Attachment 01 - Bridge Mobile Crane PWS - Bldg 812.pdf
PDF 190 KB Posted
- Attached to
- Bridge Crane Testing for DLA Distribution Oklahoma DDOO Federal contract opportunity
- Solicitation number
- SP330025Q0199
- Issued by
- Defense Logistics Agency Distribution
About this file
This Performance Work Statement (PWS) details preventative and corrective maintenance requirements for bridge and mobile crane equipment at DLA Distribution Oklahoma City located at Tinker Air Force Base. The contract requires quarterly inspections and annual load testing for four specific pieces of equipment: one 10-ton bridge crane, one 15-ton Grove carrier deck mobile crane, one 5-ton gantry crane, and one rudder sling. Specific inspection and testing requirements include visual and operational assessments, load testing at specified percentages of rated capacity, lubrication, documentation of findings, and certification of compliance with OSHA, ASME, ANSI, and DoD safety standards.
The contractor must provide all labor, tools, equipment, and personnel to perform preventative maintenance (PM) and corrective maintenance (CM) services. Key requirements include developing a sustainment plan, responding to service calls within 24 hours, maintaining detailed documentation of work performed, and ensuring continuous equipment operation. The work will be performed at DLA Distribution Oklahoma City, Tinker Air Force Base, with specific equipment locations to be coordinated after contract award. The solicitation is a 100% Small Business Set-Aside under NAICS code 811310, with the government intending to award a single hybrid firm fixed price with time and materials purchase order.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Tab 11 - CSS SP330025Q0199.doc | DOC document | |
| Attachment 02 - Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS) for PREVENTATIVE and CORRECTIVE MAINTENANCE: BRIDGE and MOBILE CRANE INSPECTION, LIFTING EQUIPMENT
INSPECTION, LOAD TEST, AND RUDDER SLING PULL TEST FOR DLA DISTRIBUTION
OKLAHOMA CITY-TINKER AIR FORCE BASE
1.0 Scope
This Performance Work Statement (PWS) outlines requirements for preventative and corrective maintenance, repair, periodic inspections, load testing and certification services for Bridge and Mobile Crane – Automated Material Handling and Material Handling Equipment operated by DLA Distribution Oklahoma City (DDOO) at Tinker Air Force Base, Oklahoma. The objective is to ensure safe and compliant operation of cranes and lifting devices in accordance with OSHA, ASME, ANSI, and DoD standards.
2.0 Scope of Work
The contractor shall provide all labor, tools, equipment, materials, transportation, and supervision necessary to perform: DLA DDOO will provide the MHE Support to assist with the contractor’s inspections.
• Quarterly Inspections of one (1) 10-ton bridge crane.
• Annual load tests for the following equipment:
• One (1) 10-ton bridge crane
• One (1) 15-ton Grove carrier deck mobile crane
• One (1) 5-ton gantry crane
• One (1) rudder sling pull test at 875lbs
2.1. All work should be performed in accordance with the latest applicable federal state and local regulations including but not limited to OSHA 29 CFR 1910.179, ASME B30 series, and relevant DoD and Air Force safety directives.
2.2. Quarterly Crane Inspection
• Equipment: One (1) 10-Ton Bridge Crane
2.3 Frequency: Quarterly (every 3 months)
Requirements - Visual and operational inspection of all crane components including hoist, wire rope, trolley bridge, control systems, end stops, brakes, and electrical components.
• Lubrication of all moving parts as needed
• Identification of any wear, damage, or noncompliance.
• Documentation of findings and recommendations
• Immediate reporting of any critical safety issues.
2.4 Annual Load Testing
Equipment and Testing Requirements:
• One (1) 10-ton Bridge Crane- Load testing at 125% of rated capacity (12.5 tons) per OSHA/ASME standards. Use of certified test weights or equivalent method. Full functional test under load. Documentation of results and certification of load test.
• One (1) 15-ton Grove Carrier Deck Mobile Crane- Load testing at 110% of rated capacity (16.5 tons) per ASME B30.5. Verification of all safety and operational systems. Functional testing includes boom extension, swing, lift, and outrigger deployment under load. Certification of load test results.
• One (1) 5-ton Gantry Crane- Perform load test with 6250 lbs. Verify hoisting, lowering, trolley, and bridge motion under load. Inspect mechanical, structural, and safety components during and after tests. Documentation of load test certification with serial numbers and inspection notes.
2.5 Annual Sling Pull Test
• Equipment: Rudder Bar/Sling x 2
2.6 Test requirement:
• Pull test at 875lbs
• Visual inspection and load verification
• Documentation of sling condition and test results
• Certification of compliance with applicable safety rigging standards
3.0 Task – Operations, Sustainment and Maintenance
• The Government’s overall functional and technical requirements for operational sustainment and maintenance support for Bridge and Mobile Crane are listed in this section. The Government’s specific technical requirements include by providing the requirements IAW Federal, State, Local, DoD, and DLA policies, procedures, and statues.
• The Contractor shall provide operations, sustainment, and maintenance support including mechanical Preventative Maintenance (PM), Corrective Maintenance (CM), and technical services and support. Specifically, the Contractor shall provide the personnel, equipment, replacement spares, mechanical hardware including for a fully operational AMHS and MHE equipment, but not limited to the inspection, maintenance, services.
o Preventative Maintenance (PM) includes a recurring set of scheduled services and actions which the Contractor shall provide to keep the equipment fully operational and compliant o Corrective Maintenance (CM) is the non-recurring unscheduled repairs or services required to make the equipment fully operational.
3.1 Sustainment
• The Contractor shall develop and implement a Sustainment Plan for all equipment IAW with the original equipment manufacturer and/or Federal/DoD/DLA policies and procedures. The Sustainment Plan includes quarterly inspections, repair, and replacement. The Contractor shall provide the Sustainment Plan which includes the quarterly inspections, and annual load tests for the equipment, the PM schedule and CM approach to the COR for approval.
• The CM approach should include:
o Certifications of testing equipment and other pertinent information are needed to quickly diagnose and make repairs.
o Plans and documentation for equipment testing and/or diagnoses o Identify critical equipment operations and implement strategies to prevent potential failures or equipment downtime from creating a critical work stoppage.
o Plan to respond to take corrective action to resolve the problem/mechanical emergency repairs by the Contractor or the Government during normal duty hours.
3.2 Preventative Maintenance/ Annual Load Testing, and Quarterly Inspections
• The Contractor shall perform Preventative Maintenance (PM) services on all equipment which includes, but is not limited to inspection, positioning, testing, cleaning, lubrication, adjustment, and calibration to verify proper equipment operations. The Contractor shall minimize malfunctions, breakdowns, and deterioration of equipment following industry, Original Equipment Manufacturer (OEM) and Government best practices. The Contractor shall perform PM in accordance with agreed upon schedule. The Contractor shall submit and keep up to date a schedule for all PM tasks.
Any modifications, changes, add-ons, or deletions shall be submitted to the COR for approval and once approved and implemented and provided to the site.
o The Contractor will provide an Annual and Quarterly Preventative Maintenance (PM) Schedule and within five (5) days of exercised Option Year dates each calendar year and perform PM IAW to approved schedule.
o All replacement parts, materials, environmental compliance, and Contractor personnel transportation used for PM shall be included in the contract unit price for PM services.
3.3. Corrective Maintenance (CM) – Service Call(s) Work
• Service Calls Requirements and Procedures – Service calls are defined as emergent maintenance and repair work requirements which are identified by building occupants. The Contractor shall perform service work as necessary to determine the cause of system and equipment malfunctions, eliminate the cause(s), and restore the equipment to working condition.
• Service Calls Requests – The On-Site Representative will advise the Contractor by phone or email of all service requests received during and after regular working hours. A description of the problem or requested work, date and time received, location and other appropriate information will be placed on the ticket.
• Service Calls Responses – The Contractor shall have adequate procedures for receiving and responding to service calls during the Duty Day. A telephone number shall be provided by the contractor for receipt of all service calls. All telephone calls shall be answered within 30 minutes by an individual familiar with the Contractor’s work, control procedures, and the terms and conditions of this contact. Service calls shall be considered received by the Contractor at the time and date the telephone call is placed, or email sent. The Contractor shall respond immediately and must be on the job site and working within 24 (24) hours after receipt of a service call. The Contractor shall work continuously without interruption and shall resolve the issue before departing the job site.
• Completed Service Calls – Within one (1) working day after completion of each service call, the Contractor shall add the following information to the work authorization form and return to the Budget Resource Officer o Description of work completed.
o Brief description of material and parts used, including quantities.
o Date and Time work began o Dat and time work was completed o Hours of labor (by trade) expended.
o Signature or initials of the Contractor’s craftsman performing the work (or supervisor) indicating that the work has been completed.
3.4 Service Calls Materials and Equipment
• The Contractor shall have access to the equipment necessary to support service call work requirements. Lack of availability of equipment shall not relieve the Contractor from the requirement to complete service call work within the time limits specified above. Replacement parts are required in the performance of CM shall be invoiced to the Government IAW the terms and conditions of the contract (FAR52.212-4 Alternate I).
3.5 General Acceptance Criteria
• General quality measures, as set forth below, will be applied to each work product received from the Contractor under the resultant task order. These performances are defined as:
o Quality o Accuracy – Work products shall be accurate in presentation, technical content, and adherence to accepted elements of style o Clarity – Work products shall be clear and concise. Any/all information shall be easy to understand and be relevant to the supporting narrative.
o Consistency to Requirements – All work products must satisfy the requirements of this Performance Work Statement (PWS).
o Format – Work products shall be submitted in hard copy (where applicable) mutually agreed upon prior to submission. Hard copy formats shall follow any specified Directives or Manuals.
o Timeliness o Work products shall be submitted on or before the due dates determined/specified between the Contractor or submitted IAW a later scheduled date determined by the Government.
4.0 Quality Control Plan (QCP)?
• The Contractor shall submit a QCP within ten (10) business days of contract start date to the COR. This plan shall describe the Contractor’s methodology of compliance with the Deliverables and Performance Requirements Summary outlined above. The COR will notify the Contractor of concurrence or required modifications to the QCP within ten (10) business days of receipt. The Contractor shall make appropriate modifications within five (5) business days of the COR’s notification and provide a revised QCP within five (5) business days.
5.0 Safety and Standards
• The Contractor shall be responsible for compliance with all local, state, and federal laws and codes
• The Contractor shall follow all safety regulations, industry standards and practices
• The Contractor shall always be responsible for and maintain a safe and clean work area. The
Contractor shall remove all refuse and trash daily and ensure not to block and fire egress walkways.
6.0 Location of Services
• All services shall be performed at:
o DLA Distribution Oklahoma City, Tinker Air Force Base, Oklahoma 73145
• Specific equipment locations within the base will be coordinated upon contract award.
7.0. Compliance and Standards
• OSHA 1910.179- Overhead and Gantry Cranes
• ASME B30.2- Overhead Gantry Cranes
• ASME B30.5- Mobile and locomotive Cranes
• CMAA Specification No. 70-overhead crane Inspection
• DLA and Tinker AFB Safety Requirements
• OEM Manuals for each crane
| 2.1. All work should be performed in accordance with the latest applicable federal state and local regulations including but not limited to OSHA 29 CFR 1910.179, ASME B30 series, and relevant DoD and Air Force safety directives. |
| 2.3 Frequency: Quarterly (every 3 months) |
| 2.4 Annual Load Testing |
| 2.5 Annual Sling Pull Test |
| 2.6 Test requirement: |
| 3.0 Task – Operations, Sustainment and Maintenance |
| 3.1 Sustainment |
| 3.2 Preventative Maintenance/ Annual Load Testing, and Quarterly Inspections |
| 3.3. Corrective Maintenance (CM) – Service Call(s) Work |
| 3.4 Service Calls Materials and Equipment |
| 3.5 General Acceptance Criteria |
| o Quality |
| o Timeliness |
| 4.0 Quality Control Plan (QCP)? |
| 5.0 Safety and Standards |
| 6.0 Location of Services |
| 7.0. Compliance and Standards |