This is a Market Research Questionnaire template designed to gather industry feedback on optimal project delivery methods and contracting vehicles for a government facility construction project.

The questionnaire is divided into five parts addressing company information, delivery method feasibility, budget and cost analysis, collaboration priorities, and overall delivery recommendations. Part I collects company details including CAGE code, socioeconomic status, bonding capacity, bidding intent (prime or subcontractor), and anticipated teaming arrangements. Part II explores foundational delivery approach preferences between owner-controlled design with early builder involvement (IDAC/CM@Risk) versus single-point responsibility (Design-Build), and assesses feasibility of early price certainty and required design completion percentages before guaranteeing maximum price. Part III requests assessment of budget realism for a specified dollar amount, identification of primary cost drivers, and schedule/supply chain risks. Part IV ranks collaboration priorities including cost certainty, schedule certainty, constructability, innovation, and risk reduction; explores participation in proprietary meetings; addresses stipend/honorarium expectations for design and proposal development costs in collaborative procurement; and identifies preferred contract incentives such as shared cost savings or award fees for quality and innovation. Part V seeks recommended delivery paths including Design-Bid-Build (DBB), IDAC/CM@Risk, Design-Build to Budget (DBtB), or Progressive Design-Build (PDB), with recommendations on FAR-based versus Other Transaction Authority (OTA) contracting vehicles. The questionnaire concludes with evaluation criteria weighting and requests for commercial best practices and concerns. Responses are intended to inform the government's acquisition strategy and source selection approach for the specific facility project.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Market Research Questionnaire | Project Delivery & Acquisition Strategy

Industry Questionnaire

(To be completed by Industry Respondents)

Purpose: The Government seeks your expert feedback to select the optimal project delivery method and contracting vehicle (FAR-based or OTA) for this facility.

Part I: Company Information & Bidding Intent

Company Name & CAGE Code

[Insert Name & CAGE]

Point of Contact [Insert Name, Email, Phone]

Socioeconomic Status (Check all that apply)

☐ Large Business ☐ Small Business (SB) ☐ 8(a) Business Development Program ☐ HUBZone Small Business ☐ Service-Disabled Veteran-Owned (SDVOSB) ☐ Women-Owned Small Business (WOSB)

Bonding Capacity Single Project Limit: $[Insert Amount] Aggregate Limit: $[Insert Amount]

Intent to Propose ☐ Yes as Prime ☐ Yes as Sub ☐ No ☐ Undecided

Anticipated Teaming ☐ Standalone Prime ☐ Joint Venture (JV) ☐ Mentor-Protégé ☐ Subcontractor/Designer Only

Part II: Delivery Method Feasibility & Risk

1. Design Control vs. Single-Point Responsibility

Given the project scale and complexity described in Section 1, which foundational approach poses the least risk to cost and schedule?

☐ Owner-Controlled Design: The Government should retain the design team but hire a builder early for constructability/pricing (IDAC / CM@Risk).

☐ Single-Point Responsibility: The Government should shift design-completion risk to a single Design-Build entity (DBtB or PDB).

2. Feasibility of Early Price Certainty

Is it feasible to propose a reliable fixed-price early in the process (e.g., DBtB), or is the scope too undefined, requiring progressive design development (e.g., PDB)?

☐ Yes, a reliable price is achievable early based on the provided requirements.

☐ No, there is too much risk. We would need the design to reach [Insert %] completion before offering a Guaranteed Maximum Price (GMP).

3. Rationale

Please briefly explain the top 1–2 factors driving your answers to Questions 1 and 2:

[Insert Response Here]

4. Relevant Delivery Experience

Has your firm successfully executed a project of similar size/complexity using your recommended delivery method in the last 5 years?

☐ Yes ☐ No

If yes, please provide 1 brief project name/location:

Part III: Budget, Cost Drivers & Schedule

5. Budget Realism

Based on current market data, does the $[Amount] budget appear realistic for this facility type and scale?

6. Primary Cost Drivers

What specific mission needs or functional requirements do you anticipate driving the most cost?

7. Schedule/Supply Chain Risk

What systems or trades present the most significant schedule risk (e.g., long-lead MEP, local labor)?

Part IV: Defining Value, Collaboration & Financial Drivers

8. Collaboration Priorities

Please rank the areas that would benefit most from early builder involvement during the design phase (1 = Greatest Benefit, 5 = Least Benefit).

Area of Collaboration Rank (1–5)

Cost Certainty & Real-Time Estimating [ ]

Schedule Certainty & Phasing [ ]

Constructability & Quality Control [ ]

Innovation & Scope Betterments (Getting more for the money) [ ]

Overall Risk Reduction / Site Mitigations [ ]

9. Industry Engagement & Proprietary Meetings

If the Government utilizes a delivery method that allows for confidential, one-on-one proprietary meetings during the solicitation phase to collaboratively discuss innovative solutions, would your firm participate?

☐ Yes ☐ No

10. Stipends (Honorariums) & Proposal Costs [MILCON ONLY — DELETE IF CIVIL

WORKS]

In highly collaborative procurement methods (like DBtB), offerors will incur design and proposal development costs. Would the Government's offer of a stipend significantly influence your decision to compete?

☐ Yes ☐ No

If Yes, what is a commercially reasonable stipend amount for a project of this scale? [Insert Amount/Percentage Here]

11. Contract Incentives

What specific contract incentives would best drive innovation and maximize your firm's interest in this project?

☐ Shared Cost Savings (e.g., within a GMP structure)

☐ Award Fee for Quality / Innovation

☐ Other: [Insert Response Here]

Part V: Overall Delivery Recommendation

12. Recommended Project Delivery Path

Considering all factors, which project delivery path is optimal for this specific project?

(Select One)

☐ Design-Bid-Build (DBB): Scope is simple and fully defined (closer to 30-35%); traditional FAR Part 36 and FAR 15 is sufficient.

☐ IDAC / CM@Risk: Government needs to control the design but needs early builder collaboration.

☐ Design-Build to Budget (DBtB): Requirements are understood enough to drive a competitive (10-15%), fixed-price solution, use of proprietary meetings to advance design solutions (highly collaborative).

☐ Progressive Design-Build (PDB): Scope is highly complex/undefined. Requires a single contract to collaboratively mature the design before locking in a GMP.

13. Basis of Recommendation & Contracting Vehicle

Please explain your selection above. Indicate if you recommend executing this via a standard FAR-based contract or an Other Transaction Authority (OTA):

14. Evaluation Strategy

For this specific project, what evaluation criteria do you believe the Government should weigh most heavily to ensure success? (Rank top 3: 1 being most important)

☐ Past Performance

☐ Technical Approach/Design

☐ Price/GMP

☐ Key Personnel & Team Integration

☐ Other: [Insert recommendations here]

15. Commercial Best Practices & Concerns

Please provide any additional comments, overly prescriptive constraints to avoid, or commercial best practices the Government should consider: