Attachment 001 Statement of Work.pdf

PDF 48 KB Posted

Attached to
Invasive Plant Pickup Service - Fort Lauderdale FL
Solicitation number
1232SA25Q0674
Issued by

About this file

This document is a Statement of Work (SOW) for the United States Department of Agriculture (USDA), Invasive Plant Research Laboratory (IPRL), detailing the requirements for invasive plant waste pickup. The contractor must collect 500 gallons of cogongrass (Imperata cylindrica) stored in 55-gallon drums from 3225 College Ave, Fort Lauderdale, FL, and properly dispose of the hazardous biological waste. Key contractor requirements include possessing proper licensing and permitting for hazardous material transportation, expertise in hazardous substance categorization, and compliance with Department of Transportation regulations for handling potentially risky materials.

The SOW specifies strict delivery and security protocols, mandating that pickup be scheduled within two weeks of the award date and completed within 60 days. All contractor personnel must be accompanied by a USDA escort while on location and provide proof of employment with a Chemical Waste Pickup Facility. The primary focus is on safely removing and disposing of invasive plant waste while ensuring public health and environmental protection throughout the transportation and disposal process.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 001 STATEMENT OF WORK: USDA, IPRL

Invasive Plant Waste Pickup

GENERAL INFORMATION

Scope of Work: Invasive Plant Waste Pickup

The contractor shall pick up the invasive plant waste in 55 gal drums and safely dispose of it.

CONTRACTOR REQUIREMENTS

Technical Requirements/Tasks

The contractor shall pickup of 500 gallons of invasive plant waste (cogongrass, Imperata cylindrica) stored in 55 gallon drums at the place of performance listed below and properly dispose of it.

The contractor shall follow proper handling of biologically contaminated waste to ensure the public’s health and the environment are protected.

The contractor shall have proper licensing and permiting for transporting and disposing of hazardous materials.

The contractor shall have expertise in hazardous substance categorization with compliance training.

The contractor shall provide proper transportation according to the Department of Transportation (DOT) considers a hazardous waste material as a substance capable of an unreasonable risk to property, health, and safety while it is being transported commercially.

Deliverables/Schedule: Pickup must be scheduled with two weeks of award date and pickup must occur within 60 days of award date

Security Requirements: Proof of employment with Chemical Waste Pickup Facility. +

All contractor personnel shall always be in the presence of a USDA escort while on location.

Place of Performance: 3225 College Ave, Fort Lauderdale FL, 33314

File details come from the government source that posted it. Updated .