Attachment 01 - VHA Required Div 01 Spec Sections.docx
DOCX document 19 KB Posted
- Solicitation number
- 36C77622R0024
About this file
This pre-solicitation notice requests Standard Form 330 qualification packages from architectural and engineering firms for an Architect-Engineer design contract to provide complete construction documents for EHRM Infrastructure Upgrades at the VA Hampton VA Medical Center in Hampton, Virginia. Firms must submit SF 330s by January 26, 2022 at 4:00 PM Eastern Time to be considered. The design must be complete and bid-ready within 338 calendar days of award. Required disciplines include architecture, mechanical, electrical, plumbing, structural, civil, fire protection, hazardous materials, physical security, cost estimation, and project management. The contract value is estimated between $20-50 million. Evaluation criteria include specialized experience with healthcare IT and network infrastructure projects, demonstrated experience and qualifications of staff, capacity and past performance, knowledge of the project locality, and experience providing construction period services. The project has a 100% SDVOSB set-aside.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHA Required Division 01 – General Requirement Specification Sections
* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.
01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements
File details come from the government source that posted it. Updated .