This statement of work outlines requirements for rehabilitating the restrooms and storage room at the San Cristobal Outworks Guardhouse in San Juan National Historic Site, Puerto Rico. The project includes demolishing existing facilities, replacing all plumbing, electrical, and bathroom fixtures and accessories, repairing masonry and painting, and installing new counters, partitions, floor and wall tiles, and water fountains. Bidders must provide plans, shop drawings, samples, warranties, and as-built drawings. The work must be completed within one year of notice to proceed. The National Park Service is the contracting agency.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAN JUAN NATIONAL HISTORIC SITE

OLD SAN JUAN, PUERTO RICO

Rehabilitate San Cristobal Outworks Guardhouse

PMIS 330736

STATEMENT OF WORK

FEBRUARY 2023

NATIONAL PARK SERVICE

SOUTHEAST REGION

SOUTH MAJOR ACQUISITION BUYING OFFICE

TABLE OF CONTENTS

Table of Contents 2

1 BACKGROUND 3

2 OBJECTIVES 3

3 PLACE OF PERFORMANCE 3

4 PERIOD OF PERFORMANCE 3

5 SCOPE AND GENERAL REQUIREMENTS 4

6 DELIVERABLES: 5

7 GOVERNMENT FURNISHED PROPERTY: 5

8 SAFETY: 5

9 SECURITY CONSIDERATIONS: 6

10 TRAVEL: 7

11 SPECIAL MATERIAL REQUIREMENTS: 7

12 OTHER UNIQUE REQUIREMENTS & CONSIDERATIONS: 7

13 QUALITY ASSURANCE REQUIREMENT 8

14 PERFORMANCE REQUIREMENTS 9

15 Technical Requirements 16

16 Attachments 50

1 BACKGROUND

San Cristobal Outworks Guardhouse storage room and restrooms are in bad conditions.

Currently, restrooms remain closed, due to water and sewer problems. Restrooms are in a deteriorated state: structure has significant structural damages, biological growth is present in the walls, and tiles have weathered appearance. Plumbing repairs and/or replacements need to be conducted, to avoid future water issues. Many sensors for the toilets, urinals and sinks do not work. Paint is weathered and very deteriorated, paint job needs to be performed. The project’s purpose is to solve a major problem for the park’s visitors.

There is only one restroom location for visitors at the San Cristobal Outworks. Thousands of visitors’ everyday experience hardships to use the park’s restroom facilities. Seniors, parents with infants, and visitors with disabilities are the most affected by the current situation. If the restrooms are not repaired soon, the situation will continue to affect the public in a negative way.

The San Cristobal Outworks Guardhouse storage room and restrooms will be rehabilitated. This project will include piping repairs, masonry repairs, and electric repairs. This project will remove and replace all the toilets, urinals, mirrors, sinks, fixtures, lighting, partitions, tiles (floor and wall), hand dryers, toilet paper dispensers, paint, and all bathroom accessories will be replaced.

The ceiling will also be cleaned repaired, and repainted. This project will include the installation of new baby changing stations, bathroom counters, product dispensers, and a public drinking water fountain station will be installed exterior to each restroom.

2 OBJECTIVES

This project will totally rehabilitate the restrooms at the San Cristobal Outworks Guardhouse.

The contractor will be responsible for providing assessment, planning, engineering, compliance, and construction of the existing restrooms. The existing restroom infrastructure continually fails and clogs. All the sewage piping and venting are inadequate for the public restroom and must be investigated and replaced.

This project will include completely removing and replacing all mentioned equipment in this SOW. The work shall rehabilitate the historic structure while protecting historic fabric.

3 PLACE OF PERFORMANCE

Street Address: San Juan National Historic Site, NPS

511 Calle Norzagaray, San Juan, Puerto Rico, 00901

San Cristobal Outworks Guardhouse Location (18.46770°N, 66.10785°W).

4 PERIOD OF PERFORMANCE

The work in this SOW shall be completed in accordance with the following schedule:

Construction:

Construction shall not begin until the Contracting Officer has issued the Notice to Proceed.

Construction shall be completed no later than 365 calendar days after Notice to Proceed.

As-Constructed Drawings:

As-Constructed Drawings completed no later than 30 calendar days after Substantial Completion.

All Shop Drawings and As-Constructed Drawings shall be submitted to the COR.

5 SCOPE AND GENERAL REQUIREMENTS

This project will consist of the rehabilitation of two (2) public restrooms (Men’s and Women’s Restroom) and the storage room located in the San Cristobal Outworks Guardhouse. Proposals shall include all costs related to fees, permits, licenses, insurance, bonds, and all other costs from the contractor to complete the work.

BASE BID – SAN CRISTOBAL OUTWORKS GUARDHOUSE

CONTRACT LINE-ITEM NO. 1 – PRE-CONSTRUCTION PLANNING AND

DEVELOPMENT: This item consists of product datasheets, shop drawings, and records of detailed analysis. The bathroom flow and layout shall not change. This project shall include providing data sheets for all products used, schematic drawings, color palettes, ergonomic recommendations, ADA engineering considerations, layout plans, and as-constructed drawings for documentation of the rehabilitation.

CONTRACT LINE-ITEM NO. 2 – STORAGE ROOM AND RESTROOMS DEMOLITION:

This item consists of the demolition of the existing storage room, male, and female restrooms in the San Cristobal Outworks Guardhouse. Price shall cover the cost of labor, tools, equipment, material, and performing all operations in connection with the disconnection of the existing infrastructure, removal from the building and fort, transportation, and proper disposal offsite.

Includes demolition and removal of materials in storage room and restrooms, which includes but is not limited to plumbing, piping, electrical conduit and cables, grout, thinset, toilets, urinals, mirrors, sinks, fixtures, lighting, partitions, tiles (floor and wall), hand dryers, toilet paper dispensers, and paint. This item also includes mobilization, costs of preparatory work and operations, including but not limited to, those necessary for the movement of personnel, equipment, supplies, materials and incidentals to the project site, site facilities necessary for the work on the project, traffic control, all other work necessary for the completion of the project.

CONTRACT LINE-ITEM NO. 3 – STORAGE ROOM AND RESTROOMS

REHABILITATION:

This item consists of the construction and rehabilitation of the storage room, male, and female restrooms at the San Cristobal Outworks Guardhouse. Price shall cover the cost of labor, tools, equipment, material, and performing all operations in connection with the rehabilitation of the storage room and public restrooms in accordance with the written specifications. Includes installation of water and sewer piping, electrical cables and conduits, toilets, urinals, mirrors, sinks, fixtures, lighting, partitions, tiles (floor and wall), hand dryers, toilet paper dispensers, paint, baby changing stations, bathroom counters, product dispensers, and public drinking water fountains. Also includes cleaning, repairing, and repainting the ceiling. This item also includes mobilization, costs of preparatory work and operations, including but not limited to those necessary for the movement of personnel, equipment, supplies, materials and incidentals to the project site, site facilities necessary for the work on the project, traffic control, and all other work or costs necessary for the completion of the project, inspections, testing, system startup, project closeout, punch lists, final cleanup and demobilization from the project site upon completion of work.

6 DELIVERABLES:

A. Product Submittals (with product literature such as data, cut sheets, and information) B. Special Inspections C. Submit in native and PDF formats electronic copies of the 100% Complete As-Constructed

Drawings.

An acceptable Schedule of Values shall be agreed upon by the Contractor and Contracting Officer before the first progress payment is processed.

7 GOVERNMENT FURNISHED PROPERTY:

N/A

8 SAFETY:

Accident Prevention Program: Prior to the Preconstruction Meeting submit a tailored accident prevention plan. The plan must be accepted by the NPS before any on site work can begin. The plan shall comply with OSHA and project requirements. Please include the name of responsible supervisor to carry out the plan; monthly safety meetings; first aid procedures; outline of each phase of work, hazards associated with each phase and methods proposed to ensure property protection, and safety of the public, National Park Service staff and Contractor employees;

training; planning for possible emergency situations; housekeeping and fire protection.

Accident Reporting: Reportable accidents, defined as death, occupational disease, traumatic injury to contractor’s personnel, NPS employees or the public, property damage of any accident more than $100 and fires, must be reported immediately to the Contracting Officer and park’s

COR.

Ensure that all employees are physically qualified to perform their assigned duties in a safe manner. Do not allow employees to work if their abilities are impaired. Operators of all equipment shall be able to understand signs, signals, and operating instructions, and be capable of operating such equipment.

Ensure to comply with:

A. First aid facilities.

B. Personnel protective equipment: Meet requirements of NIOSH and MSHA.

C. Emergency instructions, including telephone numbers and reporting instruction for ambulance, physician, hospital, fire department and park police. Place in conspicuous locations at the worksite D. Adequate egress always in accordance with the Standard for Safeguarding

Construction, Alteration, and Demolition Operations (NFPA 241).

E. Fall protection plan F. Hard hats for all employees.

G. Designate and post signs in all hardhat areas.

Training: Provide training for first aid and hazardous material handling and storage.

Waste Management - Employ processes that ensure the generation of as little waste as possible.

Waste disposal in landfills shall be minimized. All material unsuitable for recycling must be disposed of, in a legal manner, at public or private dumping areas outside the park in accordance with Federal disposal regulations. Develop and implement in accordance with ASTM E1609 and as required in the contract documents. The plan shall include (but not be limited to) the following:

List of the recycling facilities, reuse facilities, municipal solid waste landfills, and other disposal area(s) to be used. Include name, location, and phone number.

List of proposed materials to be reused or recycled.

List of materials that cannot be recycled or reused.

Storage and collection methods of waste and recyclables, handling procedures.

Air and Water Pollution Control - Air quality impacts are expected to be temporary and localized. To reduce tailpipe emissions, construction equipment shall not be left idling any longer than is necessary for safety and mechanical reasons. Take all necessary reasonable measures to reduce air and water pollution by any material or equipment used during construction. Keep volatile wastes in covered containers.

Cultural Resources - An archeological monitor may be present at the work site. If archeological resources are damaged at the project site while the archeological monitor is present or absent, all work directly affecting the discovery must stop immediately, and the damage must be reported to the COR. Contractor shall move on to work on other portions of the scope that do not directly affect the archaeological discovery with the approval of the COR.

9 SECURITY CONSIDERATIONS:

Construction sites will be limited to the smallest feasible area. Ground disturbance and site management will be carefully controlled to prevent undue damage to vegetation, soils, and archeological resources and to minimize air, water, soil, and noise pollution.

Staging is limited in or near the construction area. Construction equipment and material storage shall be in previously disturbed areas near the construction site. All staging areas shall be returned to pre-construction conditions once construction is complete.

Site Access - Contractor properly identified employees will be the only ones allowed on site and shall comply with Federal Code of conduct during work hours.

Construction zones shall be fenced with approved construction barrier fencing, plastic or portable fencing, before any construction activity. The fencing shall define the construction zone and confine activity to the minimum area required for construction. Workers will be instructed to avoid conducting activities beyond the construction zone as defined by the construction zone fencing.

Parking of vehicles shall be limited to existing roads, in legally designated areas, and within approved staging area(s). Confine all operations to work limits of the project. Prevent damage to natural surroundings. Restore damaged areas outside the work limits, repairing or replacing damaged grass at no additional expense to the National Park Service. Vehicles shall not be parked and running simultaneously on grass areas of the Outworks for more than 5 minutes consecutively.

10 TRAVEL:

N/A

11 SPECIAL MATERIAL REQUIREMENTS:

N/A

12 OTHER UNIQUE REQUIREMENTS & CONSIDERATIONS:

Disruptions of services shall be kept to a minimum. All disruptions shall be arranged at least 48 hours in advance with National Park Service and must be approved by Contracting Officer.

Construction procedures will prevent accidental disruptions to facilities outside the project limits by investigation of existing utilities and protection during construction: accidental disruptions shall be remedied at no cost to National Park Service.

Hauling Restrictions - Comply with all legal load restrictions in the hauling of materials.

Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent.

Weather Protection - When inclement weather is expected, provide temporary protection, for areas where roofing, siding, windows, doors or other enclosing elements have been removed or have not been installed. Inspect protective coverings frequently to ensure that they are functioning properly.

Field Eng. Work - The contractor shall set initial construction layout establishing lines, slopes, grades, reference points, base lines and bench marks as required. All existing survey control utilized for this project shall be preserved. Controls that are destroyed by the contractor shall be replaced by the contractor at their expense.

Project Records- Maintain one complete full-size set of contract specifications. Clearly mark changes, deletions, and additions to show actual constructed conditions.

As-Constructed Drawings - Provide as-constructed drawings. Include contract modifications; and other applicable shop drawings, sketches, and data.

Installed Equipment - Furnish operating instruction attached to or posted adjacent to equipment.

Include wiring diagrams, control diagrams, control sequence, start-up adjustment, operation, lubrication, shutdown, safety precautions, procedures in case of equipment failure and other items of instruction recommended by manufacturer.

Cleaning - Before scheduling the final inspection, remove all tools, equipment, surplus materials, and rubbish. Restore or refinish surfaces that are damaged due to work of this contract to original condition. Remove grease, dirt, stains, foreign materials, and labels from finished surfaces.

Thoroughly clean building interiors. Pick up and remove all construction debris from the site. At time of final inspection, project shall be thoroughly clean and ready for use.

Operation and Maintenance Data - Provide electronic copies to the COR for review, prior to the final inspection. Data shall include manufacturer's standard literature, equipment data sheets, as-constructed drawings; custom written data not included in manufacturer’s standard literature;

schedules, warranties, parts lists, test results, and subcontractor list.

Substantial Completion and Final Inspection - Submit written certification to the CO and COR that the project, or designated portion of project, is substantially complete, and request a final inspection. Upon receipt of written request that project is substantially complete, the Contracting Officer will proceed with inspection within 10 days of receipt of request or will advise the Contractor of items that prevent the project from being designated as substantially complete.

When work is determined to be substantially complete, a list of deficiencies ("Punch List") to be corrected before final acceptance might be prepared. The Contracting Officer will issue a Letter of Substantial Completion. If work is not determined to be substantially complete, the Contracting Officer will notify the contractor in writing. After completing work, the contractor shall resubmit certification and request a new final inspection.

Acceptance of the work - After all deficiencies have been corrected, the Contracting Officer will issue a Letter of Final Acceptance.

13 QUALITY ASSURANCE REQUIREMENT

The contractor shall develop and maintain a written quality control plan to ensure services are performed in accordance with commonly accepted commercial practices. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. At a minimum the contractor shall develop quality control procedures addressing the critical areas identified in this statement of work. The government will periodically evaluate the contractor’s performance in accordance with the statement of work. All new equipment must conform to the manufacturer’s instructions and guidelines for installation and start-up.

While performing work, the contractor shall comply with the latest applicable versions of the following:

Federal, State and Local Codes, Standards and Policies for Environmental Protection Authority requirements.

Occupational Safety and Health Administration (OSHA) requirements.

Shall meet Secretary of Interior Standards for Historic Preservation and follow Section 106 National Historic Preservation Act (NHPA)

NPS Reference Manual 10A and 10B

The quality of all work shall be the responsibility of the Contractor. Testing, if required, shall be the responsibility of an independent testing laboratory. Inspect and test all work as needed to ensure that the quality of materials, workmanship, construction, finish, and functional performance is following applicable specifications and drawings. All affected areas must be restored to their original condition from before the work began. Any damages will be fixed and repaired at no cost to the government. Any damage to floor, or walls will be the contractor’s responsibility to repair to match existing materials.

PERSONNEL

Contracting Officer: TBD

Contracting Officer Representative (COR): TBD

Park Facility Manager: TBD

14 PERFORMANCE REQUIREMENTS

The storage room and restroom have lost their original architectural and historical significance.

In recognition of the significance of this building, the renovation of the restrooms shall attempt restore the historical architectural character of the building while replacing antiquated and outdated utility infrastructure, upgrading structural systems, and enhancing the historic finishes of the structure to meet the current needs of the building users both inside and out. At every point in the work the historic character of the structure must be a primary concern. Through the project area, the contractor shall maintain all the historic fabric. The contractor shall give special attention to proposing engineering elements, which better integrate with the historic character of the fort.

New plumbing, mechanical, and electrical systems will be hidden within the interstitial spaces and visible components will engineered to integrate with the historic finishes. The contractor shall restore original and period appropriate lighting.

This project will rehabilitate the storage room, women’s, and men’s restroom in the San Cristobal Outworks Guardhouse.

All work shall be installed per the manufacturer’s recommendations.

14.1 Delivery, Storage and Handling

If units are shipped via commercial freight, open crates and inspect each slab in the presence of the driver. Note all damage, and do not accept shipment if damage is present. Claims due to shipping damage must be submitted to the freight carrier.

Handle, transport, and store units to prevent damage to materials or structure. Handle with care to prevent damage to corners and edges.

14.2 Accessibility

The rehabilitation of the San Cristobal Outworks Guardhouse storage room and restrooms is not scheduled to meet accessibility standards. Clearances at the historic structures do not allow for feasibly meeting minimum accessibility dimensions. Accessibility considerations for stalls, toilets and bottle fillers shall be considered without affecting the flow and layout of the restrooms.

14.3 Elements and Products

This project includes the rehabilitation of the San Cristobal Outworks Guardhouse ’s storage room and restrooms.

A. Water Piping B. Sewer Piping and Venting C. Electrical D. Counters E. Toilets and urinals F. Mirrors and Sinks (All in one soap, water, and dryer) G. Fixtures H. Lighting I. Partitions J. Tiles (Floor and Wall) K. Hand Dryers L. Toilet Paper Dispensers M. Baby Changing Stations N. Historic Masonry and Painting O. Water Fountains P. Ceiling Rehabilitation Q. Product Dispenser

14.4 Water Piping

A. The contractor shall replace all the water piping from the water service connection exterior of the wall of the restroom and throughout the restroom.

B. All plumbing will be the same size or larger.

C. All water piping shall be copper.

D. All water piping shall be installed in accordance with Section 220500 - COMMON

WORK RESULTS FOR PLUMBING

14.5 Sewer Piping and Venting

A. The contractor shall replace all sewer and vent piping throughout the restrooms and to within 3 feet of the restroom.

B. All water piping shall be installed in accordance with SECTION 221316 -

SANITARY WASTE AND VENT PIPING

C. All piping will be the same size or larger.

D. There is to be a cleanout at each urinal. Cleanouts shall be turned into the public space.

E. The contractor shall not use any sewer pipe bends greater than 45o.

F. All sewer pipes shall be a minimum 4-inchs below concrete (wall or floor). And all combined sewers shall be a minimum 6-inches.

G. At least one floor drain shall be installed in each restroom, more if layout dictates.

H. Flush-mounted hose bibb, with stainless steel cover, should be located under sink for custodial use 18” above the finish floor – provide key stops.

I. Only approved integrated drains and tailpieces shall be used.

J. Only approved three-piece, main, branch, riser and drain valves full port with stainless steel ball and stem shall be used.

14.6 Electrical

A. The contractor shall replace all the electrical cabling and conduit within the restroom and provide new cabling to the nearest junction box or panel outside the restroom.

B. Contractor shall replace all electrical exit signs with LED exit signs.

C. All electrical shall be installed in accordance with SECTION 260500 – COMMON

WORK RESULTS FOR ELECTRICAL.

D. At least one (1) convenience GFCI electrical outlet will be provided in at least one (1)

ADA stall and one (1) above each diaper changing station.

E. Provide one (1) convenience GFCI electrical outlet in plumbing service chase at each end of fixture banks to power maintenance equipment.

F. Electrical equipment will not be in any Custodial Room, Restroom, or any other wet room.

14.7 Countertops

A. The contractor shall install new counter tops.

B. Thickness may vary.

C. Bradley Wash Bar with Undermount Lavatory shall be integral to countertop.

D. All countertops shall be installed in accordance with SECTION 123600 –

COUNTERTOPS.

E. This project includes the templating, fabrication, and installation of Quartz countertops for public restrooms.

14.8 Toilets and urinals

A. New toilets will meet or exceed the salient characteristics of the existing toilets.

B. Vitreous China material or approved equal.

C. Elongated bowl.

D. Skirted Trapway that will facilitate cleaning around the toilets.

E. Urinals shall be replaced.

F. Toilets and urinals shall be mounted to walls and controlled with hand flushing.

14.9 Sinks

A. All in one: Bradley Wash Bar with Undermount Lavatory or COR approved equal.

B. Sinks shall be integral to the countertops.

C. Each sink shall have a mirror installed directly above.

D. Mirrors should be installed to not have a direct reflective view of the stalls.

E. Includes all necessary power outlets, water, and drainage modifications necessary for manufacturers recommended installation procedure.

F. Mop sinks in storage room shall be replaced. Plastic or Ceramic One Compartment Floor

Mop Sink with Notched Front - 24" x 24" x 12" Bowl or COR approved equal.

G. Shall replace dual wall hose faucet.

14.10 Fixtures

A. All fixtures shall be replaced in-kind.

B. All new fixtures will be corrosion resistant.

C. All new fixtures will function similarly to the existing fixtures.

14.11 Lighting

A. General illumination lighting in public restrooms shall be LED lights.

B. Lighting shall provide a minimum 120 lumieres everywhere in the restrooms.

Supplemental lighting in the public restrooms may be provided by wall washers or cove lights at the back of the toilet compartments, above the urinals, and above the wash basins. Wall washers or cove lighting provides functioning task lighting while making the walls brighter, thereby providing a more inviting environment.

C. Provide easy access to bulbs for replacement over time. Particularly where lights are concealed behind a plane such as a mirror, make sure the lights can be re-moved without removing the mirror or surface itself.

D. Lights at coves should be operated with remote drivers for easier maintenance E. Continuous, wall to wall, indirect linear lighting will be installed above all lavatories, water closets, urinals, and feature walls as the primary means of illuminating these areas.

F. All other required lighting will be fully recessed in the ceiling.

G. Self-illuminating mirrors, mirror edge lighting, wall sconces, or candelabra fixtures will not be used.

14.12 Partitions

A. Partitions shall at a minimum meet the same size and scale as the existing partitions.

B. Toilet partitions will be patterned stainless steel or COR approved equal.

C. Typical toilet stalls in new construction and in new restroom layouts in existing structures where space permits will be 3’-6” x 6’-6” as shown in Figure 1.8B.

D. Ambulatory and accessible stall widths will be sized to meet the applicable code requirements. In existing structures where spatial constraints do not permit the above, code requirements will govern.

E. To limit partition racking, additional floor pedestal supports will be provided every 2-3 stalls.

F. Contractor to provide toilet partitions plans that provide a solid anchorage of the partition system based on the number of stalls, ceiling heights, partition construction, material, and hardware.

G. Locked partition doors shall be removable by lifting the door up and off the hinges with special tools. Doors at unoccupied stalls shall be held partially open (approximately 30 degrees) in a consistent and uniform position and shall open into the stall, except at accessible stalls, where the doors shall swing out.

H. Coat hooks shall be installed inside of each compartment wall at centerline and 6 inches below top of door except at accessible stalls where the maximum is 48” above finished floor. Coat hooks shall bear at least 15 lbs.

I. Clearance between toilet partitions/panels and wall surfaces, panels, or pilasters shall be limited to a tolerance of ¼” – ¾”.

J. Stainless Steel ADA-compliant grab bars K. Cantilevered fin-style screens are required between urinals and shall be fabricated of the same material as the compartments. Screens shall have a radius top edge to avoid placement of items on the edge of the screen. Urinal screens should be provided to match toilet partitions.

L. Toilet partitions and urinal screens are required to be fastened to the walls and other panels using continuous brackets. The brackets must equal the height of the partitions and urinal screens.

M. ADA toilet stall doors shall provide a clear width opening for a 42” wide wheelchair.

14.13 Tiles

The contractor is responsible for removal and replacement of all the existing floor and wall tiles.

Location of tiling shall at a minimum match the existing location of tiling. Contracting is responsible for repairing and patching subgrade of tiles to get good cohesion to the substrate and meet sloping requirements.

14.13.1 FLOOR TILES

A. Finished floor and wall assemblies shall be ceramic tile. (exception may be glass mosaic tiles or other approved accent finishes).

B. Floor finish shall be no less than 24” x 12” (exception may be glass mosaic tiles or other approved accent finishes).

C. Floor and wall tile color schemes shall be coordinated. Color schemes shall be approved by the COR.

D. Finish floor assembly shall be set on a conventional Portland cement mortar installation with a waterproof membrane over the floor substrate. The waterproof membrane shall extend to the wall structure for at least 3 feet high behind all wall hung plumbing fixtures and 12” high for walls without plumbing fixtures.

E. Floor finishes shall be durable and non-slippery.

F. Floor joints shall be less than ¼” and sealed with an approved 100% solid epoxy grout product.

G. Floor finish will have positive slope to floor drain(s).

H. Floor surfaces shall slope to the floor drain.

I. Floor drains shall not be located within any compartment or under any counter and shall be located as close to the center of the restroom as possible.

J. All exposed concrete floors will be smooth and have a high performance, waterproof polyurethane sealant that is chemical resistant, and abrasion resistant.

K. Waterproof membrane at finished floors shall extend up the wall structure for at least 3 feet high behind all walls hung plumbing fixtures and 12 inches high for walls without plumbing fixtures.

L. Care must be taken in laying out floor slopes so that code-required counter heights and clearances are maintained at all locations.

M. Floor drains shall be engineered to fit in the space of a single tile or center to the crossing of joints.

N. Floor drains to be bronze or stainless steel to coordinate with color of flooring.

O. The opening of floor drains shall be minimized to avoid small items from being dropped in the opening.

P. Floor drains shall be self-priming.

Q. Floor drains shall be removable with special tools for maintenance and repair purposes.

14.13.2 WALL TILE

A. Wall finish joints shall be no larger than 1/8”. Only 100% solid epoxy shall be used to seal joints.

B. Wall finish shall be no less than 6” x 6” (exception may be glass mosaic tiles or other approved accent finishes).

C. Wall tile finish assembly will be per the specifications provided in Section 09 30 00 of the Guide Specifications.

D. Wall field tile will be ceramic tile laid up in a horizontally balanced and consistent pattern from corner to corner and bottom to top. Rectangular tiles will be laid horizontally. Horizontal stack bond pattern is preferred. Wall field tile will start with a full tile above the wall base tile.

E. Wall field tile will be square or rectangular with no dimension less than 6”.

F. Glass Tile will be square or rectangular and with no dimension less than 4”. Size and bond pattern of glass tile will match the field tile pattern where possible and course out with field tile in all cases.

G. If accent tile is used, it will be above 60”. If accent tile is not used, wall field tile will run to ceiling to a minimum 6 feet above the floor. No exposed wall finishes will be painted gypsum board.

H. Tile grout will be epoxy and white for all wall tile applications.

I. Colored accent tile will only be used above urinals where urinals and water closets are on a common wall. In such cases, the ledges and accent color tile will be consistent from inside corner to inside corner.

J. Stainless Steel (306, No 6 Finish) flush corner guards will be used at all outside corner of all tile walls from top of wall base to ceiling. At the end of tiled partitions, single stainless steel end cap installed flush to the surface of the tile can be used in lieu of two flush corner guards.

K. Wall finish assembly shall be 6-feet or match existing, whichever is more.

L. Wall base shall be one-piece cove tile to avoid water or small debris trapped at wall-floor joint.

M. Wall floor assembly shall be set on a conventional Portland cement mortar installation with a waterproof membrane over the substrate.

N. Stainless Steel corner guards shall be provided at all outside corners. The top of the corner guard shall be no less than 42” above finish floor (AFF). Corner guard shall be installed above the base tile.

O. Backing shall be provided on all walls for dispensers, receptacles, partitions, countertops, and fixtures.

14.14 Hand Dryers

A. Part of all in one: Bradley Wash Bar with Undermount Lavatory or COR approved equal.

14.15 Toilet Paper Dispensers

A. Shall be Twin Jumbo Toilet Paper Dispenser .

B. Bradley Corp: Model 5425 Jumbo Dual Roll Toilet Paper Dispenser or COR approved equal.

14.16 Baby Changing Stations

A. Each restroom shall be equipped with baby changing station. Contractor shall install a prefabricated baby changers which fold out of the wall, equivalent to Koala Bear, because there is not sufficient space for fixed type. The prefabricated baby changers should be the type with stainless steel door and flange.

B. Vertical Changing Station: KB311-SSWM Stainless Steel or COR approved equal.

C. Horizontal Changing Station: KB310-SSWM Stainless Steel or COR approved equal.

14.17 Historic Masonry and Painting

A. Contractor shall provide a color palette for restrooms. COR shall approve color recommendations from contractor.

B. Restrooms colors will be limited to three (3) distinguishable values of white to grey color scale (preferably warm grey), a single accent color in specific locations and natural finished stainless steel.

C. Restroom Vestibule/entry walls will be the darkest and richest value (i.e., Dark Grey).

Floors and bases are to be the middle value (i.e., Medium Grey). Ceilings, wall field tile and lavatory/counters will be the lightest value (i.e., White).

D. Accent colors are to be a single hue or color of glass tile and are limited to above the water closets and on feature walls defined as single plane walls without openings, fixtures, or accessories.

E. Each restroom is limited to (1) one color.

F. All masonry and painting shall be installed in accordance with SECTION 090190

HISTORIC MAINTENANCE REPAINTING.

14.18 Water Fountains

A. The contractor shall install a Stainless-Steel ADA Compliant Bottle Filler and Drinking Fountain Station for each restroom suitable for outdoor use.

B. Water fountain shall have a simple push button to function with less than 5lbs to operate.

C. Shall be engineered for frequent commercial and public use in an outdoor environment.

D. Shall include replaceable water filters and five replacement filters for water filtration.

E. Shall operate at water pressures between 30 and 80 psi.

F. Shall be wall mounted.

G. Shall be chrome powder coated.

H. Shall install (2) two new water fountains in both restrooms entrance. Shall be Elkay

LZSTL8WSLK Water Refilling Station, Bi-Level Reversible, W/Filter, Light Gray or COR approved equal.

I. Three existing water fountains in storage room shall be removed. One water fountain shall be replaced with a product dispenser (refer to 15.22 Product Dispenser). The other two water fountains shall be replaced with hose faucets.

14.19 Ceiling Rehabilitation

A. Shall power wash and remove calcium deposits.

B. Shall clean termite infected parts.

C. Shall remove all paint from support beams.

D. Shall apply wood hardener.

E. Shall patch with wood filler.

F. Shall sand the surface and eliminate any imperfections.

G. Apply primer and paint.

14.20 Product Dispenser

A. Shall install One Solution™ 4+2 Product Dispenser or COR approved equal in storage room.

B. Shall be compatible with equipment in El Morro and/or San Cristobal storage room product dispensers

C. Shall include SDS and equipment rack to house products for dispenser.

D. Shall include 2 bottles of each product connected to dispenser.

E. Shall make necessary water and drainage connections per manufactures recommendations.

15 Technical Requirements

Division 9 – Finishes

A. SECTION 090190 HISTORIC MAINTENANCE REPAINTING

B. SECTION 093000 - TILING

Division 12 – Furnishings

C. SECTION 123661.19 – QUARTZ COUNTERTOPS

Division 22 – Plumbing

D. SECTION 220500 - COMMON WORK RESULTS FOR PLUMBING

E. SECTION 221116 - DOMESTIC WATER PIPING

F. SECTION 221313 - FACILITY SANITARY SEWERS

G. SECTION 221316 - SANITARY WASTE AND VENT PIPING

Division 26 – Electrical

A. SECTION 260500 - COMMON WORK RESULTS FOR ELECTRICAL

B. SECTION 260923 - LIGHTING CONTROL DEVICES

C. SECTION 262726 - WIRING DEVICES

D. SECTION 265000 - LIGHTING

SECTION 090190 HISTORIC MAINTENANCE REPAINTING

PART 1 - GENERAL

1.1 Section Includes

A. Removing paint B. Patching substrates C. Repainting surfaces

1.2 ASTM standards to consult

A. Standard Specifications

1. C 87 Test method. Determination of the effect of the organic impurities of the fine aggregate on the resistance of the mortar.

2. C 136 Test method. Granulometric analysis of fine and coarse aggregates.

3. C 142 Test method. Determination of clay and friable particles.

4. C 404 Aggregates for masonry grating.

5. D 75 Practice for the sampling of aggregates.

6. C 40 Test method for Organic Impurities

7. C 979 Specification for Pigments

8. C1489 Standard Specification for Lime Putty for Structural Purposes, finish lime, lime putty, masonry, plaster, plasticity, popping and pitting, residue, stucco,

9. C144 Standard Specification for Aggregate for Masonry Mortar

10. C 5 Specification for Quicklime for Structural Purposes

11. C150 Specification for Portland Cement

12. E2260 Guide for Repointing (Tuck-pointing) Historic Masonry

13. American Standards (USA)

14. ASTM C219 - 76a - Standard Definition of Terms Relating to Hydraulic Cement

15. ASTM C114 - 81 - Standard Methods of Chemical Analysis of Hydraulic Cement

16. ASTM C270 - Mortar for Masonry

17. ASTM C1324 - Analysis of Hardened Mortar

18. Standard Specifications

19. ASTM C5 - 79 - Quicklime for Structural Purposes

20. ASTM C25 - 81 - Methods of Chemical Analysis of Limestone, Quicklime and Hydrated Lime

21. ASTM C110 - 76a - Methods of Physical Testing of Quicklime, Hydrated Lime, and Limestone

22. ASTM C141 - 67 (78) - Hydraulic Hydrated Lime for Structural Purposes

23. ASTM C206 - 79 - Finishing Hydrated Lime

24. ASTM C207 - 79 - Hydrated Lime for Masonry Purposes

25. ASTM C593 - 76a (81) - Fly Ash and Other Pozzolans for Use with Lime

26. ASTM C821 - 78 - Lime for use with Pozzolans

27. ASTM C6 - 49 (74) - Normal Finishing Hydrated Lime

28. ANSI/ASTM C10 - 76 - Natural Cement

29. ASTM C50 - 27 (52) - Methods of Sampling, Inspection, Packing and Marking of Quicklime and

Lime Products

30. ANSI/ASTM C51 - 71 (76) - Definitions of Terms Relating to Lime and Limestone

31. ANSI/ASTM C144 - 76 - Aggregate for Masonry Mortar

32. ASTM C191 - 52 - Method of Test for Time of Setting of Hydraulic Cement by Vicat Needle

1.3 Submittals

A. Product Data:

1. Submit for each type of binder: Product data sheets.

2. Storage and shipping requirements information.

3. Manufacturer’s climate requirements for installation and curing.

B. Aggregate (sand):

1. Sieve analysis.

2. Aggregate void ratio.

3. Source location description.

C. Lime Paint:

1. Paint colors and manufacturer.

2. Samples for verification with texture to simulate actual conditions.

D. Lime Based Patching Material:

1. Material manufacturer and product

2. Samples for verification of compatibility to historic walls material.

1.4 Quality Assurance

A. Contractor Qualifications: Utilize personnel experienced in masonry restoration to perform the work of this Section. Individuals shall have successful experience in comparable masonry restoration Projects similar in material and extent to that indicated for this Project.

B. Field Inspection: Patching material shall be inspected prior to applying by the COR or NPS mason determined by the COR.

C. The quality of the patch repairs needs to be examined and approved before painting by the COR or NPS mason determined by the COR, patching deficiencies will be difficult to locate once paint is applied.

PART 2 - PRODUCTS

2.1 Mortar Materials

A. Restaura Natural Hydraulic Lime: CALIX NHL 3.5 white or approved equal.

1. Must be cured for one (1) year minimum.

2. COR or NPS mason determined by the COR shall verify the consistency of the hydraulic lime to assure the product has been cured for one (1) year minimum.

3. If the Park determines that the hydraulic lime has not been cured for sufficient time, the park shall agree to a one-to-one exchange of the contractor’s hydraulic lime with the park's sufficiently cured hydraulic lime given the quantity and quality of the products are equal.

4. The one-to-one exchange shall be at no cost to the Park nor contractor.

B. Sand: Must originate from a fresh water river sand. Ocean sand will not be accepted.

C. Water: Clean, clear, potable water.

D. Pigments: Not required and not permitted unless mortar analysis reveals the presence of pigments in the historic mortars.

2.2 Paint

A. Restaura Lime Paint: Enc. #1 White Pastel B - 40366 or approved equal.

B. Fabricated for the restauration or preservation of historic structures.

PART 3 - EXECUTION

3.1 Removing Paint

A. Remove all paint on walls.

B. Scraping shall be done in a manner that protects and preserves the historic interior.

3.2 Patching Mortar

A. Binder: (Natural Hydraulic Lime & Water) shall be mixed as per manufacturers recommendations.

B. Aggregate: (River Sand).

C. Binder / Aggregate = 1 part / 3 parts (in volume).

D. Do not proceed with patching until the COR or NPS mason determined by the COR examines and approves mortar patching material mix.

E. Patch only necessary areas (gouges and/or holes).

F. Surfaces to be patched must be clean, dry, and in sound condition.

G. Patching shall create a smooth finish between the repair and the surrounding surface.

H. Protect all adjacent interior surfaces and areas from patching operations and damage with drop cloths, shields, masking, templates, or other suitable protective means and correct any damage caused by failure to provide such protection.

I. Patching defects shall be corrected at no extra cost.

3.3 Repainting surfaces

A. Prior to commencement of work of this section, thoroughly examine all conditions and surfaces scheduled to be painted and report to the Contractor any conditions or surfaces that will adversely affect work of this section.

B. Patched surfaces must have previous curing time of 24-hours prior to painting unless approved by the

COR.

C. No painting work shall commence until all such adverse conditions and defects have been corrected and surfaces and conditions are acceptable to the Contractor.

D. Remove and securely store all miscellaneous hardware and surface fittings prior to painting. Carefully clean and replace all such items upon completion of painting work in each area.

E. Paint entire bathroom walls and ceiling, patched areas must be completely dry before painting.

F. Protect all adjacent interior surfaces and areas from painting operations and damage with drop cloths, shields, masking, templates, or other suitable protective means and correct any damage caused by failure to provide such protection.

G. Substrate painting defects shall be corrected by the painter at no extra cost.

H. Apply paint within an appropriate time frame in a workmanlike manner using skilled and trade qualified applicators as noted under Quality Assurance.

END OF SECTION 090190

SECTION 093000 - TILING

PART 4 - GENERAL

4.1 SUMMARY

A. Related Documents:

1. Drawings and general provisions of the Subcontract apply to this Section.

2. Review these documents for coordination with additional requirements and information that apply to work under this Section.

B. Section Includes:

1. Ceramic tile and related items necessary to complete the Project as indicated on the Drawings and specified herein. This Section also includes:

a. Tile for floor applications.

b. Tile for wall applications.

c. Ceramic accessories.

d. Ceramic trim.

e. Non-ceramic trim for walls.

4.2 REFERENCES

A. General:

1. The following documents form part of the Specifications to the extent stated. Where differences exist between codes and standards, the one affording the greatest protection shall apply.

2. Unless otherwise noted, the referenced standard edition is the current one at the time of commencement of the Work.

3. Refer to Division 01 Section "General Requirements" for the list of applicable regulatory requirements.

B. ANSI American National Standards Institute:

1. ANSI A108 Series (A108.01,.02,.1A,.1B,.1C,.4,.5,.6,.8,.9,.10,.11,.12,.13,.14,.15,.16, and.17):

Specifications for Installation of Ceramic Tile

2. ANSI A118.1 Specifications for Dry-Set Portland Cement Mortar

3. ANSI A118.3 Specifications for Chemical Resistant Water Cleanable Tile-Setting and Grouting

Epoxy and Water Cleanable Tile-Setting Epoxy Adhesive

4. ANSI A118.4 Specifications for Latex-Portland Cement Mortar

5. ANSI A118.5 Specifications for Chemical Resistant Furan Mortars and Grouts for Tile Installation

6. ANSI A118.6 Specifications for Standard Cement Grouts for Tile Installation

7. ANSI A118.7 Specifications for Polymer Modified Cement Grouts for Tile Installation

8. ANSI A118.9 Test Methods and Specifications for Cementitious Backer Units

9. ANSI A118.10 Specifications for Load Bearing, Bonded, Waterproof Membranes for Thin-Set

Ceramic Tile and Dimension Stone Installations

10. ANSI A118.11 Specification for EGP (Exterior Glue Plywood) Latex-Portland Cement Mortar

11. ANSI A118.12 Specifications for Crack Isolation Membranes for Thin-Set Ceramic Tile and

Dimension Stone Installations

12. ANSI A136.1 Organic Adhesives for Installation of Ceramic Tile

13. ANSI A137.1 Specifications for Ceramic Tile

14. BAAQMD Regulation 8-51 - Adhesive and Sealant Products.

15. "Handbook for Ceramic Tile Installation", published by Tile Council of North America, Inc., latest eidition.

4.3 SUBMITTALS

A. Submit under provisions of Division 01 Section "General Requirements."

B. Product Data: Material Safety Data Sheets.

4.4 Samples:

A. Submit for approval of color, pattern and finish. Four samples each are required for each type, color and/or pattern selected and shall be submitted in sufficient size and quantity to portray overall range.

B. Where colored grouts are required (typical), submit with respective tiles for approval of color.

4.5 Closeout Submittals:

A. Material Safety Data: Submit 7 copies of sealant and adhesive quantity use for in accordance with requirements of BAAQMD Regulation 8-51.

B. Maintenance Data: Include recommended cleaning methods, cleaning materials, and stain removal methods.

C. Maintenance Materials: Furnish the following for Owner's use in maintenance of project.

D. Extra Tile: 10 square feet of each size, color, and surface finish combination

4.6 QUALITY ASSURANCE

A. Maintain one copy of and ANSI A108/A118/A136.1 and TCNA (HB) on site.

B. Tile Mock-Ups: Mock-up areas indicated on Drawings shall have ceramic floor and wall tile completely installed, grouted and cleaned. These mock-up areas shall be approved by the PARK before proceeding with any other tile work and shall establish the standard of appearance for subsequent work.

4.7 DELIVERY, Storage and handling

A. Deliver materials in manufacturer's original sealed containers with labels legible and intact identifying brand name and contents.

B. Tile cartons shall be grade sealed in accord with ANS A137.1.

C. Store materials under cover in a manner to prevent damage or contamination.

4.8 Environmental conditions

A. Install tile and installation materials when ambient temperature is at least 50 deg F (10 deg C) and rising.

4.9 EXTRA MATERIALS

A. Extra Stock: In addition to providing extra stock material, the Contractor shall provide a summary of finish products including Manufacturer Name, style number and color, local distributor's name address and phone number. This list shall be provided with close out documentation including as built and warranty information.

PART 5 - PRODUCTS

5.1 General Requirements:

A. Tile shall be Standard Grade and comply with requirements of TCA A137.1 with modifications as specified herein.

B. Ceramic mosaic tile is required to be furnished in "factory mounted" sheets in patterns and colors selected.

Unless otherwise specified, mounting is optional with tile manufacturer except that back-mounting shall comply with requirements of ANS A137.1 governing bond strength and mounting shall be recommended by tile manufacturer as suitable for the intended installation.

5.2 Quarry Tile: ANSI A137.1, standard grade.

A. Characteristics: As defined by the product indicated in Interior Finish Materials List on drawings.

5.3 Glass Tile: ANSI A137.2, standard grade.

A. Characteristics: As defined by the product indicated in Interior Finish Materials List on drawings.

B. Where not otherwise noted in the Tile Schedule on the Drawings, colors and patterns will be selected by the Architect after award of contract.

5.4 Tile: Ceramic tile required for the Project is scheduled on the Drawings as to manufacturer, type, size, thickness and color. Special patterns are so detailed.

5.5 Tile Trim Shapes and Bases:

A. Unless otherwise noted, trim units and shapes shall be of same type as the tile with which they are used and shall comply with TCA A 137.1.

Include bases, bullnoses, caps, coves, stops, angles, returns, trimmers and other shapes indicated or required to produce a completely finished installation. Trim shapes shall match tile in color and finish unless otherwise noted. Use surface type trim for thin-set installations.

B. Ceramic Trim: Matching bullnose, double bullnose, cove base, and cove ceramic shapes in sizes coordinated with field tile.

A. Applications: As follows unless otherwise indicated.

1. Open Edges and Outside Corners: Bullnose.

2. Inside Corners: Jointed.

3. Floor to Wall Joints: Cove base.

B. Manufacturers: Same as for tile. B.

C. Non-Ceramic Wall Transitions: Metal, style and dimensions to suit application, for setting using tile mortar or adhesive.

C. Finish and Material: Satin anodized aluminum and Satin nickel anodized aluminum D. Accessories: Manufactured connectors as applicable to conditions. Field fabricated miters are not acceptable.

E. Applications:…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .