Attachment 01 - VHA Required Div 01 Spec Sections.docx
DOCX document 19 KB Posted
- Attached to
- C1BG--EHRM Infrastructure Upgrade-Canandaigua, NY Federal contract opportunity
- Solicitation number
- 36C77622R0127
About this file
This presolicitation notice seeks Standard Form 330 qualification packages from firms interested in providing architect-engineering services for an infrastructure upgrade project at the Canandaigua Veterans Affairs Medical Center in Canandaigua, New York. The project requires design and construction period services to develop complete construction documents including drawings, specifications, reports, and commissioning for network infrastructure installation, renovations, and upgrades to information technology systems. The 100% service-disabled veteran-owned small business set-aside contract will have an anticipated period of performance of 365 calendar days for design completion and a construction magnitude of $10-20 million. Qualification packages are due by July 1, 2022 and will be evaluated based on specialized experience, professional qualifications, capacity, past performance, and knowledge of the locality, with the highest rated firms invited to participate in discussions.
View the file
Other files for this federal contract opportunity
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHA Required Division 01 – General Requirement Specification Sections
* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.
01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements