This document outlines cost line item numbers (CLINs) for an Integrated Battle Command System (IBCS) hardware low rate initial production/full rate production contract opportunity with the Department of the Army Materiel Command Contracting Command Redstone Arsenal. CLIN 0001 covers EOC/ECT production in accordance with statement of work paragraphs 5.1 through 5.5, 5.7 through 5.14, and 9. CLIN 0002 covers ICE production meeting those same SOW paragraphs, while CLIN 0003 covers IFCN RELAY and CLIN 0004 covers B-KIT production, each adhering to the listed SOW sections. CLIN 0005 addresses first article inspections for initial deliveries. CLINs 0006 through 0008 cover product engineering support, new capabilities engineering services, and logistics support, reliability, and maintainability, respectively, in accordance with SOW paragraphs 6 through 9. CLIN 0009 involves any proposed travel for CLINs 0006 through 0008, and CLIN 0010 covers related material. Questions for this RFP are due by December 10, 2020 at 4 pm Central Standard Time.
View the file
Other files for this federal contract opportunity
Show all 50
RFP for Integrated Battle Command System (IBCS) LRIP/FRP has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN 0001 – EOC/ECT
CLIN 0001 will include all costs related to the production and delivery of the EOC/ECT in accordance with the SOW paragraphs 5.1, 5.2, 5.7, 5,8, 5.9, 5.10, 5.11, 5.12, 5.13, 5.14 and 9. The CLIN shall include all prime and subcontract labor costs, PPP cost, direct material, other direct costs, etc to fulfill the requirements at the identified SOW paragraphs.
CLIN 0002 – ICE
CLIN 0002 will include all costs related to the production and delivery of the EOC/ECT in accordance with the SOW paragraphs 5.3, 5.7, 5,8, 5.9, 5.10, 5.11, 5.12, 5.13, 5.14 and 9. The CLIN shall include all prime and subcontract labor costs, PPP cost, direct material, other direct costs, etc to fulfill the requirements at the identified SOW paragraphs.
CLIN 0003 – IFCN RELAY
CLIN 0003 will include all costs related to the production and delivery of the EOC/ECT in accordance with the SOW paragraphs 5.4, 5.7, 5,8, 5.9, 5.10, 5.11, 5.12, 5.13, 5.14 and 9. The CLIN shall include all prime and subcontract labor costs, PPP cost, direct material, other direct costs, etc to fulfill the requirements at the identified SOW paragraphs.
CLIN 0004 – B-KIT
CLIN 0004 will include all costs related to the production and delivery of the EOC/ECT in accordance with the SOW paragraphs 5.5, 5.7, 5,8, 5.9, 5.10, 5.11, 5.12, 5.13, 5.14 and 9. The CLIN shall include all prime and subcontract labor costs, PPP cost, direct material, other direct costs, etc to fulfill the requirements at the identified SOW paragraphs.
CLIN 0005 – FIRST ARTICLE INSPECTION
CLIN 0002 will include all costs related to the first article inspections on the first deliveries of the MEI’s in accordance with the SOW paragraphs 5.6, 5.7, 5,8, 5.9, 5.10, 5.11, 5.12, 5.13, 5.14 and 9. The CLIN shall include all prime and subcontract labor costs, PPP cost, direct material, other direct costs, etc to fulfill the requirements at the identified SOW paragraphs.
CLIN 0006 – PRODUCT ENGINEERING SUPPORT
CLIN 0006 will include all costs related to the product engineering support in accordance with the SOW paragraphs 6 and 9. The CLIN shall include all prime and subcontract labor costs, PPP cost, and other direct costs, etc to fulfill the requirements at the identified SOW paragraphs. Any material and travel costs related to this CLIN shall be included in the Cost No Fee (CNF) Material and Travel CLINs.
CLIN 0007 - NEW CAPABILITIES ENGINEERING SERVICES
CLIN 0007 will include all costs related new capabilities engineering services in accordance with the SOW paragraphs 7 and 9. The CLIN shall include all prime and subcontract labor costs, PPP cost, and other direct costs, etc to fulfill the requirements at the identified SOW paragraphs. Any material and travel costs related to this CLIN shall be included in the Cost No Fee (CNF) Material and Travel CLINs.
CLIN 0008 - LOGISTICS SUPPORT, RELIABILITY AND MAINTAINABILITY
CLIN 0008 will include all costs related to the logistics support, reliability and maintainability in accordance with the SOW paragraphs 8 and 9. The CLIN shall include all prime and subcontract labor costs, PPP cost, and other direct costs, etc to fulfill the requirements at the identified SOW paragraphs. Any material and travel costs related to this CLIN shall be included in the Cost No Fee (CNF) Material and Travel CLINs.
CLIN 0009 – TRAVEL
CLIN 0009 will include any proposed travel in support of CLINs 0006, 0007, and 0008.
CLIN 0010 – MATERIAL
CLIN 0010 will include any proposed material in support of CLINs 0006, 0007, and 0008.