Attachment 02 - Drawings Expand Electrical Distribution (8 pages).pdf

PDF 12 MB Posted

Attached to
N061--Expand Electrical Distribution Federal contract opportunity
Solicitation number
36C24823R0102
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

E

VICINITY MAP

TITLE PAGE, INDEX, AND

PROJECT LOCATION MAPS

VA PROJECT NO. 573A4-18-601

EXPAND ELECTRICAL DISTRIBUTION

LAKE CITY VETERANS AFFAIRS MEDICAL CENTER

LAKE CITY, FL 32025

CONTRACT NO. 36C24818C0269

DEPARTMENT OF VETERANS AFFAIRS

NETWORK CONTRACTING ACTIVITY 8

MALCOM RANDALL VA MEDICAL CENTER

1601 SW ARCHER ROAD

GAINESVILLE, FL 32608

3603 NW 98TH STREET, SUITE B

GAINESVILLE, FLORIDA 32606

PH: (352) 474-6124

FAX. (352) 553-4437

COA: FL #29758

DESIGNED FOR:

Design, Inc.

Veterans Affairs Department of

ADDENDUM #1

FINAL BID DOCUMENTS

OCTOBER 14, 2022

DESIGNED BY:

PROJECT

LOCATION

PROJECT LOCATION MAP

G001

RAH KS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

U.S. Department of Veterans Affairs

B

C

D

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 10

LAKE CITY, FLORIDA

573A4-18-601

OCTOBER 14, 2022Revisions: Date:

Office of Construction and Facilities Management

APPROVED FOR CONSTRUCTION

3603 NW 98th Street, Suite B Gainesville, FL 32606 Phone: (352) 474-6124 Fax: (352) 553-4437

AKEA Design Proj. No. AD160-18

ARCHITECT / ENGINEER OF RECORDCONSULTANT

THIS DOCUMENT CONTAINS A DIGITAL SIGNATURE AND

SEAL BY THE INDIVIDUAL NAMED AT RIGHT. PRINTED

COPIES OF THIS DOCUMENT ARE NOT CONSIDERED

SIGNED AND SEALED, AND THE DIGITAL SIGNATURE

MUST BE VERIFIED ON ANY ELECTRONIC COPIES.

STATE OF

P R

O

FES S IO NA L ENGIN

EE

BER T A . HA FFEM

NNo. 66321 L I C E N S E

F L O R I D A

OF 8

AutoCAD SHX Text

VAMC

ENGINEER-OF-RECORD FL. P.E. NO. FL. P.E. NO. ROBERT A. HAFFEMAN 6632166321

Sheets and Views

G001

2022-10-11T15:30:29-0400

Robert A Haffeman

X

Y

Z

W

U

37 38

Z.1

37.8

X.5

ELECTRICAL POWER PLAN - 1ST

FLOOR - STAGE 1

E101A

Phone: (352) 474-6124 Fax: (352) 553-4437

COPIES OF THIS DOCUMENT ARE NOT CONSIDERED

NL-1-2,4

NH-1-15,17

ELEC ROOM 1A

A186

LL-1-5

LL-1-1

+40"

ELEC. CLOSET-1B

A189

64-DP-EQH1

64-DP-LSH1

64-DP-CRH2

CATS1 EATS

CATS2 LATS

S3S2S164-SWBDHN

M2 M1 T-64SWBDHN

DENTAL CLINIC

A132

RECEPTION

A138

X-RAY

A141

LACTATION

ROOM

A130

OFFICE

A141A

OPERATORY #7

A145

OPERATORY #6

A147

OPERATORY #5

A149

BREAKROOM

A151A

64-SWGR

64-DP-CRH1

LL-1-3

NL-1

LL-1

NH-1

NEW

SUBSTATION

A185

EES ROOM

A184

110 cd 1/2

GBB

86-AHU 2

86-AHU 1

86-AHU 3

SPRL CTRL

30 KVA

ABOVE

C1-XF-1 EQ-XF-1

FUTURE

75 KVA BELOW

FUT. EQL-1

FUT. C1L-1

75 KVA

60A 3P DISC SW

FOR LS-XF-1

125A 3P DISC SW

FOR N-XF-1

FUTURE 125A 3P DISC SW

FOR EQ-XF-1

FOR C1-XF-1

SHEET NOTES

SHEET KEYNOTES

TX

TEMPORARY

GENERATOR

TG-2

TO MH3

REFER FOR

CIVIL PLANS

FOR EXACT

LOCATIONS

BUS

1 ELECTRICAL RISER DIAGRAM - STAGE 1

1 ELECTRICAL POWER PLAN - 1ST FLOOR - STAGE 1

PNL PLA

N

CONDUIT RUNS ABOVE

LACTATION RM CEILING

AND TURNS UP TO 2ND

FLOOR (TYP.)

CONDUIT TURNS DOWN

TO BASMENT PNL (TYP.)

TAC

LS-XF-1 N-XF-1

T86-1

NOT USED

1. INSTALL TEMP 500KW GENERATOR TG-2 INSTALL TEMP 500KW GENERATOR TG-2 IN YARD TEMPORARILY FOR SWGR. 2. REMOVE BUS. REMOVE BUS. 3. DISCONNECT/ REMOVE 5kV BETWEEN DISCONNECT/ REMOVE 5kV BETWEEN A/B SW AND MH3. 4. REMOVE SUBSTATION TX REMOVE SUBSTATION TX 5. TIE TEMPORARY GENERATOR TG-2 TO TIE TEMPORARY GENERATOR TG-2 TO SWGR 6. EXISTING JUNCTION BOX IN BASEMENT EXISTING JUNCTION BOX IN BASEMENT ABOVE CEILING.

EXISTING SWGR

TXF 1000KVA 5KV-208/120 3ø/4W/4W

SW B

BUS DUCT

TO MANHOLE 3

15 CONDUITS

N.T.S.

SCALE:

1/8

5 CONDUITS

PULL BOX

15 LOADS

TEMPORARY GENERATOR TG-2 500KW 208/120 3ø/4W /4W

ELEC ROOM 1A A186

ELEC CLOSET-B AB101

SW A

Sheets and Views

E101A

2022-10-11T15:31:10-0400

Robert A Haffeman

FLOOR - STAGE 2

E101B

Phone: (352) 474-6124 Fax: (352) 553-4437

COPIES OF THIS DOCUMENT ARE NOT CONSIDERED

REFER FOR

CIVIL PLANS

1 ELECTRICAL RISER DIAGRAM - STAGE 2

MCB-1/2

DIST

SWITCH A

SWITCH B

1 ELECTRICAL POWER PLAN - 1ST FLOOR - STAGE 2 N

7. PROVIDE NEW 5KV SUBSTATION. 8. PROVIDE 2 NEW 5KV CIRCUITS IN EXISTING UG CONDUIT - TEST CONNECTION. 9. REFEED EXISTING LOADS. PROVIDE BOXES AND POLARIS LUGS. 10. DISCONNECT AND REMOVE CONDUIT AND WIRE BETWEEN SWGR AND NEW BOX. 11. REMOVE ASSOCIATED CIRCUIT BREAKERS.

EXISTING SWGR

15 LOADS

5 LOADS

2000A MCB

1000A MCB

Sheets and Views

E101B

2022-10-11T15:31:49-0400

Robert A Haffeman

FLOOR - STAGE 3

E101C

Phone: (352) 474-6124 Fax: (352) 553-4437

COPIES OF THIS DOCUMENT ARE NOT CONSIDERED

CATS1

EATS

64-SWBD

REFER FOR

CIVIL PLANS

1 ELECTRICAL RISER DIAGRAM - STAGE 3

MCB-1/2

SWITCH A

SWITCH B

NEW PNL

64-X

1 ELECTRICAL POWER PLAN - 1ST FLOOR - STAGE 3 N

12. DISCONNECT AND REMOVE EXISTING SWGR. PROVIDE NEW SWITCH BOARD IN ITS PLACE. USE TEMPORARY GENERATOR TG-2 FEED TO FEED NEW EQUIPMENT TEMPORARILY. 13. DISCONNECT AND REMOVE FEED TO 15 EXISTING LOADS TO EXISTING PULL BOX. PROVIDE POLARIS TAP AND NEW CONDUCTORS IN EXISTING CONDUITS BETWEEN EXISTING BOX AND NEW SWBD. 14. PROVIDE NEW CONDUIT AND WIRE BETWEEN NEW TX DISTRIBUTION 2 AND NEW SWBD. 15. TEST COMPLETE INSTALLATION, REMOVE TEMPORARY GENERATOR TG-2 AND TEMPORARY FEED.

NEW SWBD

2000A MCB

1000A MCB

5 LOADS

NEW 400A PNL 64-X

Sheets and Views

E101C

2022-10-11T15:32:26-0400

Robert A Haffeman

FLOOR

E102

Phone: (352) 474-6124 Fax: (352) 553-4437

COPIES OF THIS DOCUMENT ARE NOT CONSIDERED

AC

C1-XF-1

REFER FOR

CIVIL PLANS

BUS

1 ELECTRICAL POWER PLAN - 1ST FLOOR

DISCONNECT

AND REMOVE

N

T

REFER TO SHEET E604 FOR ONE LINE OF SWGR SHOWING SAME KEYNOTES

1 2 3 4 5 6 7 8 9

REMOVE CONDUITS

2" CONDUIT TO BASEMENT TO REMAIN

RECONNECT TO NEW 400A PNL 64-X

DISCONNECT AND REMOVE

CONDUITS NUMBER AND ACTION TO FOLLOW

Sheets and Views

E102

2022-10-11T15:33:00-0400

Robert A Haffeman

ELECTRICAL SWGR SCHEDULE

E103

Phone: (352) 474-6124 Fax: (352) 553-4437

COPIES OF THIS DOCUMENT ARE NOT CONSIDERED

Sheets and Views

E103

2022-10-11T15:33:32-0400

Robert A Haffeman

ELECTRICAL NOTES

E104

Phone: (352) 474-6124 Fax: (352) 553-4437

COPIES OF THIS DOCUMENT ARE NOT CONSIDERED

GENERAL ELECTRICAL NOTES (VA LAKE CITY)

VA LAKE CITY - EXPAND ELECTRICAL ADDENDUM 1 - 208-VOLT SWITCHBOARD 7/6/2022 ADD THE FOLLOWING TO DRAWING E-001 DEFINITIONS: FURNISH = PURCHASE EQUIPMENT INSTALL = RECEIVE, MOVE TO THE LOCATION, WIRE, TERMINATE, AND TEST PROVIDE = FURNISH AND INSTALL 1. PROVIDE TEMPORARY GENERATOR - TG2 PROVIDE TEMPORARY GENERATOR - TG2 a. 500KW 500KW b. 208/120 VOLTS, 3-PHASE, 4-WIRE 208/120 VOLTS, 3-PHASE, 4-WIRE c. FILL WITH FUEL FOR THE DURATION OF THE PROJECT. FILL WITH FUEL FOR THE DURATION OF THE PROJECT. 2. TEMPORARY SERVICE - PROVIDE 2000 AMPS OF TEMPORARY FEED BETWEEN TG2 CIRCUIT TEMPORARY SERVICE - PROVIDE 2000 AMPS OF TEMPORARY FEED BETWEEN TG2 CIRCUIT BREAKER AND EXISTING 208VOLT SWITCHGEAR. 3. EXISTING 5KV UG FEED - REMOVE EXISTING 5KV FEED (TWO CIRCUITS) IN THE EXISTING EXISTING 5KV UG FEED - REMOVE EXISTING 5KV FEED (TWO CIRCUITS) IN THE EXISTING UNDERGROUND CONDUIT BETWEEN MANHOLE #3 AND THE AB SWITCH OF THE EXISTING 208VOLT SUBSTATION. ASSUME EACH 5KV CIRCUIT IS 100' OF 3#4/0 WITH 4/0 GROUND IN EXISTING CONDUIT. WIRE SHALL BE 133% INSULATION LEVEL. 4. SUBSTATION - REMOVE EXISTING SUBSTATION, INCLUDING AB SWITCH AND 1000KVA SUBSTATION - REMOVE EXISTING SUBSTATION, INCLUDING AB SWITCH AND 1000KVA TRANSFORMER. 5. BUS DUCT - DISCONNECT AND REMOVE THE EXISTING BUS DUCT BETWEEN THE BUS DUCT - DISCONNECT AND REMOVE THE EXISTING BUS DUCT BETWEEN THE SUBSTATION AND 3000AMP SWITCHGEAR. 6. PROVIDE NEW SUBSTATION - PROVIDE NEW SUBSTATION - a. 2 X 400AMP, A/B FUSED SWITCHES, 6 X 400E FUSES, WITH KIRK KEY INTERLOCKING. 2 X 400AMP, A/B FUSED SWITCHES, 6 X 400E FUSES, WITH KIRK KEY INTERLOCKING. b. 3 X LIGHTNING ARRESTORS 3 X LIGHTNING ARRESTORS c. 1000KVA AIR-COOLED TRANSFORMER, 4160 VOLT PRIMARY AND 208/120 VOLTS 1000KVA AIR-COOLED TRANSFORMER, 4160 VOLT PRIMARY AND 208/120 VOLTS SECONDARY. d. PROVIDE A SWITCHGEAR SECTION FOR TWO MAIN CIRCUIT BREAKERS, MCB-1 AND PROVIDE A SWITCHGEAR SECTION FOR TWO MAIN CIRCUIT BREAKERS, MCB-1 AND MCB-2. BOTH MCBS SHALL BE DRAW-OUT, INSULATED CASE CIRCUIT BREAKERS RATED FOR 100KAIC. MCB-1 = 1000 AMPS. MCB-2 = 2000 AMPS. e. PROVIDE METERING. PROVIDE METERING. i. AMPS AMPS ii. VOLTS VOLTS iii. DEMAND AMPS DEMAND AMPS iv. KW KW v. PF PF f. PROVIDE MONITOR MODULE - RECONNECT THE EXISTING MONITOR TO THE NEW PROVIDE MONITOR MODULE - RECONNECT THE EXISTING MONITOR TO THE NEW SWITCHGEAR g. PROVIDE A SWITCHBOARD SECTION FED BY MCB-1. INCLUDE ADJUSTABLE TRIP TYPE PROVIDE A SWITCHBOARD SECTION FED BY MCB-1. INCLUDE ADJUSTABLE TRIP TYPE MOLDED CASE CIRCUIT BREAKERS (SEE PANEL SCHEDULE), EACH 100KAIC RATED. EQUIP EACH BREAKER WITH A METER WINDOW DISPLAY WITH AMPS AND DEMAND AMPS. 7. GROUNDING - PROVIDE A GROUND WHIP FROM THE TRANSFORMER TO THE NEW GROUND GROUNDING - PROVIDE A GROUND WHIP FROM THE TRANSFORMER TO THE NEW GROUND LOOP. THE WHIP SHALL BE 4/0 COPPER. 8. MATERIAL - ALL CURRENT-CARRYING MATERIAL SHALL BE COPPER. MATERIAL - ALL CURRENT-CARRYING MATERIAL SHALL BE COPPER. 9. JUNCTION BOX - PROVIDE A NEW JUNCTION BOX ABOVE THE EXISTING 208VOLT JUNCTION BOX - PROVIDE A NEW JUNCTION BOX ABOVE THE EXISTING 208VOLT SWITCHGEAR. INTERRUPT THE EXISTING CIRCUITS RISING FROM THE TOP OF THE SWITCHGEAR. TIE THESE CIRCUITS BACK TO THE NEW SWITCHBOARD IN THE NEW SUBSTATION. 10. EXISTING SWITCHGEAR - REMOVE EXISTING 3000AMP, 208VOLT SWITCHGEAR. TEMPORARILY EXISTING SWITCHGEAR - REMOVE EXISTING 3000AMP, 208VOLT SWITCHGEAR. TEMPORARILY FEED THE 15 CIRCUITS RUNNING DOWN INTO THE FLOOR FROM THIS SWITCHGEAR. USE THE TEMPORARY GENERATOR FOR THIS TEMPORARY FEED. THESE EXISTING LOADS MUST REMAIN ENERGIZED FOR THE DURATION OF THE PROJECT. THE ONLY ALLOWABLE DISRUPTION WILL BE DURING CIRCUIT CHANGE OVER. 11. PROVIDE NEW SWITCHBOARD - NEW 2000AMP, 208/120VOLT SWITCHBOARD WITH 15 PROVIDE NEW SWITCHBOARD - NEW 2000AMP, 208/120VOLT SWITCHBOARD WITH 15 ELECTRONIC ADJUSTABLE TRIP, MOLDED CASE CIRCUIT BREAKERS. EQUIP EACH BREAKER WITH A METER WINDOW DISPLAY WITH AMPS AND DEMAND AMPS. FEED THE SWITCHBOARD FROM MCB-2. RECONNECT THE EXISTING LOADS TO THE NEW CIRCUIT BREAKERS. 12. PROVIDE NEW 400 AMP PANEL PNL-64-X. FEED PANEL FROM NEW 400A CB IN PROVIDE NEW 400 AMP PANEL PNL-64-X. FEED PANEL FROM NEW 400A CB IN SWITCHBOARD A. REFER TO RISER DIAGRAM AND PANEL SCHEDULE. 13. PROVIDE THREE TESTS PROVIDE THREE TESTS a. TEST #1 - PERFORM A GROUND-TO-NEUTRAL TEST ON EACH OF THE 20 EXISTING TEST #1 - PERFORM A GROUND-TO-NEUTRAL TEST ON EACH OF THE 20 EXISTING CIRCUITS BEFORE CHANGING THEM TO THE NEW EQUIPMENT. IF THERE IS A SHORT IN THE FEEDS, IDENTIFY IT IN THE REPORT. b. TEST #2 - AFTER ALL EQUIPMENT IS INSTALLED AND ALL MATERIAL IS REMOVED, TEST #2 - AFTER ALL EQUIPMENT IS INSTALLED AND ALL MATERIAL IS REMOVED, RERUN THE GROUND TO NEUTRAL TEST ON BOTH NEW SWITCHBOARDS. ISOLATE ANY NEUTRALS THAT WERE PREVIOUSLY IDENTIFIED AS A SHORT. INCLUDE THIS INFORMATION IN THE REPORT. c. TEST #3 - AFTER ALL EQUIPMENT IS RUNNING AND FULLY CONNECTED, MEASURE THE TEST #3 - AFTER ALL EQUIPMENT IS RUNNING AND FULLY CONNECTED, MEASURE THE AMPS IN EACH FEEDER. INCLUDE THIS INFORMATION IN THE REPORT. d. REPORT - PROVIDE A CERTIFIED TEST REPORT ON ALL THREE TESTS ABOVE.REPORT - PROVIDE A CERTIFIED TEST REPORT ON ALL THREE TESTS ABOVE.

Sheets and Views

E104

2022-10-11T15:34:13-0400

Robert A Haffeman

1 2

3 5

EXISTING SWGR RISER DIAGRAM

Phone: (352) 474-6124 Fax: (352) 553-4437

COPIES OF THIS DOCUMENT ARE NOT CONSIDERED

ELECTRICAL RISER DIAGRAM -

BLDG. 86 - NEW WORK (CONT.'D)

E604

PNL DP 800/800

SPARE 800/400

SPARE 1600/1600

SPARE 800/400

ATS-3 800/300

ATS-4 1000/800

SPARE 1600/1600

ATS-2 800/300

IBB 2 800/300

PNL DP-4 1600/600

PNL RB 1600/600

REF 800/300

PNL PA 800/800

PNL DP-3 1600/800

ATS-5 1600/800

PNL PB-R 800/100

PNL IBB 800/300

I.K-2 1600/600

DP-2 1600/800

XFMR FOR PNL 4XR 800/300

PLA 800/300

PNL DP-B 1600/1200

PNL DP-1 1600/800

PBL 600/100

1100 A

REMOVE 5 x 4" CONDUITS INTO THE WALL THROUGH THE DENTAL SUITE, CONDUITS EMPTY (SEE PHOTO)

2" CONDUIT TO BASEMENT

M

TRANSITION TO BUS DUCT

MCB 3000/3000

3 x 1" CONDUITS

2" CONDUIT TO PNL PLA ON WEST WALL (SEE PHOTO)

2" CONDUIT TO TX T86-1 50 KVA 208V-120/240, 1Ø Ø ON EAST WALL IN SAME ROOM

REFER TO SHEET E102 FOR SHEET KEYNOTES SHOWING PHOTOS WHAT THE CONDUITS SERVE

A/B SW

1000 KVA 4160V - 208/120V 3Ø 4W Ø 4W

NTS

CLOSED CIRCUIT BREAKER

NO CIRCUIT BREAKER

OPEN CIRCUIT BREAKER

Sheets and Views

E604

2022-10-11T15:34:48-0400

Robert A Haffeman