ENGINEERING DRAFTING TEMPLATE – NON FP03 1 of 5 Updated 3/16/2020 (UPDATED Thru FAC 2005-49)

C-1 STATEMENT OF WORK/SPECIFICATIONS

The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

1. Move room furnishings (tables, desk, refrigerators, lab equipment; items identified during Pre-Bid walk-through) and coordinate with the COR the temporary storage/placement of furnishings while work in each individual room is being accomplished.

2. Remove existing asbestos floor tiling and asbestos containing mastic from:

Base Rooms (Approx. 2100 SF): Rooms 117,128, 206, 208, 211, 215, 216, 301, 304, 306, 310, 311.

Additive Rooms (Approx. 2400 SF): Rooms 118, 123, 124, 125, 126, 129, 202, 203, 207, 302, 303, 305.

See drawings for exact location of work areas.

3. Install Government Furnished new commercial grade Vinyl Composition Tile (matching

VCT) as new floor covering in all areas where asbestos tile was removed. Provide and install new rubber cove base around new VCT flooring. (Approx. 900 LF)

C-2 PROJECT LOCATION

Olympia Forestry Sciences Laboratory

3625 93rd Ave., SW

Olympia, WA 98512

C-3 SPECIFICATIONS

AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA INDEX OF FEDERAL

SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS FPMR

PART 101-29 (FAR 52.211-1) (AUG 1998)

(a) The GSA Index of Federal Specifications, Standards and Commercial Item Description, FPMR

Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to--

GSA Federal Supply Service

Specifications Section, Suite 8100

470 East L'Enfant Plaza SW

Washington, DC 20407

Telephone (202) 619-8925

Facsimile (202) 619-8978.

ENGINEERING DRAFTING TEMPLATE – NON FP03 2 of 5 Updated 3/16/2020

(b) If the General Services Administration, Department of Agriculture, or Department of Veterans

Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (a) of this provision. Additional copies will be issued for a fee.

AVAILABILITY OF SPECIFICATIONS NOT LISTED IN THE GSA INDEX OF

FEDERAL SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM

DESCRIPTIONS

The specifications cited in this solicitation may be obtained from:

Specification Address

ASTM Standards American Society for Testing and Materials

1916 Race Street

Philadelphia, PA 19103

(215) 199-5462

AASHTO Standards American Association of State Highway and

Transportation Officials

341 National Press Building

Washington, D.C. 20024

The request should identify the solicitation number and the specification requested by date, title, and number, as cited in the solicitation.

C-4 SUBMITTALS

Submittals shall include the following unless otherwise required in the specification:

1. Date and revision dates.

2. Project name and contract number.

3. Names of Contractor, subcontractor, supplier, and manufacturer.

4. Specifications section number.

5. Field dimensions and relation to adjacent structures.

6. Applicable standards such as ASTM or Federal Specifications.

7. Contractor's stamp, initial or signature, certifying the review of submittal, verification of field measurements and compliance with contract documents. Provide all submittals within 14 calendar days of contract award unless otherwise required by the specification.

C-5 PRODUCT SAMPLES AND/OR SUBMITTALS

The following product samples and/or submittals are required for this project:

Title Referenced by

Specification No

Time of Government Approval

After Submittal

ENGINEERING DRAFTING TEMPLATE – NON FP03 3 of 5 Updated 3/16/2020

Intial Submittal Report 02 82 13 10 days

Close out Submittal

Report

02 82 13 N/A

Product data- Resilient base

09 65 00 7 days

C-6 SHOP DRAWINGS

The following shop drawings shall be submitted on this project:

Time of Government Approval

None

C-7 MATERIAL CERTIFICATIONS AND TESTING REPORTS

The following material certifications and/or testing reports shall be submitted on this project:

Time of Government Approval

Air Test Results 02 82 13 N/A

GOVERNMENT-FURNISHED PROPERTY

The Government will provide the following item(s) of Government property to the Contractor for use in the performance of this contract. This property shall be used and maintained by the Contractor in accordance with the provisions of the FAR clauses “52.245-1 -- Government Property”, or “52.245-9 --

Use and Charges” as applicable.

Item No. Description Quantity Delivery Date

51810031T270A Armstrong Standard Excelon VCT 3000 SF Upon Request

POTENTIAL SAFETY HAZARDS

(a) Data and information furnished or referred to below is for the Contractor's information. The

Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor. This list shall not be deemed to be all-inclusive. The Contractor shall bear the sole responsibility for taking all appropriate actions necessary to prevent accidents and injuries to individuals at the worksite.

(b) The following checked activities have been identified by the Government as potential safety

ENGINEERING DRAFTING TEMPLATE – NON FP03 4 of 5 Updated 3/16/2020 hazards.

[ ] Confined space entry.

[ ] Temporary excavation/deep trenching/slope stability.

[ ] Tree falling.

[ ] Fall hazard from work heights exceeding six feet.

[ ] Blasting.

[ ] Traffic control on high-volume and/or high-speed and/or limited visibility roads.

[ ] Heavy equipment operation.

[ ] Tree climbing and/or tower climbing.

[ ] Fire hazards.

[x] Hazardous materials handling.

[ ] Electrical hazard.

[ ] Hydraulic and/or pneumatic and/or other high pressure hazards.

[ ] Mechanical hazards such as pulleys, springs, etc.

[ ] Other __________________________________

SALVAGE RIGHTS

No Contractor salvage rights exist under the contract unless specifically provided elsewhere herein.

FINAL CLEANUP

Contractor shall remove and dispose all of its own trash and refuse from the contract area. Material to be removed includes, but is not limited to refuse such as tin cans, aluminum foil, glass, paper, garbage, etc. This Cleanup is a subsidiary item for which no special payment will be made. All debris shall be disposed of off National Forest Land and in accordance with State and Local disposal requirements.

METHODS OF MEASUREMENT

One of the following methods of measurement for determining final payment is DESIGNATED on the

SCHEDULE OF ITEMS for each pay item:

(a) Designed Quantities (DQ). These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units SHOWN in the SCHEDULE OF ITEMS may be authorized under any of the following conditions:

(1) As a result of changes in the work authorized by the Contracting Officer.

(2) As a result of the Contracting Officer determining that errors exist in the original design that cause a pay item quantity to change by 15 percent or more.

(3) As a result of the Contractor submitting to the Contracting Officer a written request showing evidence of errors in the original design that cause a pay item quantity to change by 15 percent or

ENGINEERING DRAFTING TEMPLATE – NON FP03 5 of 5 Updated 3/16/2020 more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.

(b) Staked Quantities (SQ). These quantities are determined from staked measurements prior to construction.

(c) Actual Quantities (AQ). These quantities are determined from measurement of completed work.

(d) Vehicle Quantities (VQ). These quantities are measured or weighed in hauling vehicles.

(e) Lump Sum Quantities (LSQ). These quantities denote one complete unit of work as required by or described in the contract including necessary materials, equipment, and labor to complete the job. They will not be measured.

STATE ELECTRICAL INSPECTION AND COUNTY BUILDING PERMITS

The Contractor shall arrange for and provide the State Electrical inspection. When requesting the inspection inform the Building Permit Department of the federal limitation described below. The

Contractor shall not obtain any building permits or inspections other than the State Electrical inspection.

Federal law validated by the State Attorney General, verify that the Federal Government and its

Contractors may be exempted from State/Local Building Permits and Fees for projects located on

Federal Installations [including all federal lands. Contractor State Licenses will not be jeopardized by following this requirement to avoid the State/County permit system. This applies to the prime

Contractor and all subcontractors.

PUBLIC OFFICIALS NOT PERSONALLY LIABLE

There shall be no personal liability upon the Government or officer in charge, their agents or employees, for any act performed in the discharge of any duty imposed or the exercise of any power or authority conferred upon them by, or within the scope of the contract, it being understood that in all such matters they act solely as agents and representatives of the Government.

PAYMENT FOR PERFORMANCE AND PAYMENT SECURITY EXPENSES

It is mutually agreed that the premium costs for performance bonds, payment bonds and alternative payment protections furnished for this contract are included in the total amount bid for other items and that any payment to the Contractor for the cost of bonds made in accordance with FAR 52.232-5 refers only to corporate sureties listed in the current Department of Treasury Circular 570 and no advance payment will be made for bond premiums where other than corporate surety bonds are furnished. Bond premiums as used in this paragraph and FAR 52.232-5 shall include any Small Business Administration fees paid in connection with SBA guaranteed corporate surety bonds.