This document is a comprehensive set of technical specifications for the Bearlodge Ranger District Furnace Replacement project at the Black Hills National Forest. The specifications detail the requirements for removing and replacing two existing propane-fueled gas furnaces in the district office building, which is a 7,254 square foot facility constructed in 1992, located in Sundance, Wyoming.
The technical specifications cover multiple aspects of the furnace replacement, including detailed requirements for two new propane gas furnaces: one 120 MBH and one 100 MBH unit. Key technical specifications include upflow configuration, 80% minimum efficiency, electric pilot ignition, safety controls, and specific electrical and mechanical installation requirements. The project involves removing the existing furnaces, installing new units with matching or improved specifications, and ensuring compliance with relevant building codes, safety standards, and installation best practices. The specifications provide comprehensive guidance on installation methods, electrical connections, ductwork, grounding, supporting devices, and quality control measures to ensure proper equipment replacement and integration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of Agriculture
Forest Service
Black Hills National Forest
Bearlodge Ranger District
February 2025
Bearlodge Ranger District Furnace Replacement
Bearlodge Ranger District
Specifications
Attachment 003 - Specifications
001500-1 BLACK HILLS NATIONAL FOREST
BEARLODGE RANGER DISTRICT
FURNACE REPLACE
LIST OF DRAWINGS AND SPECIFICATIONS
SECTION 001500
BLACK HILLS NATIONAL FOREST
BEARLODGE DISTRICT OFFICE
FURNACE REPLACEMENT
PART 1 – GENERAL
1.1 DESCRIPTION
A. List of Contract Drawings:
1. Index of Sheets:
1 Title Sheet 2 Original Building Design Floor Plan, A-2, 3 Original Building Elevations, A-5 4 Original Building Sections, A-8h 5 Original Building Mechanical, M-1 6 Original Building Electrical, E-1 7 Original Building Electric One-Line, E-3 8 Photos
8 Total Plan Sheets in this Contract
B. List of Contract Specifications
1. Index of Specifications
DIVISION 1 – GENERAL
REQUIREMENTS
Section 001500 List of Drawings and Specifications Section 010150 General Requirements
DIVISION 2 – SITEWORK N/A
DIVISION 3 - CONCRETE N/A
DIVISION 4 – MASONRY N/A
DIVISION 5 – METALS N/A
DIVISION 6 – WOOD AND
PLASTICS
N/A
DIVISION 7 – THERMAL AND
MOISTURE PROTECTION
N/A
DIVISION 8 – DOORS AND
WINDOWS
N/A
001500-2 BLACK HILLS NATIONAL FOREST
DIVISION 9 – FINISHES N/A
DIVISION 10 - SPECIALTIES N/A
DIVISION 11 – EQUIPMENT N/A
DIVISION 12 – FURNISHINGS N/A
Division 13 – SPECIAL
CONSTRUCTION
N/A
DIVISION 14 – CONVEYING
SYSTEMS
N/A
DIVISION 21 – FIRE
SUPPRESSION
N/A
DIVISION 22 – PLUMBING N/A
DIVISION 23 – HEATING,
VENTILATING AND AIR
CONDITIONING
Section 230500 Basic Mechanical Material and Methods
Section 233300 Air Duct Accessories
Section 235416.13 Gas-Fired Furnaces
DIVISION 26 – ELECTRICAL
Section 260050 General Electrical Provisions Section 260150 Basic Electrical Materials and Methods
DIVISION 27 –
COMMUNICATIONS
N/A
DIVISION 28 – ELECTRONIC
SAFETY AND SECURITY
N/A
DIVISION 31 – EARTHWORK N/A
DIVISION 32 – EXTERIOR
IMPROVEMENTS
N/A
DIVISION 33 – UTILITIES N/A
DIVISION 34 –
TRANSPORTATION
N/A
DIVISION 35- WATERWAYS
AND MARING
N/A
DIVISION 41 – MATERIAL N/A
001500-3 BLACK HILLS NATIONAL FOREST
PROCESSING AND EQUIPMENT
HANDLING
DIVISION 44 – POLLUTION
CONTROL EQUIPMENT
N/A
010150-4
GENERAL REQUIREMENTS
SECTION 010150
PART 1 – SUMMARY OF WORK
1.1 DESCRIPTION
A. Work for this project requires the Contractor to be responsible for supplying all labor, materials, equipment, utilities, miscellaneous items, freight and delivery and all necessary valid licenses and permits for the work summarized as follows:
1. Remove and replace 2 propane-fueled gas furnaces within the existing office building.
B. This project is located at the Black Hills National Forest, Bearlodge Ranger District Office at 101 South 21st Street, Sundance, Crook County, Wyoming 82729
C. Building Information:
1. Size: 7,254 square feet.
2. Elevation: 4,738 ft.
3. Construction Date: 1992
4. Orientation from North: 45 degrees
5. Occupancy: 39 full-time employees and 12 seasonal employees
6. Visitors: approximately 10 per day
7. Hours of Normal Operation: M-F 7:00 AM to 5:00 PM
8. Propane Supplier: Blakeman Propane; Account Number 402.
9. Electricity Provider: Powder River Energy Corporation, Account Number
3053925
D. Provided documentation:
1. Photos of existing HVAC system provided in Project Drawings
2. Architectural Information
a. Relevant Building Design Drawings provided in Project Drawings.
b. Roof:: Wood truss attic with insulation entirely above deck.
c. Walls: Steel-framed
d. Floor: Unheated slab-on-grade
e. Window Assemblies: Metal framing, operable.
f. Entrance doors: Metal framing
g. Window to Wall Ratios: 6.93%
h. Infiltration: 0.046 cfm per sf exterior area.
3. Climate:
a. Elevation: 4,738 ft above sea level
b. Winter Temperature, Extreme Annual Temperatures: -13.5℉
c. Summer Temperature, 0.4% ASHRAE Data: 94.2% dry bulb and 64.2℉mean coincident wet bult.
010150-5
d. Climate Zone 6A, International Energy Conservation Code
4. Indoor Design Conditions:
a. Summer indoor design temperature; 75℉ dry bulb
b. Winter indoor design temperature: 70 ℉ dry bulb.
c. Elevation: 4,738 ft above sea level
d. Winter Temperature, Extreme Annual Temperatures: -13.5℉
e. Summer Temperature, 0.4% ASHRAE Data: 94.2% dry bulb and 64.2℉mean coincident wet bult.
f. Climate Zone 6A, International Energy Conservation Code
1.2 CURRENT MECHANICAL SYSTEM CONDITIONS
A. The building has four 80% efficient propane furnaces with direct expansion (DX) cooling coils and outdoor condensing units. The furnaces are located in a mechanical room and the condensing units are located on the north side of the building.
B. The overall furnace heating capacity is 270,000 Btuh after derating for efficiency and altitude.
C. The mechanical equipment is approximately 32 years old.
D. The average life expectance of a furnace is 20 to 25 years.
E. Building air is distributed and controlled through four zones.
F. Outside air for ventilation is ducted from roof intakes to each furnace.
1.3 USE OF PREMISES
A. Use of Site: Confine constructions operations to immediate area of work. Do not disturb portions of Project site beyond areas in which the Work is indicated.
B. Full Government Occupancy: Government will occupy site and buildings during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the work so as not to interfere with Government's day-to-day operations.
C. Driveways and Entrances: Keep driveways, parking areas, loading areas and entrances serving premises clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.
Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government and authorities having jurisdiction.
1. Schedule deliveries to minimize use of driveways and entrances.
2. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
010150-6
1.4 WORK RESTRICTIONS
A. Nonsmoking Buildings: Smoking is not permitted within the buildings or within 25 feet (8
m) of entrances, operable windows, or outdoor air intakes.
1.5 CONTRACTOR’S RESPONSIBILITIES
A. Confine storage of materials to areas as approved by the CO.
B. Provide adequate signing and barricades and take necessary safety measures to protect the public during all construction operations. Minimize disturbance of all undisturbed areas.
1.6 FIELD VERIFICATION
A. Field verify all new and existing dimensions affecting the work of this contract before ordering products.
PART 2 – DEFINITION OF ITEMS AND PAYMENT
2.1 DESCRIPTION
A. This section explains what is and what is not included in each pay item; the limits or cut- off points where one item ends and another begins; and basis of payment for work items listed in the Schedule of Items.
B. Payment: For each individual item listed here and in the Schedule of Items, payment shall be full compensation for all work related to the particular item in accordance with these specifications, and as shown on the drawings.
2.2 SCHEDULE OF ITEMS
A. Schedule of Items: The project Schedule of Items includes several sections to organize the work into Base Items.
1. Remove and replace two propane fueled gas furnaces.
2. Contract award will be made for all Base Items.
B. Base Items (BI):
1. Base Item No. 1- Mobilization, Demobilization, Bonding and Insurance
a. Measurement: This item is measured as a Lump Sum quantity.
b. Payment: The contract lump sum price shown in the Schedule of Items shall include all materials, equipment, labor and incidentals required to perform all operations necessary for the movement of personnel, equipment, supplies and incidentals to the project site, and for all other work and operations that must be performed or that cause costs to be incurred prior to beginning work on the various items on the project site.
010150-7
2. Base Item No. 2- Removal of Existing Dysfunctional Furnaces
a. Measurement: This item is measured as EACH.
b. Quantity: Two (2) Each furnace system removal, complete with all components.
c. Payment: The contract lump sum price shown in the Schedule of Items includes all materials, equipment, demolition, labor and incidentals required to perform all operations necessary for disconnect, removal and disposal of two propane gas furnaces including but not limited to furnace, necessary ducting, vents, and all related hardware and appurtenances as specified and shown in the construction documents.
3. Base Item No. 3- Provide and Install New Furnace #1, 120 MBH.
b. Quantity: One (1) Each new complete furnace system rated at 120 MBH to replace existing Furnace #1, complete with all components to fully operational system.
c. Payment: The contract lump sum price shown in the Schedule of Items includes all materials, equipment, labor and incidentals required to provide and install new propane gas furnaces with all necessary ducting, vents, controls, and related hardware, parts, components, appurtenances and features necessary for complete and operational use as specified and shown in the construction documents.
4. Base Item No. 4- Provide and Install New Furnace #3, 100 MBH.
b. Quantity: One (1) Each new complete furnace system rated at 100 MBH to replace existing Furnace #3, complete with all components to fully operational system.
c. Payment: The contract lump sum price shown in the Schedule of Items includes all materials, equipment, labor and incidentals required to provide and install new propane gas furnaces with all necessary ducting, vents, controls, and related hardware, parts, components, appurtenances and features necessary for complete and operational use as specified and shown in the construction documents.
PART 3 – ACCIDENT PREVENTION
3.1 DESCRIPTION
A. This section consists of establishing an effective accident prevention plan and providing a safe environment for personnel and visitors.
3.2 SUBMITTALS
A. Accident Prevention Plan: Before on-site work begins, submit a company approved accident prevention plan. This plan will be posted in the contract file. Design the plan to address Federal, State, and Local Occupational Safety and Health requirements that apply to this project. Notice to Proceed will not be made until the plan is received. As a minimum the plan shall include:
010150-8
1. Name, position title and contact information of company executive responsible for approving the Accident Prevention Plan.
2. Name and contact information of supervisor responsible to carry out the plan.
3. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to ensure property protection and safety of the public, government personnel, and the Contractor's employees. Identify the work included under each phase by reference to specification section or division numbers.
4. Contingency plans for emergency situations such as medical, fire, hazard material spills and other contract assessed hazard prevention and abatement requirement needs that apply to this project.
B. Upon request, submit proof of employees' qualifications to perform assigned duties in a safe manner.
3.3 QUALITY ASSURANCE
A. Clauses entitled "Accident Prevention" and "Permits and Responsibilities" of the General Provisions: In case of conflicts between Federal, state, and local safety and health requirements, the most stringent shall apply. Equipment or tools not meeting OSHA requirements will not be allowed on the project sites. Failure to comply with the requirements of this section and related sections may result in suspension of work.
B. Qualifications of Employees: Ensure employees are physically qualified to perform assigned duties in a safe manner.
3.4 ACCIDENT REPORTING
A. Reportable Accidents: A reportable accident is defined as death, occupational disease, traumatic injury to employees or the public, property damage by accident in excess of $100, and fires. Within 7 calendar days of a reportable accident, fill out and forward to the CO a CA-1 form, which may be obtained from CO.
B. All Other Accidents: Report all other accidents to the CO as soon as possible and assist the
CO and other officials as required in the investigation of the accident.
3.5 FIRST AID FACILITIES
A. Provide adequate facilities for the number of employees and the type of work at the site.
3.6 EMERGENCY INSTRUCTIONS
A. Post telephone numbers and reporting instructions for ambulance, physician, hospital, fire department, and police in conspicuous locations at the work site.
3.7 ESCAPE ROUTES
A. Provide and maintain adequate escape routes at all times in accordance with the Life Safety Code (NFPA 101). No corridor, aisle, stairway, door or exit shall be obstructed or used in a manner that interferes with escape routes.
010150-9
3.8 PROTECTIVE EQUIPMENT
A. Personal Protective Equipment (PPE) shall meet requirements of NIOSH and MSHA, where applicable, as well as ANSI.
B. Inspect personal protective equipment daily and maintain in a serviceable condition. Clean, sanitize, and repair, as appropriate, personal items before issuing them to another individual.
C. Inspect and maintain other protective equipment and devices before use and on a periodic basis to ensure safe operation.
3.9 SAFETY MEETINGS
A. As a minimum, conduct weekly 15-minute "toolbox" safety meetings. These meetings shall be conducted by a foreman and attended by all construction personnel at the worksite.
3.10 TRAINING
A. First Aid: Provide adequate training to ensure prompt and efficient first aid.
B. Hazardous Material: Train and instruct each employee exposed to hazardous material in safe and approved methods of handling and storage. Hazardous materials are defined as explosive, flammable, poisonous, corrosive, oxidizing, irritating, or otherwise harmful substances that could cause death or injury.
PART 4 – SUBMITTAL PROCEDURES
4.1 PROCEDURES
A. Processing Time: Allow enough time for submittal review, including time for re-submittals, as follows. Time for review shall commence on CO's receipt of submittal.
1. Initial Review: Allow 5 working days for initial review of each submittal. Allow additional time if processing must be delayed to permit coordination with subsequent submittals. CO will advise Contractor when a submittal being processed must be delayed for coordination.
2. If intermediate submittal is necessary, process it in same manner as initial submittal.
3. Allow 5 working days for processing each re-submittal.
4. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing.
B. Identification: Place a permanent label or title block on each submittal for identification.
1. Indicate name of firm or entity that prepared each submittal on label or title block.
2. Provide a space approximately 2 by 3 inches on label or beside title block to record
010150-10
Contractor's review and approval markings and action taken by CO.
3. Include the following information on label for processing and recording action taken:
a. Project name.
b. Date.
c. Name and address of Contractor.
d. Name of manufacturer.
e. Unique identifier, including revision number.
f. Number and title of appropriate Specification Section.
g. Drawing number and detail references, as appropriate.
h. Other necessary identification.
C. Deviations: Highlight, encircle, or otherwise identify deviations from the Contract
Documents on submittals.
D. Additional Copies: Unless additional copies are required for final submittal, and unless CO observes noncompliance with provisions of the Contract Documents, initial submittal may serve as final submittal.
E. Use for Construction: Use only final submittals with mark indicating action taken by CO in connection with construction.
F. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to CO.
G. Submittals not required by the Contract Documents will not be reviewed and may be discarded.
4.2 SUBMITTALS
A. General: Prepare and submit Submittals required by individual Specification Sections.
1. Number of Copies: Submit three copies of each submittal, unless otherwise indicated.
CO will return two copies. Mark up and retain one returned copy as a Project Record Document.
B. Contractor's Construction Schedule: Provide a construction schedule.
C. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.
1. Mark each copy of each submittal to show which products and options are applicable.
2. Include the following information, as applicable:
a. Manufacturer's written recommendations.
b. Manufacturer's product specifications.
010150-11
c. Manufacturer's installation instructions.
d. Manufacturer's catalog cuts.
4.3 REQUESTS FOR INFORMATION (RFIs)
A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI in the form specified. RFIs submitted by entities other than the Contractor shall not be accepted.
1. Coordinate and submit RFIs in a prompt manner to avoid delays in Contractor’s work or work of subcontractors.
2. Include a detailed, legible description of item needing information or interpretation and the following:
a. Project name and number
b. Date
c. Contractor Name and signature
d. RFI number, numbered sequentially
e. RFI subject
f. Specification Section, Drawing number, and detail references, as appropriate.
g. Field dimensions and conditions, as appropriate.
h. Contractor’s suggested resolution. If Contractor’s solution(s) affects the
Contract Time or Contract Sum, Contractor shall state impact in the RFI.
i. Include sketches, descriptions, measurements, photos, Product Data, Shop
Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.
3. CO’s Action: CO will review each RFI, determine action required, and respond.
Allow seven (7) working days for CO's response for each RFI. RFIs received by CO after 1:00 p.m. will be considered as received the following working day.
a. The following RFIs will be returned without action:
1) Requests for approval of submittals.
2) Requests for approval of substitutions.
3) Requests for coordination information already indicated in the Contract.
4) Documents.
5) Requests for adjustments in the Contract Time or the Contract Sum.
6) Requests for interpretation of CO's actions on submittals.
7) Incomplete RFIs or inaccurately prepared RFIs.
b. CO's action may include a request for additional information, in which case CO's time for response will date from time of receipt of additional information.
c. CO's action on RFIs that may result in a change to the Contract Time or the Contract Sum may be eligible for Contractor to submit Change Proposal according to Contracting Section "Contract Modification Procedures."
1) If Contractor believes the RFI response warrants change in the Contract
Time or the Contract Sum, notify CO in writing within 10 days of receipt
010150-12 of the RFI response.
PART 5– TEMPORARY FACILITIES AND CONTROLS
5.1 DESCRIPTION
A. This section consists of requirements for temporary facilities and controls, including utilities, support facilities, and security and protection facilities.
5.2 UTILITIES
A. Sanitary Facilities: Use of Government sanitary facilities will be permitted, as long as facilities are cleaned and maintained in a condition acceptable to CO. At Substantial Completion, restore these facilities to condition existing before initial use.
B. Electric Power and Lighting Service: Use of Government's existing electric power and lighting service will be permitted without metering and without payment of use charges, as long as equipment is maintained in a condition acceptable to CO.
C. Telephone Service: The Contractor is responsible for providing telephone service deemed necessary for the duration of the construction.
5.3 DELIVERY, STORAGE, AND HANDLING
A. Deliver equipment, parts and accessories in factory packages, marked with manufacturer, and product name.
B. Coordinate on-site storage requirements with the Contracting Officer (CO).
C. Locate temporary construction and support facilities for easy access and to avoid conflict with existing Government operations.
D. Store items at on-site location as determined by CO. Confine storage of materials to areas approved by the CO.
5.4 CONSTRUCTION WASTE DISPOSAL FACILITIES
A. Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste.
B. Implement waste reduction and recycling techniques to the maximum extent possible.
1. Breakdown packaging cardboard and boxes into flat sheets. Bundle and store in a dry location prior to transport.
2. As much as possible, require deliveries using pallets and crates to remove them from Project site. For pallets and crates that remain onsite, break down into component wood pieces for recycling.
010150-13
C. Do not burn waste materials.
D. Transport waste materials off Government property and legally dispose of them.
5.5 SECURITY AND PROTECTION
A. Environmental Protection: Provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
B. Restrict use of noisemaking tools and equipment to hours that will minimize complaints from persons near Project site.
C. Avoid use of substances that contribute to indoor air quality deterioration. Provide Safety Data Sheets for all substances upon request of CO.
D. Fire Protection:
1. Store combustible materials in containers in fire-safe locations.
2. Maintain unobstructed access to fire extinguishers, fire hydrants, fire-protection facilities, stairways, and other access routes for firefighting. Prohibit smoking in hazardous fire-exposure areas.
3. Prohibit smoking within government facilities and within 25 feet of existing building.
PART 6 – EXECUTION REQUIREMENTS
6.1 DESCRIPTION
A. This section consists of general procedural requirements governing execution of the Work including, but not limited to, the following:
1. Schedule
2. General installation of products.
3. Progress cleaning.
4. Correction of the Work.
6.2 SCHEDULE
A. Occupied Work Area: Work will be performed in occupied and functioning Government office facility.
B. Perform work in such manner as to minimize disruptions to Government.
C. Schedule: Contractor shall submit Proposed Schedule to CO.
D. Coordination of Work: Contractor will keep CO informed daily as work progresses..
010150-14
6.3 EXAMINATION
A. Existing Conditions: The existence and location of existing mechanical system components are not guaranteed. Before beginning work, investigate and verify the existence and location of all mechanical system components and related features affecting the Work.
B. Acceptance of Conditions: Examine areas and conditions with Contracting Officer.
Record observations.
1. Verify compatibility with and suitability of substrates, including compatibility with existing finishes.
2. Proceed with installation only after unsatisfactory conditions have been corrected.
Proceeding with the Work indicates acceptance of surfaces and conditions.
6.4 PREPARATION
A. Existing Office Interruptions: Minimize interruption to Government facilities and operations. Notify CO not less than two (2) working days in advance of proposed utility interruptions.
B. Field Measurements: Take field measurements as required to fit the Work properly. Verify space requirements and dimensions. .
C. Review of Contract Documents and Field Conditions: Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to CO. Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents.
D. Verification: Before proceeding with Work, verify information shown on project Documents in relation to actual conditions. If discrepancies are discovered, notify CO promptly.
6.5 INSTALLATION
A. General: Locate the Work and components of the Work accurately, in correct alignment and elevation, as indicated.
1. Make vertical work plumb and make horizontal work level.
2. Where space is limited, install components to maximize space available for maintenance and ease of removal for replacement.
B. Comply with manufacturer's written instructions and recommendations for installing products.
C. Install products at the time and under conditions that will ensure the best possible results.
D. Conduct construction operations so no part of the Work is subjected to damaging operations or loading in excess of that expected during normal conditions of occupancy.
010150-15
E. Anchors and Fasteners: Provide anchors and fasteners as required to anchor each component securely in place, accurately located and aligned with other portions of the Work.
1. Where mounting heights are not indicated, mount components at heights directed by
Contracting Officer.
2. Allow for building movement, including thermal expansion and contraction.
F. Joints: Make joints of uniform width. Where joint locations in exposed work are not indicated, arrange joints for the best visual effect. Fit exposed connections together to form hairline joints.
G. Hazardous Materials: Use products, cleaners, and installation materials that are not considered hazardous.
6.6 PROGRESS CLEANING
A. General: Clean Project site and work areas daily, including common areas. Dispose of materials lawfully.
1. Comply with requirements in NFPA 241 for removal of combustible waste materials and debris.
2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C).
3. Containerize hazardous and unsanitary waste materials separately from other waste. Mark containers appropriately and dispose of legally, according to regulations.
B. Site: Maintain Project site free of waste materials and debris.
C. Work Areas: Clean areas where work is in progress to the level of cleanliness necessary for proper execution of the Work.
D. Waste Disposal: Burying or burning waste materials on-site will not be permitted.
Washing waste materials down sewers or into waterways will not be permitted.
6.7 PROTECTION OF INSTALLED CONSTRUCTION
A. Provide final protection and maintain conditions that ensure installed Work is without damage or deterioration at time of Acceptance by Government.
B. Installed Work: Keep installed work clean. Clean installed surfaces according to written instructions of manufacturer or fabricator of product installed, using only cleaning materials specifically recommended. If specific cleaning materials are not recommended, use-cleaning materials that are not hazardous to health or property and that will not damage exposed surfaces.
C. During handling and installation, clean and protect construction in progress and ad- joining
010150-16 materials already in place. Apply protective covering where required to ensure protection from damage or deterioration.
D. Limiting Exposures: Supervise construction operations to assure that no part of the construction completed or in progress is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period.
6.8 CORRECTION OF THE WORK
A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.
1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.
B. Restore permanent facilities used during construction to their specified condition.
C. Remove and replace damaged surfaces that are exposed to view if surfaces cannot be repaired without visible evidence of repair.
D. Repair components that do not operate properly. Remove and replace operating components that cannot be repaired.
PART 7 – OPERATIONS AND MAINTENANCE MANUALS
7.1 SUBMITTALS
A. Submit two copies of Operations and Maintenance data in final form withing 5 working days of completion of installation.
B. Operation and Maintenance data shall include:
1. Operation Data: Include instructions, equipment descriptions, equipment identification with serial number of each component, list of parts and diagrams of parts.
2. Maintenance Data: Include manufacturer's information, product(s) name and model number(s), list of spare parts, nomenclature and number of replacement parts, maintenance procedures, maintenance and service schedules for preventive and routine maintenance.
3. Copies of warranties and lists of circumstances and conditions that would affect validity of warranties
4. Source Information: For each product, list name, address, and telephone number of Installer or supplier.
PART 8 – CLOSEOUT PROCEDURES
8.1 DESCRIPTION
010150-17
A. This section consists of administrative and procedural requirements for contract closeout, including, but not limited to, the following:
1. Inspection procedures.
2. Project Record Documents.
3. Final cleaning.
8.2 SUBSTANTIAL COMPLETION
A. Definition of Substantial Completion: The Date certified by the CO when construction is sufficiently complete, in accordance with the Contract Documents, so the Government can occupy or utilize the Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents.
B. Preliminary Procedures: Before requesting inspection for determining date of Substantial
Completion, complete the following. List items below that are incomplete in request.
1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.
2. Advise CO of pending insurance changeover requirements.
3. Submit specific warranties, workmanship bonds, final certifications, and similar documents.
4. Obtain and submit releases permitting Government unrestricted use of the Work and access to services and utilities. Include occupancy permits, operating certificates, and similar releases.
5. Prepare and submit Project Record Documents, operation and maintenance manuals, Final Completion construction photographs and photographic negatives, and similar final record information.
6. Deliver tools, spare parts, extra materials, and similar items to location designated by Government. Label with manufacturer's name and model number where applicable.
7. Make final changeover of permanent locks and deliver keys to CO. Advise Government personnel of changeover in security provisions.
8. Complete startup testing of systems.
9. Submit test/adjust/balance records.
10. Complete final cleaning requirements, including touchup painting.
11. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.
C. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by CO, that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
010150-18
2. Results of completed inspection will form the basis of requirements for Final Completion.
8.3 FINAL COMPLETION
A. Preliminary Procedures: Before requesting final inspection for determining date of Final
Completion, complete the following:
1. Submit certified copy of CO’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by CO. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.
2. Submit evidence of final, continuing insurance coverage complying with insurance requirements.
3. Instruct Government personnel in operation, adjustment, and maintenance of products, equipment, and systems.
B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.
1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.
8.4 FINAL CLEANING
A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.
B. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.
C. Complete the following cleaning operations before requesting inspection for certification of
Substantial Completion for entire Project or for a portion of Project:
1. Clean Project site and areas disturbed by construction activities of rubbish, waste material, litter, and other foreign substances.
2. Remove tools, construction equipment, machinery, and surplus material from Project site.
3. Clean exposed hard-surfaced finishes to a dirt-free condition, free of stains, films, and similar foreign substances. Restore reflective surfaces to their original condition.
4. Remove debris and surface dust from work area and adjacent areas affected by work.
010150-19
5. Vacuum carpet and similar soft surfaces, removing debris and excess nap; shampoo if visible soil or stains remain.
6. Remove labels that are not permanent.
7. Touch up and otherwise repair and restore marred, exposed finishes and surfaces.
Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.
a. Do not paint over “UL” and similar labels, including mechanical and electrical nameplates.
8. Wipe surfaces of mechanical and electrical equipment, and similar equipment.
Remove excess lubrication, paint and mortar droppings, and other foreign substances.
9. Replace parts subject to unusual operating conditions.
10. Clean exposed surfaces of diffusers, registers, and grills.
11. Leave Project clean and ready for occupancy.
D. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on Government property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of lawfully.
PART 9 – QUALITY REQUIREMENTS
9.1 DESCRIPTION
A. This section includes administrative and procedural requirements for quality assurance and quality control.
B. Testing and inspecting services are required to verify compliance with requirements specified as indicated. These services do not relieve Contractor of responsibility for compliance with the Contract Document requirements, and do not limit the Contractor’s quality control procedures that facilitate compliance with Contract Document requirements.
9.2 CONFLICTING REQUIREMENTS
A. General: If compliance with two or more standards is specified and the standards establish different or conflicting requirements for minimum quantities or quality levels, comply with the most stringent requirement. Refer uncertainties and requirements that are different, but apparently equal, to CO for a decision before proceeding.
B. Minimum Quantity or Quality Levels: The quantity or quality level shown or specified shall be the minimum provided or performed. The actual installation may comply exactly with the minimum quantity or quality specified, or it may exceed the minimum with reasonable limits. To comply with these requirements, indicated numeric values are minimum or maximum, as appropriate, for the context of requirements. Refer uncertainties to CO for a decision before proceeding.
9.3 QUALITY CONTROL
010150-20
A. General: The quality of all work shall be the responsibility of the Contractor. Testing shall be the responsibility of an independent testing laboratory.
B. Inspect and test all work often enough to ensure that the quality of materials, workmanship, construction, finish, and functional performance is in compliance with applicable specifications and drawings. Failure to test often enough does not relieve Contractor of responsibility of testing or redoing work to accommodate testing.
C. Contractor Responsibilities: Unless otherwise indicated, provide quality-control services specified and required by authorities having jurisdiction. Notify CO at least two (2) working days in advance for opportunity to witness test.
D. Manufacturer's Field Services: Where indicated, engage a factory-authorized service representative to inspect field-assembled components and equipment installation, including service connections. Report results in writing.
E. Retesting/Reinspecting: Regardless of whether original tests or inspections were Contractor's responsibility, provide quality-control services, including retesting and reinspecting, for construction that revised or replaced Work that failed to comply with requirements established by the Contract Documents.
F. Off-Site Control: Items that are fabricated or assembled off-site shall be inspected for quality control at the place of fabrication. Provide documentation of fabrication.
G. Enforcement: The Contractor shall stop work on any item or feature pending satisfactory correction of any deficiency noted by the quality control staff, testing agency, or the CO.
9.4 REPAIR AND PROTECTION
A. General: On completion of testing, inspecting, sample taking, and similar services, repair damaged construction and restore substrates and finishes.
B. Restore patched areas and extend restoration into adjoining areas in a manner that eliminates evidence of patching.
END OF SECTION 010150
FURNACE REPLACEMENT
230500 - 21
BASIC MECHANICAL
MATERIALS AND METHODS
SECTION 230500
BASIC MECHANICAL MATERIALS AND METHODS
PART 1 - GENERAL
1.
1.1 SUMMARY
A. This Section includes the following:
1. Mechanical Removal
2. Equipment installation requirements common to equipment sections.
1.2 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specifications, apply to Division 23 Sections.
1.3 DEFINITIONS
A. Finished Spaces: Spaces other than mechanical and electrical equipment rooms, furred spaces, pipe and duct shafts, unheated spaces immediately below roof, spaces above ceilings, unexcavated spaces, crawlspaces, and tunnels.
B. Exposed, Interior Installations: Exposed to view indoors. Examples include finished occupied spaces and mechanical equipment rooms.
C. Exposed, Exterior Installations: Exposed to view outdoors or subject to outdoor ambient temperatures and weather conditions. Examples include rooftop locations.
D. Concealed, Interior Installations: Concealed from view and protected from physical contact by building occupants. Examples include above ceilings and in duct shafts.
E. Concealed, Exterior Installations: Concealed from view and protected from weather conditions and physical contact by building occupants but subject to outdoor ambient temperatures. Examples include installations within unheated shelters.
1.4 QUALITY ASSURANCE
A. Electrical Characteristics for Mechanical Equipment: Equipment of higher electrical characteristics may be furnished provided such proposed equipment is approved in writing and connecting electrical services, circuit breakers, and conduit sizes are appropriately modified. If minimum energy ratings or efficiencies are specified, equipment shall comply with requirements.
B. Mechanical equipment and systems serving the building heating, cooling or ventilating needs shall meet the requirements of ASHRAE 90.1-2004.
FURNACE REPLACEMENT
230500 - 22
1.5 COORDINATION
A. Coordinate shutdown of heating systems with Contracting Officer.
B. Coordinate work with other trades.
1.6 SUBMITTALS
A. As specified in Division 1 Section, “Submittal Procedures.”
PART 2 -PRODUCTS
2.
2.1 PREPACKAGED CONCRETE MIX
A. Material shall be identified as conforming to ASTM C387, Normal Strength Concrete;
Normal Weight Concrete.
2.2 REINFORCING BARS
A. Deformed steel bars: ASTM A 615, Grade 40, #4 bars
PART 3 -EXECUTION
3.
3.1 MECHANICAL REMOVAL
A.
Disconnect, demolish, and remove mechanical systems, equipment, and components indicated to be removed.
B. Remove fuel oil from storage tanks prior to tank removal.
3.2 EQUIPMENT INSTALLATION - COMMON REQUIREMENTS
A. Install equipment to allow maximum possible headroom unless specific mounting heights are indicated.
B. Install equipment level and plumb, parallel and perpendicular to other building systems and components in exposed interior spaces, unless otherwise indicated.
C. Install mechanical equipment to facilitate service, maintenance, and repair or replacement of components. Connect equipment for ease of disconnecting, with minimum interference to other installations.
D. Drawings are diagrammatic and show general design, arrangement, and extent of systems. Do not scale drawings for roughing-in measurement, nor use as shop drawings. Install systems based on field measurements.
E. Before start-up, verify that systems have been tested and operational and performance tests have been made. Check each piece of equipment for proper lubrication, drive
FURNACE REPLACEMENT
230500 - 23 rotation, proper control sequence, and other conditions that may cause damage to equipment or endanger personnel.
END OF SECTION 230500
233300–24 BLACK HILLS NATIONAL FOREST
BEARLODGE RANGER DISTRCT
FURNACE REPLACMENT
AIR DUCT ACCESSORIES
SECTION 233300
A. Section Includes:
1. Flexible connectors.
2. Duct accessory hardware.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. For duct silencers, include pressure drop, dynamic insertion loss, and self-generated noise data.
Include breakout noise calculations for high-transmission-loss casings.
B. Shop Drawings: For duct accessories. Include plans, elevations, sections, details, and attachments to other
1. Detail duct accessories' fabrication and installation in ducts and other construction. Include dimensions, weights, loads, and required clearances; and method of field assembly into duct systems and other construction. Include the following:
a. Special fittings.
1.3 INFORMATIONAL SUBMITTALS
A. Coordination Drawings: Reflected ceiling plans, or BIM model, drawn to scale, and coordinated with each other, using input from installers of the items involved.
1.4 CLOSEOUT SUBMITTALS
A. Operation and maintenance data.
PART 2 - PRODUCTS
2.1 PERFORMANCE REQUIREMENTS
A. Comply with NFPA 90A and NFPA 90B.
B. Comply with SMACNA's "HVAC Duct Construction Standards - Metal and Flexible" for acceptable materials, material thicknesses, and duct construction methods unless otherwise indicated. Sheet metal materials shall be free of pitting, seam marks, roller marks, stains, discolorations, and other imperfections.
2.2 DUCT ACCESSORY HARDWARE
A. Instrument Test Holes: Cast iron or cast aluminum to suit duct material, including screw cap and gasket.
Size to allow insertion of pitot tube and other testing instruments and of length to suit duct-insulation thickness.
B. Adhesives: High strength, quick setting, neoprene based, waterproof, and resistant to gasoline and grease.
233300–25 BLACK HILLS NATIONAL FOREST
2.3 MATERIALS
A. Galvanized Sheet Steel: Comply with ASTM A653/A653M.
1. Galvanized Coating Designation: G60.
2. Exposed-Surface Finish: Mill phosphatized.
B. Stainless Steel Sheets: Comply with ASTM A480/A480M, Type 304, and having a No. 2D finish for concealed ducts
C. Aluminum Sheets: Comply with ASTM B209M, Alloy 3003, Temper H14; with mill finish for concealed ducts and standard, one-side bright finish for exposed ducts.
D. Extruded Aluminum: Comply with ASTM B221M, Alloy 6063, Temper T6.
E. Reinforcement Shapes and Plates: Galvanized-steel reinforcement where installed on galvanized sheet metal ducts; compatible materials for aluminum and stainless steel ducts.
PART 3 - EXECUTION
3.1 INSTALLATION
A. Install duct accessories in accordance with applicable details in SMACNA's "HVAC Duct Construction
Standards - Metal and Flexible" for metal ducts and in NAIMA AH116 for fibrous-glass ducts.
B. Install duct accessories of materials suited to duct materials; use galvanized-steel accessories in galvanized-steel and fibrous-glass ducts, stainless steel accessories in stainless steel ducts, and aluminum accessories in aluminum ducts.
3.2 FIELD QUALITY CONTROL
A. Tests and Inspections:
1. Operate dampers to verify full range of movement.
2. Inspect locations of access doors, and verify that size and location of access doors are adequate to perform required operation.
3. Operate fire, smoke, and combination fire and smoke dampers to verify full range of movement and that proper heat-response device is installed.
4. Inspect turning vanes for proper and secure installation, and verify that vanes do not move or rattle.
5. Operate remote damper operators to verify full range of movement of operator and damper.
END OF SECTION 233300
235416.13–26 BLACK HILLS NATIONAL FOREST
GAS-FIRED FURNACES
SECTION 235416.13
A. Section Includes:
1. Gas-fired, noncondensing furnaces and accessories complete with controls.
1.2 ACTION SUBMITTALS
A. Product Data: For each type of product.
B. Shop Drawings:
1. Include details of equipment assemblies. Indicate dimensions, weights, loads, required clearances, method of field assembly, components, and location and size of each field connection.
2. Include diagrams for power, signal, and control wiring.
1.3 CLOSEOUT SUBMITTALS
A. Operation and maintenance data.
1.4 WARRANTY
A. Special Warranty: Manufacturer agrees to repair or replace the following components of furnaces that fail in materials or workmanship within specified warranty period:
1. Warranty Period, Commencing on Date of Substantial Completion:
a. Furnace Heat Exchanger: 20 year.
b. Integrated Ignition and Blower Control Circuit Board: 5 years.
c. Draft-Inducer Motor: 5 years.
PART 2 - PRODUCTS
2.1 ASSEMBLY DESCRIPTION
A. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, Article 100, by a qualified testing agency, and marked for intended location and application.
B. General Requirements for Noncondensing Gas-Fired Furnaces: Factory assembled, piped, wired, and tested; complying with ANSI Z21.47/CSA 2.3 and NFPA 54.
2.2
GAS-FIRED FURNACES, NONCONDENSING
1. Cabinet interior around heat exchanger shall be factory-installed insulation.
2. Lift-out panels shall expose burners and all other items requiring access for maintenance.
3. Factory paint external cabinets in manufacturer's standard color.
4. Airstream Surfaces: Surfaces in contact with the airstream shall comply with requirements in
ASHRAE 62.1.
235416.13–27 BLACK HILLS NATIONAL FOREST
B. Fan: Centrifugal, factory balanced, resilient mounted, direct drive.
1.
Special Motor Features, Multispeed: multispeed with internal thermal protection and permanent lubrication.
2. Special Motor Features, ECM: Electronically controlled motor (ECM) controlled by integrated furnace/blower control.
C. Type of Gas: Propane.
D. Heat Exchanger: Aluminized steel.
E. Burner:
1. Gas Valve: 100 percent safety main gas valve, main shutoff valve, pressure regulator, safety pilot with electronic flame sensor, limit control, transformer, and combination ignition/fan timer control board.
2. Ignition: Electric pilot ignition, with hot-surface igniter
F. Gas-Burner Safety Controls:
1. Electronic Flame Sensor: Prevents gas valve from opening until pilot flame is proven; stops gas flow on ignition failure.
2. Flame Rollout Switch: Installed on burner box; prevents burner operation.
3. Limit Control: Fixed stop at maximum permissible setting; de-energizes burner on excessive bonnet temperature; automatic reset.
G. Combustion-Air Inducer: Centrifugal fan with thermally protected motor and sleeve bearings prepurges heat exchanger and vents combustion products; pressure switch prevents furnace operation if combustion-air inlet or flue outlet is blocked.
H. Furnace Controls: Solid-state board integrates ignition, heat, cooling, and fan speeds; and adjustable fan-on and fan-off timing; terminals for connection to accessories.
I. Capacities and Characteristics #1:
1. Airflow Configuration: Upflow
2. Gas:
a. Type: Propane.
b. Minimum Efficiency AFUE: 80 percent.
c. Minimum Thermal Efficiency: 80 percent.
d. Minimum Combustion Efficiency: 80 percent.
e. Input: 100 MBH.
f. Heat Output: 80 MBH.
g. Gas Connection Size: ½ NPT.
h. Combustion-Air Inlet Size: 11 Inches.
i. Combustion-Air Inlet Material: Stainless Steel.
j. Vent Size: 4 inches.
3. Fan:
a. Airflow: 1925 SCFM.
b. External Static Pressure: 0.5 inches.
c. Motor:
1) Size: ¾ horsepower.
235416.13–28 BLACK HILLS NATIONAL FOREST
d. Volts: 120
e. Phase: Single.
f. Hertz: 60.
g. Full-Load Amperes: 11 Amp.
h. Minimum Circuit Ampacity: 11 Amp.
i. Maximum Overcurrent Protection: 15 Amp.
4. Furnace Electrical Connection:
a. Volts: 120
b. Phase: Single
c. Hertz: 60.
d. Full-Load Amperes: 11 Amp.
e. Minimum Circuit Ampacity: 8.8 Amp.
f. Maximum Overcurrent Protection: 15 Amp.
J. Capacities and Characteristics #3:
1. Airflow Configuration: Upflow
2. Gas:
a. Type: Propane.
b. Minimum Efficiency AFUE: 80 percent.
c. Minimum Thermal Efficiency: 80 percent.
d. Minimum Combustion Efficiency: 80 percent.
e. Input: 100 MBH.
f. Heat Output: 80 MBH.
g. Gas Connection Size: ½ NPT.
h. Combustion-Air Inlet Size: 11 Inches.
i. Combustion-Air Inlet Material: Stainless Steel.
j. Vent Size: 4 inches.
3. Fan:
a. Airflow: 1750 SCFM.
b. External Static Pressure: 0.5 inches.
c.…