This document is a Performance Work Statement (PWS) for a non-personal service contract to provide concrete transportation and disposal services at Fort Meade Army Base in Maryland. The objective is to transport approximately 40,000 pounds of steel-reinforced concrete slabs, measuring 9 feet wide by 11 feet long with thicknesses ranging from 12 to 30 inches, from the Tobyhanna Army Depot to a disposal site. The contractor shall provide flatbed trailers and personnel to load, transport, and offload the concrete. The period of performance is expected to be 1-5 days between October 1-31, 2024, with 48 hours' notice to the contractor. The contractor is responsible for all costs associated with the transportation and disposal of the concrete. This PWS is attached to a related federal contract opportunity, Solicitation Number W51AA1-24-Q-0109, issued by the Department of the Army for these concrete removal and disposal services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers.xlsx | XLSX spreadsheet | |
| SF1449 RFQ W51AA1-24-Q-0109.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
Concrete Removal and Disposal Services Fort Meade Army Base, MD
PART 1
GENERAL INFORMATION
1. General: This is a non-personal service(s) contract under which the personnel rendering the service(s) are not subject, either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees.
1.1 Description of Services/Introduction: This is a non-personal service(s) contract to provide concrete transportation and disposal services.
1.2 Background: Tobyhanna Army Depot (TYAD) has been tasked with the de-installation and removal of an AN/FSC-78 Satellite Antenna located on Fort Meade Army Base, Maryland.
1.3 Objectives: The objective of this contract is to provide:
One (1) or more flatbed trailer(s) of the appropriate size/capacity to transport up to 40,000 pounds of steel reinforced concrete slabs, approximately 9 Feet Wide x 11 Feet Long. The thickness of the slabs will range between 12 and 30 inches.
Key Personnel to operate the trailer(s) and transport and off-load the concrete at disposal site
1.4 Scope: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items necessary to perform the non-personal services as described in the PWS and associated contract documents, except for those items specified in Part 3 Government Property and Services. The Contractor shall perform to the standards and acceptable quality levels identified in this PWS and associated contract documents.
1.4.1 Period of Performance (POP): The total duration of performance by the contractor is expected to be one (1) to five (5) days, (approximately), depending on how many trailers the contractor has available for this service. The exact performance is tentatively scheduled between 01-October-2024 and 31-October-2024. Within the this range, the Government will give the Contractor a notification of no less than 48 hours from once the exact date is known for required services.
1.5 General Information:
1.5.1 Quality Control Plan (QCP): The Contractor’s existing quality assurance system shall be utilized in accordance with (IAW) Federal Acquisition Regulation (FAR) Part 12.208.
1.5.2 Quality Assurance: Inspection and acceptance will be IAW FAR clause 52.212-4(a).
1.5.3 Hours of Operation/Contractor Performance Hours: The Contractor is responsible for conducting business between the hours of 0800 to 1700, Monday through Friday, excluding Federal Holidays, (part 1.5.3.2 of this PWS), and when the Government facility is closed due to local or national emergencies, or similar Government directed facility closings. The Contractor must, at all times, maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons.
When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.5.3.1 Recognized Holidays: The following provides information on recognized holidays for the purpose of the PWS. If submittal of any documentation (e.g. deliverables, submittals, etc.) deadlines fall on a holiday, the closest workday prior to the holiday will apply as the deadline for submittal.
1.5.3.2 U.S. Holidays: Work shall not be performed on U.S. federally recognized holidays occurring during the normal workweek unless otherwise directed by the Contracting Officer. When a U.S. holiday occurs on a Saturday or Sunday, the holiday is observed on the preceding Friday or following Monday, respectively.
New Year’s Day M.L. King Memorial Day Presidents’ Day
Memorial Day Juneteenth Independence Day
Labor Day Columbus Day Veteran’s Day
Thanksgiving Day Christmas Day
1.5.4 Place of Performance: The work to be performed under this contract will be performed at the following Government facility: SATCOM, ATTN: WTN Removal, 8901 Love Road, Fort Meade, MD 20755.
1.6 Security Requirements: The following information is provided on security related matters.
1.6.1 Security Program: Contractor personnel performing work under this contract are not required to possess a security clearance.
1.6.2 Installation Access: Access to U.S. installations, buildings and controlled areas is limited to personnel who meet security criteria and are authorized. Failure to submit required information/data and obtain required documentation or clearances will be grounds for denying access to U.S. installations, buildings and controlled areas.
The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements.
The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.
The Contractor shall return installation passes to the issuing IACS office IAW the installation’s instruction.
Contractor and all associated sub‐contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC‐III) and Terrorist Screening Database (Army Directive 2014‐05/AR 190‐13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative); or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.6.2.1 Installation Pass Log: In addition, the Contractor shall provide the Contracting Officer, via the COR, an Initial Installation Pass Log for any/all contractor personnel entering onto Fort Meade and the Fort Meade SATCOM facility– not less than 2 business days in advance of their arrival at Fort Meade.
The log must, at a minimum, contain the following information:
Last Name, First Name, Middle Initial (if any), Name Suffix (if any), Social Security Number, Date of Birth including year, Citizenship, and Place of Birth – City and State.
The log shall be updated as employees are added or removed. The Updated Installation Pass Log shall be current and available at any time upon request by the Government and submitted to the COR within five (5) calendar days after any changes to the log.
The COR will provide this information directly to the security personnel at Fort Meade, MD, and at the SATCOM facility on Fort Meade who may use it to conduct a criminal background check. The COR will not maintain copies of this information after it has been provided to the security personnel.
1.6.2.2 Individual Termination or Expiration of Employment: The Contractor shall collect the installation access passes the same day employment of an individual has expired or has been terminated and shall return them to the issuing office IAW the applicable policies and procedures of the installation.
1.6.2.3 Contract Termination or Cancellation: Upon termination or cancellation of this contract, the Contractor shall collect all outstanding installation access passes and return them to the issuing office IAW the applicable policies and procedures of the installation.
1.6.3 Physical Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured IAW the Army Physical Security Program AR 190-13.
1.6.4 Operations Security (OPSEC) Requirements: Contractor personnel shall adhere to facility security policies and restrictions. The Contractor shall immediately report suspicious activities to security personnel.
1.6.5 AT Level 1 Training: All contractor employees, to include subcontractor employees, requiring access to Army Installations, facilities, and controlled access areas shall complete AT Level 1 Awareness training within 30 calendar days after the contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer, if a COR is not assigned, within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I Awareness training is available at the following website: https://jkodirect.jten.mil/ for CAC holders. Non-CAC holders may go to:
http://jko.jten.mil/courses.atl1/launch.html
1.7 Key Control: Not Applicable
1.8 Post Award Conference/Periodic Progress Meetings: The Contractor shall attend any post award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The Contracting Officer, COR, and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor’s performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the Contractor’s performance and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues.
These meetings shall be at no additional cost to the Government.
1.8.1 The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Contract Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter. Meetings may start or end outside of regular duty hours.
1.9 Contracting Officer’s Representative (COR): Refer to Part 2 of this PWS for the definition of a COR. As determined by the Contracting Officer, a COR will be appointed and identified by letter of designation, a copy of which will be provided to the Contractor by the Contracting Officer. The designation letter states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order. The COR monitors all technical aspects of the contract and assists in contract administration. The COR is not authorized to obligate the Government. If the work is not written in the contract, the COR is not authorized to request new work.
The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract, perform inspections necessary in connection with contract performance, maintain written and oral communications with the Contractor concerning technical aspects of the contract, issue written interpretations of technical requirements, including Government drawings, designs, specifications, monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies, coordinate availability of Government property, and coordinate site entry of Contractor personnel.
1.10 Key Personnel: The Contractor shall provide a Main Point of Contact (POC), (i.e.: Program or Contract Manager, Project Leader, etc.), who shall be responsible for the performance of the work. This POC shall have full authority to act for the Contractor on all contract matters relating to daily operation of this contract. An Alternate POC shall also be provided who shall have the same authority to act for the Contractor when the Main POC is absent or unavailable. The Contractor’s POC or Alternate POC shall be available as described in part 1.5.3 of this
PWS.
1.11 Identification of Contractor Employees: All Contractor personnel attending meetings, answering Government telephones, and working in other situations where their Contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. The Contractor shall ensure that all documents or reports, produced by contractors are suitably marked as Contractor products or that Contractor participation is appropriately disclosed.
Contractor personnel will be required to obtain and wear badges in the performance of this contract.
1.12 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.13 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.14 Phase In / Phase Out Period: Not Applicable
1.15 Safety: In performing work under this contract, the Contractor shall:
a. Conform to the safety requirements contained in the contract for all activities related to the accomplishment of the work.
b. Develop and provide at the start of the orientation period or the start of the first operational performance period (if there is no orientation period) a safety plan for the protection of government facilities and property and to provide a safe work environment for contractor personnel.
c. Provide protection to government property to prevent damage during the period of time the property is under the control or in possession of the contractor.
d. Include a clause in all subcontracts to require subcontractors to comply with the safety provisions of this contract as applicable.
e. Record and report promptly (within one hour) to the contracting officer or designate government representative (GR), all available facts relating to each instance of damage to government property or injury to either contractor or government personnel.
f. In the event of an accident/mishap, take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident/mishap investigative authority through the CO.
g. If the government elects to conduct an investigation of the accident/mishap, the contractor shall cooperate fully and assist government personnel in the conduct of investigation until the investigation is completed.
h. Include a clause in each applicable subcontract requiring the subcontractor's cooperation and assistance in accident reporting and investigation.
1.16 Environmental Compliance: Contractor will comply with all Federal and Local environmental compliance requirements.
1.16.1 Environmental Compliance Plan and Program: The Environmental Compliance Plan (ECP) has been created specifically for the Tobyhanna Army Depot (TYAD), Modernization of Enterprise Terminal (MET) antenna installation and de-installation procedures. The MET projects executed by TYAD are minimally invasive in that there is typically no disturbance of earth, modification of existing stormwater features, or use of any procedures that have the potential to cause air pollution. Throughout the installation and de-installation processes work crews will utilize hand tools, battery operated tools, corded power tools, gas powered saws and generators, welding equipment, and oxyacetylene torches. All tools are to be utilized in accordance with manufacturer’s specifications. Torch cutting will be performed in accordance with site specific requirements for burn permits, fire watch, etc. Power generating equipment may either be diesel or gasoline fueled. When powered equipment of this nature is utilized, no more than 5 gallons of fuel will be stored onsite (separate from the equipment’s onboard tank) in order to minimize spill potential. In the event of a spill, the site specific POC will be notified immediately in addition to any onsite emergency personnel. The appropriate names and methods of contact (phone numbers/email addresses) will be determined for each site prior to deployment and will be posted in the job trailer onsite.
Typical construction chemicals such as WD-40, Loctite, Anti-seize, etc. are used in limited quantities (1 gallon or less) for projects of this nature. When limited quantities of these typical construction items are present, special environmental regulations are not required. Site surveys are performed prior to installation/de-installation in which environmentally sensitive areas such as storm water inlets, drainage swales, etc. are located. In the event these items are located in close proximity to our work areas specialized precautions will be utilized to prevent any jobsite runoff from entering these elements. TYAD may perform (in concert with site specific authority having jurisdiction) diking, damming, and filtering accordingly to maintain appropriate level of protection as deemed necessary on a site-specific basis.
PART 2
DEFINITIONS & ACRONYMS
2. Definitions and Acronyms:
2.1 Definitions:
Contractor - A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
Contracting Officer - A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
Defective Service - A service output that does not meet the standard of performance associated with the Performance Work Statement.
Deliverable - Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
Key Personnel - Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
Physical Security - Actions that prevent the loss or damage of Government property.
Quality Assurance - The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
Quality Control - All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Subcontractor - One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
Workday - The number of hours per day the Contractor provides services in accordance with the contract.
Work Week - Monday through Friday, unless specified otherwise.
2.2 Acronyms:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest OCONU Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QC Quality Control QCP Quality Control Program TE Technical Exhibit
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. Government Furnished Items and Services: The Government will not provide any equipment to the Contractor for performance of this contract.
3.1 Services: A crane with operator and TYAD riggers and signalman will be provided to load the concrete slabs onto the Contractor’s flatbed trailer(s).
3.2 Facilities: Not Applicable
3.3 Utilities: Not Applicable
3.4 Equipment: Not Applicable
3.5 Materials: Not Applicable
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. Contractor Furnished Items and Responsibilities:
4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Part 5 of this PWS.
4.2 Secret Facility Clearance: Not Applicable
4.3 Materials: Not Applicable
PART 5
SPECIFIC TASKS
5.1 Basic Services: The Contractor shall provide services for:
(a) At the request of Tobyhanna Army Depot Site Lead with no less than a 48 hour notice the contractor will provide flatbed trailers or one trailer making multiple trips capable of transporting steel reinforced concrete slabs approximately 9 feet wide x 11 feet long. The thickness of the slabs will range between 12 and 30 inches. There will be 8 trailer loads with a weight of up to 40,000 pounds per load.
(b) Contractor will be responsible for all concrete once loaded onto the flatbeds. This includes securing concrete to the flatbed trailer, transporting to disposal area and offloading at the disposal area.
(c) The contractor will be responsible for all costs and fees associated with the transportation and disposal of the concrete.
5.2 Recurring Services: Not Applicable
5.3 On-Demand Services: Not Applicable
5.4 Functional Areas: Not Applicable
5.5 Task Heading: Not Applicable
PART 6
APPLICABLE PUBLICATIONS
6. Applicable Publications (Current Editions): Not Applicable
6.1 Contractor Adherence: The contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
PART 7
TECHNICAL EXHIBIT
7. Technical Exhibit: Below are an example of the concrete slabs.