Attachment 01 VHA Required Div 01 General Requirement Specification.pdf

PDF 210 KB Posted

Attached to
C1BG--402-22-700 EHRM Infrastructure Upgrades - Togus ME (VA-22-00030102)
Solicitation number
36C77622R0080
Issued by

About this file

This presolicitation notice seeks Statements of Qualifications from firms interested in providing architect-engineer services for the EHRM Infrastructure Upgrades project located at the Togus VA Medical Center in Augusta, Maine. The project requires a full design team to complete design and construction documents for network infrastructure installation, renovations, and upgrades to information technology systems across multiple buildings. The design must be bid-ready within 301 calendar days of award. The construction value is estimated between $10-20 million.

Statements of Qualifications are due by June 7, 2022 following the submission requirements detailed. Firms will be evaluated based on specialized experience with similar healthcare IT and network projects, professional qualifications of staff, capacity to complete the work on schedule, past performance, knowledge of the project locality, and experience providing construction period services. The project has a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses. The selected firm will receive the solicitation for an firm-fixed price architect-engineer services contract.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA Required Division 01 – General Requirement Specification Sections

* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.

01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements

File details come from the government source that posted it. Updated .