Attachment_02__Drawings_Specs_O-116_PHOTOS_REDUCED.pdf

PDF 5 MB Posted

Attached to
MOUNT RAINIER NP-BOILER HEAT REPLACEMENT Federal contract opportunity
Solicitation number
140P8325R0006
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

These supplemental photos document the boiler replacement project at Mount Rainier National Park (O-116), providing visual documentation of the existing boiler room, equipment, and facility infrastructure. The image set includes:

A detailed key plan diagram of the boiler room layout, indicating locations for removing existing boiler and water tank, with numbered photo reference points. Subsequent photos show interior views of the boiler, water heater, piping systems along walls and access doors, and the exterior rear access with chimney. Additional images depict the facility's front and side elevations, revealing the building's context within a forested national park setting. The final set of images shows typical ceiling removal documentation, revealing structural wooden beam construction and interior room configurations, which likely supports the planned boiler replacement work.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

rear access to boiler room access to rear laundry room

File details come from the government source that posted it. Updated .