Attachment 01 SOI NFNC Croatan Office.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Croatan Ranger Construction Federal contract opportunity
- Solicitation number
- 12445224R0029
- Issued by
- Department of Agriculture Forest Service
About this file
This document is a Schedule of Items (SOI) for the Croatan Ranger Station and Helipads construction project. The SOI details the various work items required, including site preparation, utilities construction, building construction, landscaping, and other ancillary work. The items are divided into base bid and option items, with quantities and estimated costs provided for each.
The related federal contract opportunity is for the Croatan Ranger Construction project, solicitation number 12445224R0029. The work consists of site preparation, access road construction, utilities, a 6,600 square foot ranger station, fencing, and two helipads at the Croatan Ranger District in New Bern, North Carolina. A site visit is scheduled for July 23, 2024, and all questions are due by July 25, 2024. The solicitation is being issued by the Department of Agriculture Forest Service.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOI
| SCHEDULE OF ITEMS: CROATAN RANGER STATION AND HELIPADS | ||||||
| ITEM | DESCRIPTION | UNIT | QTY | BASE BID COST | OPTION BID COST | |
| 1 | SITE PREPARATION | |||||
| 1-A | RANGER STATION SITE: STUMP AND DEBRIS REMOVAL, TOPSOIL STOCKPILING, SHAPE FOR POSITIVE DRAINAGE. | ACRE | 3 | |||
| 1-B | SITE LOADING AND COMPACTION TESTING AND CERTIFICATION, CLEANUP TO GRADE | LS | 1 | |||
| 1-C | HELIBASE LOT PREPARATION CLEAR GRUB GRADE TO DESIGN ELEVATIONS | ACRE | 8 | |||
| 1-D | CULVERT INSTALLATION FOR HELIPAD ACCESS ROAD | EA | 1 | |||
| 1-E | HELIPADS ACCESS ROAD AND PADS SUB BASE FILL | CY | 11110 | |||
| 1-F | HELIPADS ACCESS ROAD AND PADS BASE-HD ASPHALT FINISH | LS | 1 | |||
| 1-G | TWO HELIPADS CONCRETE CONSTRUCTION, LIGHTING INSTALLATION, STATIC GROUNDS, TIE DOWNS, PAINTING AND FINISHING, MISC. APPURTENANCES | LS | 1 | |||
| 1-H | HELIBASE LOT FENCING (NEW) | LF | 1685 | |||
| 1-I | HELIBASE FENCING UPGRADE | LF | 1910 | |||
| 1-J | EROSION CONTROL RANGER STATION SITE | ACRE | 3 | |||
| 1-K | EROSION CONTROL HELIBASE LOT | ACRE | 8 | |||
| ITEM 1 - SITE PREPARATION - BASE ITEMS SUBTOTAL COST | ||||||
| ITEM 1 - SITE PREPARATION - OPTION ITEMS SUBTOTAL COST | ||||||
| 2 | UTILITIES | |||||
| 2-A | WATERMAIN 1-1/2 IRRIGATION LINE | LF | 575 | |||
| 2-B | WATERMAIN 1-1/2 DOMESTIC LINE | LF | 688 | |||
| 2-C | WATERMAIN 2" IRRIGATION LINE | LF | 1361 | |||
| 2-D | WATERMAIN 2" DOMESTIC LINE | LF | 539 | |||
| 2-E | WATERMAIN 6" FIRE SERVICE LINE | LF | 490 | |||
| 2-F | SEWER 2" FORCEMAIN | LF | 345 | |||
| 2-G | SEWER 6" GRAVITY LINE | LF | 178 | |||
| 2-H | SEWER STEP TANK AND PUMP | EA | 2 | |||
| 2-I | ELECTRICAL UNDERGROUND CONDUITS AND WIRE AS SPECIFIED | LF | 903 | |||
| 2-J | ELECTRIC CONNECTIONS FOR GATE CONTROL, OUTDOOR LIGHTING, GENERATOR CONTROL, AND MISC OUTDOOR EQUIPMENT | LS | 1 | |||
| 2-J | FIBRE OPTIC CONNECTION TO WORK CENTER TERMINATIONS IN RACKS | LF | 1910 | |||
| ITEM 2 - UTILITIES - BASE ITEMS SUBTOTAL COST | ||||||
| ITEM 2 - UTILITIES - OPTION ITEMS SUBTOTAL COST | ||||||
| 3 | FOUNDATION (BASE PREP AND DRAINS INCLUDED) | LS | 1 | |||
| 4 | FRAMING | LS | 1 | |||
| 5 | EXTERIOR FINISHES | |||||
| 5-A | EXTERIOR BRICK, BLOCK, PAVING | SF | 2774 | |||
| 5-B | EXTERIOR DOORS AND WINDOWS | LS | 1 | |||
| 5-C | SIDING AND EXTERIOR TRIM | LS | 1 | |||
| 5-D | PAINT (ALL EXT AS SPECIFIED) | LS | 1 | |||
| 5-E | GUTTERS AND DOWNSPOUTS | LS | 1 | |||
| 5-F | ROOF SYSTEM COMPLETE (RIDGID INSULATION INCLUDED ETC) | SF | 10351 | |||
| ITEM 5 - EXTERIOR REPAIRS - BASE ITEMS SUBTOTAL COST | ||||||
| ITEM 5 - EXTERIOR REPAIRS - OPTION ITEMS TOTAL COST | ||||||
| 6 | BACKFILL, FINISH GRADE, TEMPORARY STABILIZATION | LS | 1 | |||
| 7 | ELECTRICAL ROUGH-IN | LS | 1 | |||
| 8 | PLUMBING ROUGH-IN | LS | 1 | |||
| 9 | HVAC ROUGH-IN | LS | 1 | |||
| 10 | LOW-VOLTAGE CABLING ROUGH-IN | LS | 1 | |||
| 11 | INSULATION | SF | 14960 | |||
| 12 | INTERIOR FINISHES | |||||
| 12-A | WALL AND CEILING FINISHES | LS | 1 | |||
| 12-B | INTERIOR PAINT | LS | 1 | |||
| 12-C | INTERIOR DOORS AND HARDWARE | LS | 1 | |||
| 12-D | TRIM AND MILLWORK INSTALLATION, MISC FINISHES AND EQUIPMENT | LS | 1 | |||
| 12-E | ELECTRICAL TRIM | LS | 1 | |||
| 12-F | PLUMBING TRIM | LS | 1 | |||
| 12-G | HVAC TRIM | LS | 1 | |||
| 12-H | LOW-VOLTAGE TRIM | LS | 1 | |||
| 12-I | FLOORING FINISHES AND BASE TRIM | LS | 1 | |||
| ITEM 12 - INTERIOR FINISHES - BASE ITEMS SUBTOTAL COST | ||||||
| ITEM 12 - INTERIOR FINISHES - OPTION ITEMSSUB TOTAL COST | ||||||
| 13 | DRIVEWAY AND PARKING LOT CONSTRUCTION | |||||
| 13-A | BASE INSTALLATION AND FINISH GRADING, PAVING, STRIPING, LOT FINISHING | LS | 1 | |||
| 13-B | GATE | EA | 1 | |||
| 13-C | SITE SIGNS | LS | 1 | |||
| ITEM 13-DRIVEWAY AND PARKING LOT CONSTRUCTION - BASE ITEMS SUBTOTAL COST | ||||||
| ITEM 13-DRIVEWAY AND PARKING LOT CONSTRUCTION - OPTION ITEMS SUBTOTAL COST | ||||||
| 14 | LANDSCAPING | |||||
| 14-A | TREE PLANTING | EA | 75 | |||
| 14-B | TREE TRANSPLANT | EA | 2 | |||
| 14-C | SHRUB PLANTING | EA | 163 | |||
| 14-D | GROUND COVERS PLANTING: BERMUDA SOD, BERMUDA SEED, WIRE GRASS, MUHLY GRASS AND HARD GRASS | SF | 456410 | |||
| 14-E | NATIVE GRASSES PLANTING | SF | 131414 | |||
| 14-F | TEMPORARY IRRIGATION INSTALLATION | LS | 1 | |||
| 14-G | TRAIL CONSTRUCTION (GRADING AND CONCRETE) | SF | 1950 | |||
| 14-H | WALL KIOSK | EA | 1 | |||
| 14-I | INFORMATION SIGN | EA | 1 | |||
| 14-J | BOG PLANTERS | EA | 2 | |||
| 14-K | CONCRETE SIDE WALKS, RAMP, STEPS, FLAGPOLE, INCIDENTAL CONCRETE | LS | 1 | |||
| ITEM 14 - LANDSCAPING - BASE ITEMS SUBTOTAL COST | ||||||
| ITEM 14 - LANDSCAPING - OPTION ITEMS SUBTOTAL COST |
| BASE ITEMS TOTAL COST | $0.00 | |
| OPTION ITEMS TOTAL COST | $0.00 | |
| BASE + OPTION ITEMS TOTAL COST OF CONSTRUCTION | $0.00 |