ENGINEERING DRAFTING TEMPLATE – NON FP03 1 of 5 Updated 3/16/2020 (UPDATED Thru FAC 2005-49)
C-1 STATEMENT OF WORK/SPECIFICATIONS
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.
1. Move room furnishings (tables, desk, refrigerators, lab equipment; items identified during Pre-Bid walk-through) and coordinate with the COR the temporary storage/placement of furnishings while work in each individual room is being accomplished.
2. Remove existing asbestos floor tiling and asbestos containing mastic from:
Base Rooms (Approx. 2100 SF): Rooms 117,128, 206, 208, 211, 215, 216, 301, 304, 306, 310, 311.
Additive Rooms (Approx. 2400 SF): Rooms 118, 123, 124, 125, 126, 129, 202, 203, 207, 302, 303, 305.
See drawings for exact location of work areas.
3. Install Government Furnished new commercial grade Vinyl Composition Tile (matching
VCT) as new floor covering in all areas where asbestos tile was removed. Provide and install new rubber cove base around new VCT flooring. (Approx. 900 LF)
C-2 PROJECT LOCATION
Olympia Forestry Sciences Laboratory
3625 93rd Ave., SW
Olympia, WA 98512
C-3 SPECIFICATIONS
AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA INDEX OF FEDERAL
SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS FPMR
PART 101-29 (FAR 52.211-1) (AUG 1998)
(a) The GSA Index of Federal Specifications, Standards and Commercial Item Description, FPMR
Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to--
GSA Federal Supply Service
Specifications Section, Suite 8100
470 East L'Enfant Plaza SW
Washington, DC 20407
Telephone (202) 619-8925
Facsimile (202) 619-8978.
ENGINEERING DRAFTING TEMPLATE – NON FP03 2 of 5 Updated 3/16/2020
(b) If the General Services Administration, Department of Agriculture, or Department of Veterans
Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (a) of this provision. Additional copies will be issued for a fee.
AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA INDEX OF
FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM
DESCRIPTIONS
The specifications cited in this solicitation may be obtained from:
Specification Address
ASTM Standards American Society for Testing and Materials
1916 Race Street
Philadelphia, PA 19103
(215) 199-5462
AASHTO Standards American Association of State Highway and
Transportation Officials
341 National Press Building
Washington, D.C. 20024
The request should identify the solicitation number and the specification requested by date, title, and number, as cited in the solicitation.
C-4 SUBMITTALS
Submittals shall include the following unless otherwise required in the specification:
1. Date and revision dates.
2. Project name and contract number.
3. Names of Contractor, subcontractor, supplier, and manufacturer.
4. Specifications section number.
5. Field dimensions and relation to adjacent structures.
6. Applicable standards such as ASTM or Federal Specifications.
7. Contractor's stamp, initial or signature, certifying the review of submittal, verification of field measurements and compliance with contract documents. Provide all submittals within 14 calendar days of contract award unless otherwise required by the specification.
C-5 PRODUCT SAMPLES AND/OR SUBMITTALS
The following product samples and/or submittals are required for this project:
Title Referenced by
Specification No
Time of Government Approval
After Submittal
ENGINEERING DRAFTING TEMPLATE – NON FP03 3 of 5 Updated 3/16/2020
Intial Submittal Report 02 82 13 10 days
Close out Submittal
Report
02 82 13 N/A
Product data- Resilient base
09 65 00 7 days
C-6 SHOP DRAWINGS
The following shop drawings shall be submitted on this project:
Time of Government Approval
None
C-7 MATERIAL CERTIFICATIONS AND TESTING REPORTS
The following material certifications and/or testing reports shall be submitted on this project:
Time of Government Approval
Air Test Results 02 82 13 N/A
GOVERNMENT-FURNISHED PROPERTY
The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the FAR clauses “52.245-1 -- Government Property”, or “52.245-9 --
Use and Charges” as applicable.
Item No. Description Quantity Delivery Date
51810031T270A Armstrong Standard Excelon VCT 3000 SF Upon Request
POTENTIAL SAFETY HAZARDS
(a) Data and information furnished or referred to below is for the Contractor's information. The
Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. This list shall not be deemed to be all-inclusive. The Contractor shall bear the sole responsibility for taking all appropriate actions necessary to prevent accidents and injuries to individuals at the worksite.
(b) The following checked activities have been identified by the Government as potential safety
ENGINEERING DRAFTING TEMPLATE – NON FP03 4 of 5 Updated 3/16/2020 hazards.
[ ] Confined space entry.
[ ] Temporary excavation/deep trenching/slope stability.
[ ] Tree falling.
[ ] Fall hazard from work heights exceeding six feet.
[ ] Blasting.
[ ] Traffic control on high-volume and/or high-speed and/or limited visibility roads.
[ ] Heavy equipment operation.
[ ] Tree climbing and/or tower climbing.
[ ] Fire hazards.
[x] Hazardous materials handling.
[ ] Electrical hazard.
[ ] Hydraulic and/or pneumatic and/or other high pressure hazards.
[ ] Mechanical hazards such as pulleys, springs, etc.
[ ] Other __________________________________
SALVAGE RIGHTS
No Contractor salvage rights exist under the contract unless specifically provided elsewhere herein.
FINAL CLEANUP
Contractor shall remove and dispose all of its own trash and refuse from the contract area. Material to be removed includes, but is not limited to refuse such as tin cans, aluminum foil, glass, paper, garbage, etc. This Cleanup is a subsidiary item for which no special payment will be made. All debris shall be disposed of off National Forest Land and in accordance with State and Local disposal requirements.
METHODS OF MEASUREMENT
One of the following methods of measurement for determining final payment is DESIGNATED on the
SCHEDULE OF ITEMS for each pay item:
(a) Designed Quantities (DQ). These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units SHOWN in the SCHEDULE OF ITEMS may be authorized under any of the following conditions:
(1) As a result of changes in the work authorized by the Contracting Officer.
(2) As a result of the Contracting Officer determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.
(3) As a result of the Contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or
ENGINEERING DRAFTING TEMPLATE – NON FP03 5 of 5 Updated 3/16/2020 more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.
(b) Staked Quantities (SQ). These quantities are determined from staked measurements prior to construction.
(c) Actual Quantities (AQ). These quantities are determined from measurement of completed work.
(d) Vehicle Quantities (VQ). These quantities are measured or weighed in hauling vehicles.
(e) Lump Sum Quantities (LSQ). These quantities denote one complete unit of work as required by or described in the contract including necessary materials, equipment, and labor to complete the job. They will not be measured.
STATE ELECTRICAL INSPECTION AND COUNTY BUILDING PERMITS
The Contractor shall arrange for and provide the State Electrical inspection. When requesting the inspection inform the Building Permit Department of the federal limitation described below. The
Contractor shall not obtain any building permits or inspections other than the State Electrical inspection.
Federal law validated by the State Attorney General, verify that the Federal Government and its
Contractors may be exempted from State/Local Building Permits and Fees for projects located on
Federal Installations [including all federal lands. Contractor State Licenses will not be jeopardized by following this requirement to avoid the State/County permit system. This applies to the prime
Contractor and all subcontractors.
PUBLIC OFFICIALS NOT PERSONALLY LIABLE
There shall be no personal liability upon the Government or officer in charge, their agents or employees, for any act performed in the discharge of any duty imposed or the exercise of any power or authority conferred upon them by, or within the scope of the contract, it being understood that in all such matters they act solely as agents and representatives of the Government.
PAYMENT FOR PERFORMANCE AND PAYMENT SECURITY EXPENSES
It is mutually agreed that the premium costs for performance bonds, payment bonds and alternative payment protections furnished for this contract are included in the total amount bid for other items and that any payment to the Contractor for the cost of bonds made in accordance with FAR 52.232-5 refers only to corporate sureties listed in the current Department of Treasury Circular 570 and no advance payment will be made for bond premiums where other than corporate surety bonds are furnished. Bond premiums as used in this paragraph and FAR 52.232-5 shall include any Small Business Administration fees paid in connection with SBA guaranteed corporate surety bonds.