Attachment 01 - Statement of Work Repair Water Main B711.pdf
PDF 62 KB Posted
- Attached to
- B711 Repair Water Line
- Solicitation number
- FA303025Q0009
About this file
This Statement of Work details repair requirements for a water main in Room 7138 at Goodfellow AFB. The contractor must repair a 4" copper pipe domestic potable water supply line, which includes interior excavation, concrete restoration, and complete room rehabilitation.
The work requires the contractor to provide all materials and comply with Goodfellow AFB Standards, OSHA regulations, IPC, and UFC 3-230-01. Specific requirements include: demolition and excavation of Room 7138 chase to access and repair leaks using 4" TYPE K Hard Copper with silver solder, restoration of concrete slab with reinforcement bars and base course material, installation of new fiberglass pipe insulation with polypropylene vapor jacket, replacement of ceramic tile flooring/cove base (approximately 65SF & 46LF), and complete restoration of Room 7138 including walls, drywall, paint, shower unit, tile, and flooring. The contractor must re-install an existing metal access panel on the interior kitchen wall with specific placement requirements. Final inspection requires 7 days advance written notice to the Contracting Officer.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3.4 CONTRACTOR PROVIDED MATERIALS (CPM): The Contractor shall provide all materials and shall comply with Goodfellow AFB Standards and all OSHA regulations, the IPC (International Plumbing Code), UFC 3-230-01, and the following project specific criteria.
a. Provide equipment and materials for repairing 4” Copper pipe to domestic potable water supply line
b. Provide equipment and materials for interior excavation
c. Provide new concrete and materials to restore concrete slab to its original state.
d. Re-use non-locking metal access panel installed on the exterior of the chase
e. Provide new piping and transition materials for a durable, reliable connection from existing piping to repaired areas/fittings
f. Provide new fiberglass pipe insulation with polypropylene vapor jacket to all interior piping
g. Provide protective materials to prevent damage to nearby carpet, furnishings, and appliances.
h. Provide materials to restore demolition applied to Room 7138 to include but not limited to walls, drywall, tape, joint compound, color matched paint, Shower unit, electrical, tile, flooring etc.
PART 4 – EXECUTION:
4.1 GENERAL: All work shall be installed as shown and in accordance with the manufacturer's diagrams and instructions, unless otherwise specified. All dimensions are shown for information only. Contractor shall field verify all dimensions and site conditions.
4.2 INSTALLATION:
a. Demo and Excavate the interior of Room 7138 chase as needed to establish access to the existing supply line/ elbow fitting and repair all leaks
b. All repairs will be completed with 4” TYPE K Hard Copper, silver solder
c. Backfill exterior excavations in 12 inch compacted lifts until surfaces are restored
d. Restore interior concrete to include reinforcement bars and 1 inch of compacted base course material. Finish will match adjacent existing surface
e. Restore Room 7138 to its original foot print include walls, drywall, tape, color matched interior paint, shower unit, tile, flooring etc. to match nearby finishes
f. Remove and replace all ceramic tile flooring/cove base in Kitchen, bathroom, and closet.
(Approx. 65SF & 46LF)
g. Current metal access panel shall be re-installed on the interior kitchen wall that houses the chase. The panel must be installed with the outer surface of the panel flush with the adjacent drywall. Placement will be at least 12 inches from the back refrigerator wall, at least 15 inches from the kitchen floor. Upon completion the interior wall will be free of defects.
4.3 CONTRACTOR QUALITY CONTROL: Any work found not to be in compliance with the contract shall be promptly removed and replaced or corrected in an approved manner at no additional cost to the Government.
4.4 FINAL INSPECTION: The Contractor shall advise the Contracting Officer in writing of the Contractor's desired final inspection date seven (7) calendar days in advance of that desired date to permit proper coordination. The date selected shall provide adequate time for Contractor performed corrections of final inspection deficiencies within the contract performance time. The Contracting Officer will be the final authority for determining whether or not the Contractor's performance is sufficiently advanced to warrant a final inspection.
END OF STATEMENT OF WORK