Attachment 0014 - Economic Price Adjustment (EPA) Tables R2 13DEC.xlsx
XLSX spreadsheet 782 KB Posted
- Solicitation number
- W912CH-24-R-0017
- Issued by
-
Department of the Army
About this file
This document is an attachment titled "Economic Price Adjustment (EPA) Tables" for a federal contract opportunity under solicitation number W912CH-24-R-0017 for Compaction and Earthmoving Equipment Service Life Extension (SLEP) work.
The attachment provides pricing adjustment tables for a 10-year requirements contract to perform SLEP work on approximately 240 government-furnished construction and material handling vehicles. The contract will be a combination of Fixed Price with Economic Price Adjustment (FP with EPA) and Firm-Fixed Price (FFP) contract line items. The SLEP effort consists of a Core Effort that is common across all vehicles and an Additional Work Effort that is unique to each vehicle's condition. The contract will also include technology insertions, modifications, and incorporation of engineering changes over the 10-year period. The government intends to award this contract sole-source to Caterpillar Inc. of Peoria, IL, as they are the only source able to provide these services without unacceptable delay.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover
CUI
ATTENTION
Use this space to indicate categories, limited dissemination controls, special instructions, points of contact, etc., if needed.
Controlled by: PEO CS&CSS JPO JLTV Controlled by: PEO CS&CSS Classification Guide and JPO JLTV Classification Guide CUI Category(ies): Procure Limited Dissemination Control: DIST C POC: JPO JLTV Project Security Manager; (586) 239-3491
| ATTENTION | |
| All individuals handling this information are required to protect it from unauthorized disclosure. |
Handling, storage, reproduction, and disposition of the attached document(s) must be in accordance with 32 CFR Part 2002 and applicable agency policy.
Access to and dissemination of Controlled Unclassified Information shall be allowed as necessary and permissible to any individual(s), organization(s), or grouping(s) of users, provided such access or dissemination is consistent with or in furtherance of a Lawful Government Purpose and in a manner consistent with applicable law, regulations, and Government-wide policies.
Standard Form 901 (11-18) Prescribed by GSA/ISOO | 32 CFR 2002
CUI
Controlled by: DOA Controlled by: PEO CS&CSS, PM FP, PdM EMSE CUI Categories: CONTRACT, PROPIN Limited Distribution Control: FEDCON
POC:
Title
CUI
| Attachment 0014 |
| Economic Price Adjustment (EPA) Tables |
October 2023
CUI
Instructions
| Contract W56HZV-XX-D-XXXX | |
| Attachment 0014 Economic Price Adjustment (EPA) Tables | |
| 1 | All input cells are highlighted in yellow. |
| 2 | The Contractor shall not manipulate or alter any cells that are not highlghted in yellow in the attachment. |
| 3 | For the applicable ordering year, enter the most current index value (may be preliminary) as of the Effective Index Observation Date. |
| 4 | The attachment automatically calculates the adjustment amount, if any, according to the parameters of the clause in Section H.2. |
Order Year 2 (Base)
| CUI | ||
| Contract W56HZV-XX-D-XXXX | ||
| Attachment 0014 Economic Price Adjustment (EPA) Tables | ||
| Field | ||
| 1 | Applicable Contract Year: | Order Year 2 (Base) |
| 2 | Start of Ordering Period: | Mar/2024 |
| 3 | Effective Index Observation Date: | Dec/2023 |
| 4 | Index Risk Area: | Commercial Machinery Repair and Maintenance |
| 5 | Index Identifier: | PCU811310811310 |
| 6 | Baseline Index Value: | |
| 7 | Measurement Index Value: | |
| 8 | Index Percent Change: | ERROR:#DIV/0! |
| LOW UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0201 | 0203 | 0205 | 0207 | 0211 | 0213 | 0215 | 0217 | 0219 | |||||||||||||||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 613C Water Distributor | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 | Column8 | Column9 | Column10 | Column11 | Column12 | Column13 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| MEDIUM UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0201 | 0203 | 0205 | 0207 | 0211 | 0213 | 0215 | 0217 | 0219 | |||||||||||||||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 613C Water Distributor | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 | Column8 | Column9 | Column10 | Column11 | Column12 | Column13 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| HIGH UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0201 | 0203 | 0205 | 0207 | 0211 | 0213 | 0215 | 0217 | 0219 | |||||||||||||||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 613C Water Distributor | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 | Column8 | Column9 | Column10 | Column11 | Column12 | Column13 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| CUI |
Order Year 3 (Base)
| CUI | ||
| Contract W56HZV-XX-D-XXXX | ||
| Attachment 0014 Economic Price Adjustment (EPA) Tables | ||
| Field | ||
| 1 | Applicable Contract Year: | Order Year 3 (Base) |
| 2 | Start of Ordering Period: | Mar/2025 |
| 3 | Effective Index Observation Date: | Dec/2024 |
| 4 | Index Risk Area: | Commercial Machinery Repair and Maintenance |
| 5 | Index Identifier: | PCU811310811310 |
| 6 | Baseline Index Value: | 0.000 |
| 7 | Measurement Index Value: | |
| 8 | Index Percent Change: | ERROR:#DIV/0! |
| LOW UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0301 | 0303 | 0305 | 0307 | 0311 | 0313 | 0315 | 0317 | 0321 | 0323 | 0325 | 0327 | 0329 | 0331 | 0333 | |||||||||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| MEDIUM UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0301 | 0303 | 0305 | 0307 | 0311 | 0313 | 0315 | 0317 | 0321 | 0323 | 0325 | 0327 | 0329 | 0331 | 0333 | |||||||||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| HIGH UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0301 | 0303 | 0305 | 0307 | 0311 | 0313 | 0315 | 0317 | 0321 | 0323 | 0325 | 0327 | 0329 | 0331 | 0333 | |||||||||
| Field | Description | Rate | D7G Dozer w/Winch I | D7G Dozer w/Ripper II | 613C Scraper | 621B Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
CUI
Order Year 4 (Base)
| CUI | ||
| Contract W56HZV-XX-D-XXXX | ||
| Attachment 0014 Economic Price Adjustment (EPA) Tables | ||
| Field | ||
| 1 | Applicable Contract Year: | Order Year 4 (Base) |
| 2 | Start of Ordering Period: | Mar/2026 |
| 3 | Effective Index Observation Date: | Dec/2025 |
| 4 | Index Risk Area: | Commercial Machinery Repair and Maintenance |
| 5 | Index Identifier: | PCU811310811310 |
| 6 | Baseline Index Value: | 0.000 |
| 7 | Measurement Index Value: | |
| 8 | Index Percent Change: | ERROR:#DIV/0! |
| LOW UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0405 | 0407 | 0411 | 0413 | 0415 | 0417 | 0421 | 0423 | 0425 | 0427 | 0429 | 0431 | 0433 | 0435 | 0437 | 0439 | 0441 | 0443 | ||||||
| Field | Description | Rate | 613C Scraper | 621B Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924G Loaders | 924H Loaders | Dozer E / H Conversion | Column1 | Column2 | Column3 | Column4 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| MEDIUM UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0405 | 0407 | 0411 | 0413 | 0415 | 0417 | 0421 | 0423 | 0425 | 0427 | 0429 | 0431 | 0433 | 0435 | 0437 | 0439 | 0441 | 0443 | ||||||
| Field | Description | Rate | 613C Scraper | 621B Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924G Loaders | 924H Loaders | Dozer E / H Conversion | Column1 | Column2 | Column3 | Column4 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| HIGH UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0405 | 0407 | 0411 | 0413 | 0415 | 0417 | 0421 | 0423 | 0425 | 0427 | 0429 | 0431 | 0433 | 0435 | 0437 | 0439 | 0441 | 0443 | ||||||
| Field | Description | Rate | 613C Scraper | 621B Scraper | CS433C Vibe Rollers I & III | CS563C Vibe Roller II | 815HSC High Speed Compactor | Dual Steel Wheel Rollers (DSWR) | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924G Loaders | 924H Loaders | Dozer E / H Conversion | Column1 | Column2 | Column3 | Column4 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
CUI
Order Year 5 (Base)
| CUI | ||
| Contract W56HZV-XX-D-XXXX | ||
| Attachment 0014 Economic Price Adjustment (EPA) Tables | ||
| Field | ||
| 1 | Applicable Contract Year: | Order Year 5 (Base) |
| 2 | Start of Ordering Period: | Mar/2027 |
| 3 | Effective Index Observation Date: | Dec/2026 |
| 4 | Index Risk Area: | Commercial Machinery Repair and Maintenance |
| 5 | Index Identifier: | PCU811310811310 |
| 6 | Baseline Index Value: | 0.000 |
| 7 | Measurement Index Value: | |
| 8 | Index Percent Change: | ERROR:#DIV/0! |
| LOW UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0509 | 0521 | 0523 | 0525 | 0527 | 0529 | 0531 | 0533 | 0535 | 0537 | 0541 | 0543 | ||||||||||||
| Field | Description | Rate | 621G Scraper | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924H Loaders | Dozer E / H Conversion | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 | Column8 | Column9 | Column10 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| MEDIUM UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0509 | 0521 | 0523 | 0525 | 0527 | 0529 | 0531 | 0533 | 0535 | 0537 | 0541 | 0543 | ||||||||||||
| Field | Description | Rate | 621G Scraper | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924H Loaders | Dozer E / H Conversion | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 | Column8 | Column9 | Column10 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| HIGH UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0509 | 0521 | 0523 | 0525 | 0527 | 0529 | 0531 | 0533 | 0535 | 0537 | 0541 | 0543 | ||||||||||||
| Field | Description | Rate | 621G Scraper | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924H Loaders | Dozer E / H Conversion | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 | Column8 | Column9 | Column10 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
CUI
Order Year 6 (Option)
| CUI | ||
| Contract W56HZV-XX-D-XXXX | ||
| Attachment 0014 Economic Price Adjustment (EPA) Tables | ||
| Field | ||
| 1 | Applicable Contract Year: | Order Year 6 (Option) |
| 2 | Start of Ordering Period: | Feb/2028 |
| 3 | Effective Index Observation Date: | Dec/2027 |
| 4 | Index Risk Area: | Commercial Machinery Repair and Maintenance |
| 5 | Index Identifier: | PCU811310811310 |
| 6 | Baseline Index Value: | 0.000 |
| 7 | Measurement Index Value: | |
| 8 | Index Percent Change: | ERROR:#DIV/0! |
| LOW UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0609 | 0621 | 0623 | 0625 | 0631 | 0633 | 0635 | 0637 | 0641 | 0643 | ||||||||||||||
| Field | Description | Rate | 621G Scraper | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924H Loaders | Dozer E / H Conversion | Column11 | Column12 | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 | Column8 | Column9 | Column10 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| MEDIUM UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0609 | 0621 | 0623 | 0625 | 0631 | 0633 | 0635 | 0637 | 0641 | 0643 | ||||||||||||||
| Field | Description | Rate | 621G Scraper | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924H Loaders | Dozer E / H Conversion | Column11 | Column12 | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 | Column8 | Column9 | Column10 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| HIGH UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0609 | 0621 | 0623 | 0625 | 0631 | 0633 | 0635 | 0637 | 0641 | 0643 | ||||||||||||||
| Field | Description | Rate | 621G Scraper | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924H Loaders | Dozer E / H Conversion | Column11 | Column12 | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 | Column8 | Column9 | Column10 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | ||||||||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | |||||||||||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
CUI
Order Year 7 (Option)
| CUI | ||
| Contract W56HZV-XX-D-XXXX | ||
| Attachment 0014 Economic Price Adjustment (EPA) Tables | ||
| Field | ||
| 1 | Applicable Contract Year: | Order Year 7 (Option) |
| 2 | Start of Ordering Period: | Feb/2029 |
| 3 | Effective Index Observation Date: | Nov/2028 |
| 4 | Index Risk Area: | Commercial Machinery Repair and Maintenance |
| 5 | Index Identifier: | PCU811310811310 |
| 6 | Baseline Index Value: | 0.000 |
| 7 | Measurement Index Value: | |
| 8 | Index Percent Change: | ERROR:#DIV/0! |
| LOW UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0721 | 0723 | 0725 | 0731 | 0733 | 0735 | 0737 | 0741 | 0743 | |||||||||||||||
| Field | Description | Rate | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924H Loaders | Dozer E / H Conversion | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 | Column8 | Column9 | Column10 | Column11 | Column12 | Column13 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| MEDIUM UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0721 | 0723 | 0725 | 0731 | 0733 | 0735 | 0737 | 0741 | 0743 | |||||||||||||||
| Field | Description | Rate | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924H Loaders | Dozer E / H Conversion | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 | Column8 | Column9 | Column10 | Column11 | Column12 | Column13 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| HIGH UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0721 | 0723 | 0725 | 0731 | 0733 | 0735 | 0737 | 0741 | 0743 | |||||||||||||||
| Field | Description | Rate | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924H Loaders | Dozer E / H Conversion | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 | Column8 | Column9 | Column10 | Column11 | Column12 | Column13 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
CUI
Order Year 8 (Option)
| CUI | ||
| Contract W56HZV-XX-D-XXXX | ||
| Attachment 0014 Economic Price Adjustment (EPA) Tables | ||
| Field | ||
| 1 | Applicable Contract Year: | Order Year 8 (Option) |
| 2 | Start of Ordering Period: | Feb/2030 |
| 3 | Effective Index Observation Date: | Nov/2029 |
| 4 | Index Risk Area: | Commercial Machinery Repair and Maintenance |
| 5 | Index Identifier: | PCU811310811310 |
| 6 | Baseline Index Value: | 0.000 |
| 7 | Measurement Index Value: | |
| 8 | Index Percent Change: | ERROR:#DIV/0! |
| LOW UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0821 | 0823 | 0825 | 0831 | 0833 | 0835 | 0837 | 0841 | 0843 | |||||||||||||||
| Field | Description | Rate | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924H Loaders | Dozer E / H Conversion | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 | Column8 | Column9 | Column10 | Column11 | Column12 | Column13 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| MEDIUM UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0821 | 0823 | 0825 | 0831 | 0833 | 0835 | 0837 | 0841 | 0843 | |||||||||||||||
| Field | Description | Rate | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924H Loaders | Dozer E / H Conversion | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 | Column8 | Column9 | Column10 | Column11 | Column12 | Column13 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| HIGH UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0821 | 0823 | 0825 | 0831 | 0833 | 0835 | 0837 | 0841 | 0843 | |||||||||||||||
| Field | Description | Rate | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924H Loaders | Dozer E / H Conversion | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 | Column8 | Column9 | Column10 | Column11 | Column12 | Column13 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
CUI
Order Year 9 (Option)
| CUI | ||
| Contract W56HZV-XX-D-XXXX | ||
| Attachment 0014 Economic Price Adjustment (EPA) Tables | ||
| Field | ||
| 1 | Applicable Contract Year: | Order Year 9 (Option) |
| 2 | Start of Ordering Period: | Feb/2031 |
| 3 | Effective Index Observation Date: | Nov/2030 |
| 4 | Index Risk Area: | Commercial Machinery Repair and Maintenance |
| 5 | Index Identifier: | PCU811310811310 |
| 6 | Baseline Index Value: | 0.000 |
| 7 | Measurement Index Value: | |
| 8 | Index Percent Change: | ERROR:#DIV/0! |
| LOW UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0921 | 0923 | 0925 | 0931 | 0933 | 0935 | 0937 | 0941 | 0943 | |||||||||||||||
| Field | Description | Rate | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924H Loaders | Dozer E / H Conversion | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 | Column8 | Column9 | Column10 | Column11 | Column12 | Column13 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| MEDIUM UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0921 | 0923 | 0925 | 0931 | 0933 | 0935 | 0937 | 0941 | 0943 | |||||||||||||||
| Field | Description | Rate | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924H Loaders | Dozer E / H Conversion | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 | Column8 | Column9 | Column10 | Column11 | Column12 | Column13 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| HIGH UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0921 | 0923 | 0925 | 0931 | 0933 | 0935 | 0937 | 0941 | 0943 | |||||||||||||||
| Field | Description | Rate | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924H Loaders | Dozer E / H Conversion | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 | Column8 | Column9 | Column10 | Column11 | Column12 | Column13 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
CUI
Order Year 10 (Option)
| CUI | ||
| Contract W56HZV-XX-D-XXXX | ||
| Attachment 0014 Economic Price Adjustment (EPA) Tables | ||
| Field | ||
| 1 | Applicable Contract Year: | Order Year 10 (Option) |
| 2 | Start of Ordering Period: | Feb/2032 |
| 3 | Effective Index Observation Date: | Nov/2031 |
| 4 | Index Risk Area: | Commercial Machinery Repair and Maintenance |
| 5 | Index Identifier: | PCU811310811310 |
| 6 | Baseline Index Value: | 0.000 |
| 7 | Measurement Index Value: | |
| 8 | Index Percent Change: | ERROR:#DIV/0! |
| LOW UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 1021 | 1023 | 1025 | 1031 | 1033 | 1035 | 1037 | 1041 | 1043 | |||||||||||||||
| Field | Description | Rate | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924H Loaders | Dozer E / H Conversion | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 | Column8 | Column9 | Column10 | Column11 | Column12 | Column13 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| MEDIUM UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 1021 | 1023 | 1025 | 1031 | 1033 | 1035 | 1037 | 1041 | 1043 | |||||||||||||||
| Field | Description | Rate | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924H Loaders | Dozer E / H Conversion | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 | Column8 | Column9 | Column10 | Column11 | Column12 | Column13 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
| HIGH UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 1021 | 1023 | 1025 | 1031 | 1033 | 1035 | 1037 | 1041 | 1043 | |||||||||||||||
| Field | Description | Rate | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924H Loaders | Dozer E / H Conversion | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 | Column8 | Column9 | Column10 | Column11 | Column12 | Column13 |
| 9 | Original Contract Unit Price | |||||||||||||||||||||||
| 10 | Upward Adjustment Threshold | 3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 11 | Downward Adjustment Threshold | -3% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 14 | Unit Price Subject to Adjustment | 77% | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | $0 | |||||||||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 16 | Final Adjustment Amount | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ||||||||||||||
| 17 | EPA Adjusted Unit Price | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! | ERROR:#DIV/0! |
CUI
Example #1 - Increase
| CUI | ||
| Contract W56HZV-XX-D-XXXX | ||
| Attachment 0014 Economic Price Adjustment (EPA) Tables | ||
| Field | ||
| 1 | Applicable Contract Year: | Option Year 5 |
| 2 | Start of Ordering Period: | Feb/2032 |
| 3 | Effective Index Observation Date: | Nov/2031 |
| 4 | Index Risk Area: | Commercial Machinery Repair and Maintenance |
| 5 | Index Identifier: | PCU811310811310 |
| 6 | Baseline Index Value: | 119.600 |
| 7 | Measurement Index Value: | 125.555 |
| 8 | Index Percent Change: | 4.98% |
| LOW UNIT PRICE | ||||||||||||||||||||||||
| CLIN: | 0509 | 0521 | 0523 | 0525 | 0527 | 0529 | 0531 | 0533 | 0535 | 0537 | 0541 | 0543 | ||||||||||||
| Field | Description | Rate | 621G Scraper | 130G Grader | 120M Type I Grader | 120M Type IA (Air Drop) | M966H Type I Loader | M966H Type II Loader | D7R Dozer w/Winch | D7R Dozer w/Ripper | D6K Type I w/Winch | D6K Type II w/Ripper | 924H Loaders | Dozer E / H Conversion | Column1 | Column2 | Column3 | Column4 | Column5 | Column6 | Column7 | Column8 | Column9 | Column10 |
| 9 | Original Contract Unit Price | $340,550 | $98,000 | $98,000 | $98,000 | $159,250 | $159,250 | $257,250 | $252,350 | $147,000 | $132,300 | $120,050 | $46,550 | |||||||||||
| 10 | Upward Adjustment Threshold | 3% | $10,217 | $2,940 | $2,940 | $2,940 | $4,778 | $4,778 | $7,718 | $7,571 | $4,410 | $3,969 | $3,602 | $1,397 | ||||||||||
| 11 | Downward Adjustment Threshold | -3% | ($10,217) | ($2,940) | ($2,940) | ($2,940) | ($4,778) | ($4,778) | ($7,718) | ($7,571) | ($4,410) | ($3,969) | ($3,602) | ($1,397) | ||||||||||
| 12 | Maximum Upward Adjustment Minus Adjustment Threshold | 10% | $23,839 | $6,860 | $6,860 | $6,860 | $11,148 | $11,148 | $18,008 | $17,665 | $10,290 | $9,261 | $8,404 | $3,259 | ||||||||||
| 13 | Maximum Downward Adjustment Minus Adjustment Threshold | -10% | ($23,839) | ($6,860) | ($6,860) | ($6,860) | ($11,148) | ($11,148) | ($18,008) | ($17,665) | ($10,290) | ($9,261) | ($8,404) | ($3,259) | ||||||||||
| 14 | Unit Price Subject to Adjustment | 77% | $262,224 | $75,460 | $75,460 | $75,460 | $122,623 | $122,623 | $198,083 | $194,310 | $113,190 | $101,871 | $92,439 | $35,844 | ||||||||||
| 15 | Index % Change Applied to Unit Price Subject to Adjustment | $13,055 | $3,757 | $3,757 | $3,757 | $6,105 | $6,105 | $9,862 | $9,674 | $5,635 | $5,072 | $4,602 | $1,785 | |||||||||||
| 16 | Final Adjustment Amount | $2,839 | $817 | $817 | $817 | $1,328 | $1,328 | $2,145 | $2,104 | $1,225 | $1,103 | $1,001 | $388 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .