Attachment 02 - Drawings Expand Electrical Distribution (8 pages).pdf
PDF 12 MB Posted
- Attached to
- N061--Expand Electrical Distribution Federal contract opportunity
- Solicitation number
- 36C24823R0102
View the file
Other files for this federal contract opportunity
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in
Acrobat X or Adobe Reader X, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
E
VICINITY MAP
TITLE PAGE, INDEX, AND
PROJECT LOCATION MAPS
VA PROJECT NO. 573A4-18-601
EXPAND ELECTRICAL DISTRIBUTION
LAKE CITY VETERANS AFFAIRS MEDICAL CENTER
LAKE CITY, FL 32025
CONTRACT NO. 36C24818C0269
DEPARTMENT OF VETERANS AFFAIRS
NETWORK CONTRACTING ACTIVITY 8
MALCOM RANDALL VA MEDICAL CENTER
1601 SW ARCHER ROAD
GAINESVILLE, FL 32608
3603 NW 98TH STREET, SUITE B
GAINESVILLE, FLORIDA 32606
PH: (352) 474-6124
FAX. (352) 553-4437
COA: FL #29758
DESIGNED FOR:
Design, Inc.
Veterans Affairs Department of
ADDENDUM #1
FINAL BID DOCUMENTS
OCTOBER 14, 2022
DESIGNED BY:
PROJECT
LOCATION
PROJECT LOCATION MAP
G001
RAH KS
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
U.S. Department of Veterans Affairs
B
C
D
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 10
LAKE CITY, FLORIDA
573A4-18-601
OCTOBER 14, 2022Revisions: Date:
Office of Construction and Facilities Management
APPROVED FOR CONSTRUCTION
3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437
AKEA Design Proj. No. AD160-18
ARCHITECT / ENGINEER OF RECORDCONSULTANT
THIS DOCUMENT CONTAINS A DIGITAL SIGNATURE AND
SEAL BY THE INDIVIDUAL NAMED AT RIGHT. PRINTED
COPIES OF THIS DOCUMENT ARE NOT CONSIDERED
SIGNED AND SEALED, AND THE DIGITAL SIGNATURE
MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
STATE OF
P R
O
FES S IO NA L ENGIN
EE
BER T A . HA FFEM
NNo. 66321 L I C E N S E
F L O R I D A
OF 8
AutoCAD SHX Text
VAMC
ENGINEER-OF-RECORD FL. P.E. NO. FL. P.E. NO. ROBERT A. HAFFEMAN 6632166321
Sheets and Views
G001
2022-10-11T15:30:29-0400
Robert A Haffeman
X
Y
Z
W
U
37 38
Z.1
37.8
X.5
ELECTRICAL POWER PLAN - 1ST
FLOOR - STAGE 1
E101A
Phone: (352) 474-6124 Fax: (352) 553-4437
COPIES OF THIS DOCUMENT ARE NOT CONSIDERED
NL-1-2,4
NH-1-15,17
ELEC ROOM 1A
A186
LL-1-5
LL-1-1
+40"
ELEC. CLOSET-1B
A189
64-DP-EQH1
64-DP-LSH1
64-DP-CRH2
CATS1 EATS
CATS2 LATS
S3S2S164-SWBDHN
M2 M1 T-64SWBDHN
DENTAL CLINIC
A132
RECEPTION
A138
X-RAY
A141
LACTATION
ROOM
A130
OFFICE
A141A
OPERATORY #7
A145
OPERATORY #6
A147
OPERATORY #5
A149
BREAKROOM
A151A
64-SWGR
64-DP-CRH1
LL-1-3
NL-1
LL-1
NH-1
NEW
SUBSTATION
A185
EES ROOM
A184
110 cd 1/2
GBB
86-AHU 2
86-AHU 1
86-AHU 3
SPRL CTRL
30 KVA
ABOVE
C1-XF-1 EQ-XF-1
FUTURE
75 KVA BELOW
FUT. EQL-1
FUT. C1L-1
75 KVA
60A 3P DISC SW
FOR LS-XF-1
125A 3P DISC SW
FOR N-XF-1
FUTURE 125A 3P DISC SW
FOR EQ-XF-1
FOR C1-XF-1
SHEET NOTES
SHEET KEYNOTES
TX
TEMPORARY
GENERATOR
TG-2
TO MH3
REFER FOR
CIVIL PLANS
FOR EXACT
LOCATIONS
BUS
1 ELECTRICAL RISER DIAGRAM - STAGE 1
1 ELECTRICAL POWER PLAN - 1ST FLOOR - STAGE 1
PNL PLA
N
CONDUIT RUNS ABOVE
LACTATION RM CEILING
AND TURNS UP TO 2ND
FLOOR (TYP.)
CONDUIT TURNS DOWN
TO BASMENT PNL (TYP.)
TAC
LS-XF-1 N-XF-1
T86-1
NOT USED
1. INSTALL TEMP 500KW GENERATOR TG-2 INSTALL TEMP 500KW GENERATOR TG-2 IN YARD TEMPORARILY FOR SWGR. 2. REMOVE BUS. REMOVE BUS. 3. DISCONNECT/ REMOVE 5kV BETWEEN DISCONNECT/ REMOVE 5kV BETWEEN A/B SW AND MH3. 4. REMOVE SUBSTATION TX REMOVE SUBSTATION TX 5. TIE TEMPORARY GENERATOR TG-2 TO TIE TEMPORARY GENERATOR TG-2 TO SWGR 6. EXISTING JUNCTION BOX IN BASEMENT EXISTING JUNCTION BOX IN BASEMENT ABOVE CEILING.
EXISTING SWGR
TXF 1000KVA 5KV-208/120 3ø/4W/4W
SW B
BUS DUCT
TO MANHOLE 3
15 CONDUITS
N.T.S.
SCALE:
1/8
5 CONDUITS
PULL BOX
15 LOADS
TEMPORARY GENERATOR TG-2 500KW 208/120 3ø/4W /4W
ELEC ROOM 1A A186
ELEC CLOSET-B AB101
SW A
Sheets and Views
E101A
2022-10-11T15:31:10-0400
Robert A Haffeman
FLOOR - STAGE 2
E101B
Phone: (352) 474-6124 Fax: (352) 553-4437
COPIES OF THIS DOCUMENT ARE NOT CONSIDERED
REFER FOR
CIVIL PLANS
1 ELECTRICAL RISER DIAGRAM - STAGE 2
MCB-1/2
DIST
SWITCH A
SWITCH B
1 ELECTRICAL POWER PLAN - 1ST FLOOR - STAGE 2 N
7. PROVIDE NEW 5KV SUBSTATION. 8. PROVIDE 2 NEW 5KV CIRCUITS IN EXISTING UG CONDUIT - TEST CONNECTION. 9. REFEED EXISTING LOADS. PROVIDE BOXES AND POLARIS LUGS. 10. DISCONNECT AND REMOVE CONDUIT AND WIRE BETWEEN SWGR AND NEW BOX. 11. REMOVE ASSOCIATED CIRCUIT BREAKERS.
EXISTING SWGR
15 LOADS
5 LOADS
2000A MCB
1000A MCB
Sheets and Views
E101B
2022-10-11T15:31:49-0400
Robert A Haffeman
FLOOR - STAGE 3
E101C
Phone: (352) 474-6124 Fax: (352) 553-4437
COPIES OF THIS DOCUMENT ARE NOT CONSIDERED
CATS1
EATS
64-SWBD
REFER FOR
CIVIL PLANS
1 ELECTRICAL RISER DIAGRAM - STAGE 3
MCB-1/2
SWITCH A
SWITCH B
NEW PNL
64-X
1 ELECTRICAL POWER PLAN - 1ST FLOOR - STAGE 3 N
12. DISCONNECT AND REMOVE EXISTING SWGR. PROVIDE NEW SWITCH BOARD IN ITS PLACE. USE TEMPORARY GENERATOR TG-2 FEED TO FEED NEW EQUIPMENT TEMPORARILY. 13. DISCONNECT AND REMOVE FEED TO 15 EXISTING LOADS TO EXISTING PULL BOX. PROVIDE POLARIS TAP AND NEW CONDUCTORS IN EXISTING CONDUITS BETWEEN EXISTING BOX AND NEW SWBD. 14. PROVIDE NEW CONDUIT AND WIRE BETWEEN NEW TX DISTRIBUTION 2 AND NEW SWBD. 15. TEST COMPLETE INSTALLATION, REMOVE TEMPORARY GENERATOR TG-2 AND TEMPORARY FEED.
NEW SWBD
2000A MCB
1000A MCB
5 LOADS
NEW 400A PNL 64-X
Sheets and Views
E101C
2022-10-11T15:32:26-0400
Robert A Haffeman
FLOOR
E102
Phone: (352) 474-6124 Fax: (352) 553-4437
COPIES OF THIS DOCUMENT ARE NOT CONSIDERED
AC
C1-XF-1
REFER FOR
CIVIL PLANS
BUS
1 ELECTRICAL POWER PLAN - 1ST FLOOR
DISCONNECT
AND REMOVE
N
T
REFER TO SHEET E604 FOR ONE LINE OF SWGR SHOWING SAME KEYNOTES
1 2 3 4 5 6 7 8 9
REMOVE CONDUITS
2" CONDUIT TO BASEMENT TO REMAIN
RECONNECT TO NEW 400A PNL 64-X
DISCONNECT AND REMOVE
CONDUITS NUMBER AND ACTION TO FOLLOW
Sheets and Views
E102
2022-10-11T15:33:00-0400
Robert A Haffeman
ELECTRICAL SWGR SCHEDULE
E103
Phone: (352) 474-6124 Fax: (352) 553-4437
COPIES OF THIS DOCUMENT ARE NOT CONSIDERED
Sheets and Views
E103
2022-10-11T15:33:32-0400
Robert A Haffeman
ELECTRICAL NOTES
E104
Phone: (352) 474-6124 Fax: (352) 553-4437
COPIES OF THIS DOCUMENT ARE NOT CONSIDERED
GENERAL ELECTRICAL NOTES (VA LAKE CITY)
VA LAKE CITY - EXPAND ELECTRICAL ADDENDUM 1 - 208-VOLT SWITCHBOARD 7/6/2022 ADD THE FOLLOWING TO DRAWING E-001 DEFINITIONS: FURNISH = PURCHASE EQUIPMENT INSTALL = RECEIVE, MOVE TO THE LOCATION, WIRE, TERMINATE, AND TEST PROVIDE = FURNISH AND INSTALL 1. PROVIDE TEMPORARY GENERATOR - TG2 PROVIDE TEMPORARY GENERATOR - TG2 a. 500KW 500KW b. 208/120 VOLTS, 3-PHASE, 4-WIRE 208/120 VOLTS, 3-PHASE, 4-WIRE c. FILL WITH FUEL FOR THE DURATION OF THE PROJECT. FILL WITH FUEL FOR THE DURATION OF THE PROJECT. 2. TEMPORARY SERVICE - PROVIDE 2000 AMPS OF TEMPORARY FEED BETWEEN TG2 CIRCUIT TEMPORARY SERVICE - PROVIDE 2000 AMPS OF TEMPORARY FEED BETWEEN TG2 CIRCUIT BREAKER AND EXISTING 208VOLT SWITCHGEAR. 3. EXISTING 5KV UG FEED - REMOVE EXISTING 5KV FEED (TWO CIRCUITS) IN THE EXISTING EXISTING 5KV UG FEED - REMOVE EXISTING 5KV FEED (TWO CIRCUITS) IN THE EXISTING UNDERGROUND CONDUIT BETWEEN MANHOLE #3 AND THE AB SWITCH OF THE EXISTING 208VOLT SUBSTATION. ASSUME EACH 5KV CIRCUIT IS 100' OF 3#4/0 WITH 4/0 GROUND IN EXISTING CONDUIT. WIRE SHALL BE 133% INSULATION LEVEL. 4. SUBSTATION - REMOVE EXISTING SUBSTATION, INCLUDING AB SWITCH AND 1000KVA SUBSTATION - REMOVE EXISTING SUBSTATION, INCLUDING AB SWITCH AND 1000KVA TRANSFORMER. 5. BUS DUCT - DISCONNECT AND REMOVE THE EXISTING BUS DUCT BETWEEN THE BUS DUCT - DISCONNECT AND REMOVE THE EXISTING BUS DUCT BETWEEN THE SUBSTATION AND 3000AMP SWITCHGEAR. 6. PROVIDE NEW SUBSTATION - PROVIDE NEW SUBSTATION - a. 2 X 400AMP, A/B FUSED SWITCHES, 6 X 400E FUSES, WITH KIRK KEY INTERLOCKING. 2 X 400AMP, A/B FUSED SWITCHES, 6 X 400E FUSES, WITH KIRK KEY INTERLOCKING. b. 3 X LIGHTNING ARRESTORS 3 X LIGHTNING ARRESTORS c. 1000KVA AIR-COOLED TRANSFORMER, 4160 VOLT PRIMARY AND 208/120 VOLTS 1000KVA AIR-COOLED TRANSFORMER, 4160 VOLT PRIMARY AND 208/120 VOLTS SECONDARY. d. PROVIDE A SWITCHGEAR SECTION FOR TWO MAIN CIRCUIT BREAKERS, MCB-1 AND PROVIDE A SWITCHGEAR SECTION FOR TWO MAIN CIRCUIT BREAKERS, MCB-1 AND MCB-2. BOTH MCBS SHALL BE DRAW-OUT, INSULATED CASE CIRCUIT BREAKERS RATED FOR 100KAIC. MCB-1 = 1000 AMPS. MCB-2 = 2000 AMPS. e. PROVIDE METERING. PROVIDE METERING. i. AMPS AMPS ii. VOLTS VOLTS iii. DEMAND AMPS DEMAND AMPS iv. KW KW v. PF PF f. PROVIDE MONITOR MODULE - RECONNECT THE EXISTING MONITOR TO THE NEW PROVIDE MONITOR MODULE - RECONNECT THE EXISTING MONITOR TO THE NEW SWITCHGEAR g. PROVIDE A SWITCHBOARD SECTION FED BY MCB-1. INCLUDE ADJUSTABLE TRIP TYPE PROVIDE A SWITCHBOARD SECTION FED BY MCB-1. INCLUDE ADJUSTABLE TRIP TYPE MOLDED CASE CIRCUIT BREAKERS (SEE PANEL SCHEDULE), EACH 100KAIC RATED. EQUIP EACH BREAKER WITH A METER WINDOW DISPLAY WITH AMPS AND DEMAND AMPS. 7. GROUNDING - PROVIDE A GROUND WHIP FROM THE TRANSFORMER TO THE NEW GROUND GROUNDING - PROVIDE A GROUND WHIP FROM THE TRANSFORMER TO THE NEW GROUND LOOP. THE WHIP SHALL BE 4/0 COPPER. 8. MATERIAL - ALL CURRENT-CARRYING MATERIAL SHALL BE COPPER. MATERIAL - ALL CURRENT-CARRYING MATERIAL SHALL BE COPPER. 9. JUNCTION BOX - PROVIDE A NEW JUNCTION BOX ABOVE THE EXISTING 208VOLT JUNCTION BOX - PROVIDE A NEW JUNCTION BOX ABOVE THE EXISTING 208VOLT SWITCHGEAR. INTERRUPT THE EXISTING CIRCUITS RISING FROM THE TOP OF THE SWITCHGEAR. TIE THESE CIRCUITS BACK TO THE NEW SWITCHBOARD IN THE NEW SUBSTATION. 10. EXISTING SWITCHGEAR - REMOVE EXISTING 3000AMP, 208VOLT SWITCHGEAR. TEMPORARILY EXISTING SWITCHGEAR - REMOVE EXISTING 3000AMP, 208VOLT SWITCHGEAR. TEMPORARILY FEED THE 15 CIRCUITS RUNNING DOWN INTO THE FLOOR FROM THIS SWITCHGEAR. USE THE TEMPORARY GENERATOR FOR THIS TEMPORARY FEED. THESE EXISTING LOADS MUST REMAIN ENERGIZED FOR THE DURATION OF THE PROJECT. THE ONLY ALLOWABLE DISRUPTION WILL BE DURING CIRCUIT CHANGE OVER. 11. PROVIDE NEW SWITCHBOARD - NEW 2000AMP, 208/120VOLT SWITCHBOARD WITH 15 PROVIDE NEW SWITCHBOARD - NEW 2000AMP, 208/120VOLT SWITCHBOARD WITH 15 ELECTRONIC ADJUSTABLE TRIP, MOLDED CASE CIRCUIT BREAKERS. EQUIP EACH BREAKER WITH A METER WINDOW DISPLAY WITH AMPS AND DEMAND AMPS. FEED THE SWITCHBOARD FROM MCB-2. RECONNECT THE EXISTING LOADS TO THE NEW CIRCUIT BREAKERS. 12. PROVIDE NEW 400 AMP PANEL PNL-64-X. FEED PANEL FROM NEW 400A CB IN PROVIDE NEW 400 AMP PANEL PNL-64-X. FEED PANEL FROM NEW 400A CB IN SWITCHBOARD A. REFER TO RISER DIAGRAM AND PANEL SCHEDULE. 13. PROVIDE THREE TESTS PROVIDE THREE TESTS a. TEST #1 - PERFORM A GROUND-TO-NEUTRAL TEST ON EACH OF THE 20 EXISTING TEST #1 - PERFORM A GROUND-TO-NEUTRAL TEST ON EACH OF THE 20 EXISTING CIRCUITS BEFORE CHANGING THEM TO THE NEW EQUIPMENT. IF THERE IS A SHORT IN THE FEEDS, IDENTIFY IT IN THE REPORT. b. TEST #2 - AFTER ALL EQUIPMENT IS INSTALLED AND ALL MATERIAL IS REMOVED, TEST #2 - AFTER ALL EQUIPMENT IS INSTALLED AND ALL MATERIAL IS REMOVED, RERUN THE GROUND TO NEUTRAL TEST ON BOTH NEW SWITCHBOARDS. ISOLATE ANY NEUTRALS THAT WERE PREVIOUSLY IDENTIFIED AS A SHORT. INCLUDE THIS INFORMATION IN THE REPORT. c. TEST #3 - AFTER ALL EQUIPMENT IS RUNNING AND FULLY CONNECTED, MEASURE THE TEST #3 - AFTER ALL EQUIPMENT IS RUNNING AND FULLY CONNECTED, MEASURE THE AMPS IN EACH FEEDER. INCLUDE THIS INFORMATION IN THE REPORT. d. REPORT - PROVIDE A CERTIFIED TEST REPORT ON ALL THREE TESTS ABOVE.REPORT - PROVIDE A CERTIFIED TEST REPORT ON ALL THREE TESTS ABOVE.
Sheets and Views
E104
2022-10-11T15:34:13-0400
Robert A Haffeman
1 2
3 5
EXISTING SWGR RISER DIAGRAM
Phone: (352) 474-6124 Fax: (352) 553-4437
COPIES OF THIS DOCUMENT ARE NOT CONSIDERED
ELECTRICAL RISER DIAGRAM -
BLDG. 86 - NEW WORK (CONT.'D)
E604
PNL DP 800/800
SPARE 800/400
SPARE 1600/1600
SPARE 800/400
ATS-3 800/300
ATS-4 1000/800
SPARE 1600/1600
ATS-2 800/300
IBB 2 800/300
PNL DP-4 1600/600
PNL RB 1600/600
REF 800/300
PNL PA 800/800
PNL DP-3 1600/800
ATS-5 1600/800
PNL PB-R 800/100
PNL IBB 800/300
I.K-2 1600/600
DP-2 1600/800
XFMR FOR PNL 4XR 800/300
PLA 800/300
PNL DP-B 1600/1200
PNL DP-1 1600/800
PBL 600/100
1100 A
REMOVE 5 x 4" CONDUITS INTO THE WALL THROUGH THE DENTAL SUITE, CONDUITS EMPTY (SEE PHOTO)
2" CONDUIT TO BASEMENT
M
TRANSITION TO BUS DUCT
MCB 3000/3000
3 x 1" CONDUITS
2" CONDUIT TO PNL PLA ON WEST WALL (SEE PHOTO)
2" CONDUIT TO TX T86-1 50 KVA 208V-120/240, 1Ø Ø ON EAST WALL IN SAME ROOM
REFER TO SHEET E102 FOR SHEET KEYNOTES SHOWING PHOTOS WHAT THE CONDUITS SERVE
A/B SW
1000 KVA 4160V - 208/120V 3Ø 4W Ø 4W
NTS
CLOSED CIRCUIT BREAKER
NO CIRCUIT BREAKER
OPEN CIRCUIT BREAKER
Sheets and Views
E604
2022-10-11T15:34:48-0400
Robert A Haffeman