Attachment 01 - SOO 33 ARMAG V2.pdf

PDF 125 KB Posted

Attached to
33 RQS/RGS ARMAG IDS Install
Solicitation number
FA527026Q0003
Issued by

About this file

This is a Statement of Objectives (SOO) for the procurement, design, installation, integration, and testing of an Intrusion Detection System (IDS) and supporting network infrastructure for two distinct ARMAGS (Ammunition and Related Magazine Storage structures) located in Building 3672 at Kadena Air Base. The contractor must deliver a fully operational IDS that integrates seamlessly with the existing Vindicator Command and Control system, accounting for technical variances between the two ARMAG sites due to differences in equipment age and structural types.

The performance objectives require the contractor to deliver a comprehensive IDS solution encompassing passive infrared sensors (PIR), barrier management switches (BMS), wireless duress systems, keypads, field panels, and gigabit ethernet infrastructure for each ARMAG, with all field devices mapping and communicating concurrently with the base Vindicator system. The system must maintain continuous operation with battery backup sustaining operations for a minimum of 8 hours during power loss, successfully execute Contractor Verification Tests and full functional tests per the ESE-TP-0023 Master Test and Turnover Plan demonstrating zero percent communication reliability failure rates, and provide a one-year warranty on parts and labor including installation spares and an Operations and Maintenance Manual. The solution must comply with DoDM-5100.76, AFMAN 31-101, UFC 4-021-02, and all cybersecurity mandates, with all IDBSS network termination and programming executed by U.S. persons holding appropriate clearances and Vindicator certifications. The place of performance is Building 3672 at Kadena Air Base, with operations during 0730-1630 Monday through Friday, and the contractor must propose a realistic period of performance and milestone schedule along with their standard commercial holiday observance plan in their technical proposal.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Courtesy of LOGCOM, MCLC Albany

CUI

STATEMENT OF OBJECTIVES (SOO)

I. Purpose: The purpose of this acquisition is to procure, design, install, integrate, and test a compliant Intrusion Detection System (IDS) and support network infrastructure for two (2) distinct ARMAGS located in the Building 3672 maintenance hangar.

II. Scope or Mission: The contractor shall provide a comprehensive IDS solution that integrates seamlessly with the existing Vindicator Command and Control system.

Due to variances in equipment age and structural types between the two sites, the contractor must provide site-specific installations that satisfy the separate requirements of the respective squadrons and comply with DoDM-5100.76 and

AFMAN 31-101.

III. Period and Place of Performance:

1. Place of Performance: Building 3672, Kadena Air Base.

2. Period of Performance (PoP): The contractor shall propose a realistic PoP and milestone schedule in their technical proposal for Government evaluation.

3. Hours of Operation: 0730 - 1630, Monday through Friday.

4. Holiday Observance: The contractor shall propose their standard commercial holiday observance schedule (inclusive of U.S. Federal Holidays, Japanese Public Holidays, or a combination thereof) in their proposal.

IV. Background: The 33RQS and 33RGS currently store their small arms in a non-climate controlled secure area which is unsustainable for long-term maintenance of assets. This drives installation of ARMAGS in building 3672, one for each squadron, to cut alert response times and ease maintenance burdens with climate-controlled storage. For weapons storage, the Department of the Air Force requires continuous IDS protection for SRC II arms storage structures (bulk and unit level).

The current infrastructure at Building 3672 requires new field equipment, sensors, and network integration to correlate with Kadena AB's existing Vindicator schemes and map displays. This project involves two ARMAGS with differing technical baselines due to their age and model type. Consequently, the squadrons utilizing these structures will have separate technical requirements to get them to the same operational status. The contractor must account for these technical variances to allow for two independent ARMAGS being fully correlated into the Vindicator map displays.

V. Performance Objectives: The contractor shall propose a technical approach to achieve the following outcomes:

1. System Integration & Functionality: Deliver a fully operational IDS encompassing required sensors (PIR, BMS, wireless duress), keypads, field panels, and gigabit ethernet infrastructure for each ARMAG. All field devices must concurrently map and communicate with the base Vindicator system.

Courtesy of LOGCOM, MCLC Albany

2. Power Resilience: Ensure the IDS operates continuously with battery backup capable of sustaining the system for a minimum of 8 hours during power loss.

3. Testing & Validation: Successfully execute a Contractor Verification Test (CVT) and a full functional test for each site in strict accordance with the ESE-TP- 0023 Master Test and Turnover Plan. The system must demonstrate a 0% failure rate in communication reliability across all installed equipment prior to Government acceptance.

4. Sustainment & Warranty: Provide a one-year warranty on parts and labor, including delivery of unused installation spares to the 18th Security Forces Squadron (SFS) Noncommissioned Officer in Charge (NCOIC) of Electronic Security Systems (ESS). The contractor shall provide an Operations and Maintenance Manual for unit operation and self-sustainment.

5. Regulatory Performance Standards: The systems must meet all operational metrics and baseline performance standards mandated for IDS as outlined in DoDM-5100.76, AFMAN 31-101, and UFC 4-021-02.

VI. Operating Constraints: The contractor's approach must comply with the following mandatory constraints:

1. Personnel Security: All termination and programming of the Integrated Base Defense Security System (IDBSS) network must be executed by U.S. persons holding appropriate clearances and Vindicator certifications as specified in the following regulations.

2. Regulatory Compliance: The solution must adhere strictly to DoDM 5100.76, AFMAN 31-101, UFC 4-021-02, ESE-TP-0023, and all cybersecurity mandates (DoDI 8510.01, DoDI 8500.01).

3. Site Management: The contractor must maintain emergency egress routes during installation, remove all rubbish daily to off-base locations, and manage all hazardous materials IAW DOD 4160.21-M.

4. Equipment Baseline: Proposed equipment must be selected from the approved Non-Nuclear IDS Equipment List (CMD) or pass rigorous government acceptance testing if non-CMD Commercial Off-the-Shelf (COTS) equipment is proposed.

5. Government Furnished Support (GFP/GFI/GFS): The Government will provide the following to facilitate performance:

• Utilities: Reasonable access to electrical power and water.

• Documentation: Floor plans, legacy as-built drawings, and sensor schematics, if available.

• Network Data: Required IP addresses, topology data, and switch port assignments for Vindicator integration.

• Logistics & Security: Required facility escorts if required, and a designated material staging area.

STATEMENT OF OBJECTIVES (SOO)