recent means contracts performed or completed within three years from the quotation due date. For contracts that are currently being performed, the vendor must have performed at least six months of service for the contract to be considered. Relevant means similar in scope and complexity to the solicited work. Furnish the following information for each contract referenced: |
| (1) | Company/Division name |
| (2) | Description of Service |
| (3) | Contracting Agency/Customer |
| (4) | Contract Number |
| (5) | Contract Dollar Value |
| (6) | Period of Performance |
| (7) | Verified, up-to-date name, address, email and phone number of the contracting officer/POC |
| (8) | Comments regarding compliance with contract terms and conditions |
| (9) | Comments regarding any known performance deemed unacceptable to the customer, or not in accordance with the contract terms and conditions. |
| (10) | Explanation why the project is relevant to the solicited work. |
| (B) | Questionnaires. Attached to the solicitation is a Past Performance Questionnaire (PPQ). Vendors are required to send the Questionnaire to each contracting officer or point of contact (POC) with knowledge of the vendor’s performance for each contract referenced (unless a past performance record is already available in CPARS for the reference contract). The contracting officer/POC should be instructed to send the Questionnaire directly to the person identified on the first page of the Instructions no later than the quotation due date specified. The vendor is solely responsible for ensuring that Questionnaires are received by the Government no later than the quotation due date. Questionnaires received after the quotation due date will not be considered in the evaluation. |
| (C) | Subcontractor Consent: Past performance information pertaining to a subcontractor cannot be disclosed to the prime contractor without the subcontractor’s consent. Provide a letter, as an additional Attachment, from each subcontractors that will perform significant aspects of this requirement, consenting to the release of their past performance information to the prime contractor. Consent letters do not count toward page limitations. |
Factor 3 – Price Provide a Labor Hour-price for the base year and option periods. The vendor’s price quote shall identify the number of hours and fully-burdened hourly rates for each labor category, and any materials or supplies required to perform the PWS. Rates shall be equal to or lower than the vendor’s commerical rates. Significant discounts are strongly encouraged and shall be identified in the vendor’s price quote.
3. EVALUATION:
The Government intends to evaluate quotations and award a Labor Hour contract based upon the vendor’s proposed technical approach, the vendor’s past performance and price based on initial quotation. Therefore, the vendor’s initial quotation should contain the best terms from a pricing and technical standpoint.
The award shall be made to the responsible vendor whose quotation represents the best value tradeoff to the Government. The Government may reject any or all quotations if such action is in the public interest; accept a quotation other than the lowest priced quotation; and waive informalities and minor irregularities in quotations received.
3.1. Order of Importance
Factor 1 – Technical Approach is equal to Factor 2 – Past Performance. Combined, Factors 1 and 2 are more important than Factor 3 – Price. However, the importance of price will increase if quotations are rated and considered essentially equal in terms of non-price factors.
3.2. Definitions
The following evaluation definitions are provided to assist the evaluator(s):
Deficiency: A material failure of a quotation to meet a Government requirement or a combination of significant weaknesses in a quotation that increases the risk of unsuccessful contract performance to an unacceptable level.
Weakness: A flaw in the quotation that increases the risk of unsuccessful contract performance. A significant weakness in the quotation is a flaw that appreciably increases the risk of unsuccessful contract performance.
Strength: A proposed method or technique in the quotation that exceeds the solicitation requirements.
| 3.3. | Ratings |
| Factor 1 – Technical Approach will be evaluated through an assessment of any strengths, weaknesses, and deficiencies, and will receive one rating described in the table below. TECHNICAL RATINGS/RISK |
| Outstanding |
| Quotation indicates an exceptional approach and understanding of the requirements. Strengths far outweigh any weaknesses. Risk of unsuccessful performance is very low. |
| Good |
| Quotation indicates a thorough approach and understanding of the requirements. Quotation contains strengths which outweigh any weaknesses. Risk of unsuccessful performance is low. |
| Acceptable |
| Quotation meets requirements and indicates an adequate approach and understanding of the requirements. Strengths and weaknesses are offsetting or will have little or no impact on contract performance. Risk of unsuccessful performance is no worse than moderate. |
| Marginal |
| Quotation has not demonstrated an adequate approach and understanding of the requirements. The quotation has one or more weaknesses which are not offset by strengths. Risk of unsuccessful performance is significant. |
| Unacceptable |
| Quotation does not meet requirements and contains one or more deficiencies. Risk of unsuccessful performance is high. |
Factor 2 – Past Performance will be evaluated in the following manner:
The Government shall evaluate recent and relevant performance information on vendors based on the contracts provided by the vendor and Questionnaires received. The Government may seek, and consider in the evaluation, data independently obtained from other government and commercial sources, including databases such as CPARS. Recent means contracts performed or completed within three years from the quotation due date. For contracts that are currently being performed, the contractor must have performed at least six months of service for the contract to be considered. Relevant means similar in scope and complexity to the solicited work.
Projects performed by subcontractors or joint venture partners may be considered relevant provided the information submitted by the contractor demonstrates that the subcontractor or joint venture partner played a major role and critical role in successfully performing the project. Relevant projects performed by the contractor as a prime contractor will be weighed more heavily in the overall evaluation. Contracts performed for the Department of Defense, depending on relevancy, may be considered more significant in the evaluation.
The government reserves the right to give greater consideration to information on those contracts deemed most relevant to the effort described in this solicitation, see Table below:
Relevancy Table
| Very Relevant |
| Present/past performance effort involved essentially the same scope and complexities this solicitation requires. |
| Relevant |
| Present/past performance effort involved much of the scope and complexities this solicitation requires. |
| Somewhat Relevant |
| Present/past performance effort involved some of the scope and complexities this solicitation requires. |
| Not Relevant |
| Present/past performance effort did not involve any of the scope and complexities this solicitation requires. |
The purpose of the past performance evaluation is to allow the government to assess the contractor’s ability to perform the effort described in the solicitation, based on the recency, relevancy and quality of performance on the quoter’s past performance efforts. The assessment process will result in an overall performance confidence rating in accordance with Table 2. Contractors with no relevant past or present performance history shall receive the rating of “Neutral.”
Table 2
High Confidence: Based on the contractor’s performance record, the government has high confidence the contractor will successfully perform the required effort.
Substantial Confidence: Based on the contractor’s performance record, the government has substantial confidence the contractor will successfully perform the required effort.
Satisfactory Confidence: Based on the contractor’s performance record, the government has confidence the contractor will successfully perform the required effort.
Neutral Confidence: Performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
Limited Confidence: Based on the contractor’s performance record, substantial doubt exists that the contractor will successfully perform the required effort.
No Confidence: Based on the contractor’s performance record, extreme doubt exists that the contractor will successfully perform the required effort.
3.4. Factor 3 – Price
Price reasonableness determinations will be in accordance with FAR 13.106-3(a). The government will evaluate whether the proposed level of effort and labor mix are appropriate for the requirements of the PWS to ensure successful performance; and whether the proposed rates per hour are reasonable.
The government has included 52.217-8, Option to Extend Services. For evaluation purposes, the Government will consider the price for the six-month Option to Extend Services as equal to half the price of the last option period quoted. The total evaluated price will include the base period and all options including the Option to Extend Services. Evaluation of options will not obligate the government to exercise the options. Attachment 3 – Past Performance Questionnaire
• Use template to request past and present performance questionnaire.
File details come from the government source that posted it. Updated .