REQUEST FOR QUOTATION (RFQ) 140P8622Q0067
Statement of Work /Description/Justification
Statement of work:
This project calls for a water truck, two pressure washers, and a message board, at set specifications listed below. The water truck will be used to wash and flush the inside of the tunnel and supply water for the pressure washers. During the course of the project the need for specific equipment may change due to project demands and staffing. Equipment can be returned to the awarded company when not in use, and company must be able to provide multiple pieces of equipment at the same time over the dates of the PR (5/30/22 to 12/30/22).
Specific dates will be the week of June 21, the week of Sept. 20, and the week of Dec. 6. Dates subject to change with 72 hour notice. Company awarded PR must have the ability to deliver equipment to 1107 Bunker Road, Sausalito, CA. 94965.
Description/specifications for Water Truck:
Water Truck: Water tank must be between 2,000-2,500 gallons. Must have pressurized spray nozzles. All controls for pump and nozzles must be located in cab so driver can operate spray nozzles and pump. Must have a side spray nozzle that can be adjusted to spray up or down.
Description/specifications for two Pressure Washers:
Pressure washers must have min. 3000 psi and come with interchangeable spray tips. Delivery will be the same time as the water truck.
Massage Board:
Message board will come preprogrammed with message TBD before delivery. Message board will be delivered 14 days before water truck and pressure washers.
Justification:
Equipment is to be used to complete maintenance on the only entrance into the Park. Water trucks, pressure washers, and message boards will be essential in cleaning the tunnel. Project will keep drains and gutters clean and clear of debris, wash the road and walls of the tunnel, providing better travel lanes making it safer for bicyclists and vehicles passing in the tunnel.
Pat Kocer GOGA Roads Supervisor
(415) 331-2301