Attachment 001- Statement of Work.pdf
PDF 351 KB Posted
- Attached to
- Coal Creek Rockfall Mitigation Federal contract opportunity
- Solicitation number
- 1282B124R0036
- Issued by
- Department of Agriculture Forest Service
About this file
This document is a Statement of Work (SOW) for a federal contract opportunity to provide rockfall mitigation and removal services on National Forest System Road (NFSR) 709 in Gunnison County, Colorado.
The SOW outlines the purpose of the project, which is to mitigate rockfall and remove fractured rock on rock faces that could impact heavy equipment during road reconstruction. The scope includes developing a technical proposal for safe rock removal, relocating the rock debris to a disposal site within 0.7 miles, and optional additional rock removal. The work must be completed between the date of award and July 30, 2024, with rockfall mitigation work allowed from 7:00 am to 6:00 pm, Monday through Friday, excluding holidays. The road can be closed for a maximum of 5 days. Key deliverables include a proposed project plan, a safety plan and schedule, and the actual rock removal and debris disposal. The related federal contract opportunity is Solicitation Number 1282B124R0036 for the "Coal Creek Rockfall Mitigation" project, issued by the Department of Agriculture Forest Service. All questions are due by 5:00 PM Mountain Time on May 29, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0002 - 1282B124R0036.pdf | ||
| Amendment 0001 Attachment 001- Initial Questions and Answers.pdf | ||
| Amendment 0001 - 1282B124R0036.pdf | ||
| Attachment 003- Project Map and Drawings.pdf | ||
| Attachment 002- Supplemental Specifications.pdf | ||
| Site Visit Attendees.pdf | ||
| Solicitation 1282B124R0036 1123956.pdf | ||
| Attachment 004- Wage Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Attachment 001- Statement of Work
Coal Creek Rockfall Mitigation
GRAND MESA, UNCOMPAHGRE, AND GUNNISON (GMUG) NF
Contents Project Title
1.0 Purpose
2.0 Scope or Mission
3.0 Period and Place of Performance
4.0 Background
5.0 Performance Objectives
6.0 Deliverables / Schedule
7.0 Operating Constraints
8.0 Attachments
Project Title Coal Creek Rockfall Mitigation
1.0 Purpose
Rockfall mitigation and rock removal as identified during the pre-bid meeting on-site by the Engineering Project Manager within the rockfall mitigation area to ensure safe operation of heavy equipment needed to reconstruct National Forest System Road (NFSR) 709 – Coal Creek.
2.0 Scope or Mission
Scope of work includes developing a technical proposal for the safe removal of fractured rock on a rock faces that could dislodge and impact heavy equipment operating below the rock faces that extend over roughly 0.2 miles of road.
The contract includes mitigation of the rocks that present a risk and relocation of the rock removed to a disposal site within 0.70 miles of the current rockfall mitigation location.
Additional Optional rock removal has been identified and will be considered as optional bid items to the removal of the fractured rock on the rock face. Rocks will be disposed of at the same disposal site.
Refer to Engineering plans for information.
3.0 Period and Place of Performance
The work can be accomplished between Date of Award and July 30th, 2024. Rockfall mitigation work can occur from 7:00 am to 6:00 pm, Monday through Friday, excluding holidays. Road can be closed for a maximum extent of five (5) days for rockfall mitigation.
4.0 Background
The project is within Gunnison County, Colorado. The mitigation and disposal sites are adjacent to National Forest System Road (NFSR) 709 Coal Creek Road.
• Rockfall mitigation area.
Latitude 38.871028° Longitude -107.330270°
• Rockfall mitigation disposal site (proposed).
Latitude 38.878617° Longitude -107.333953°
Complete base bid items and optional bid items (if awarded).
5.0 Deliverables / Schedule
Key Deliverables Item No. Deliverable Objective Due 1 Proposed Project
Plan Provide the information from 5.0 Performance Objectives to the Contracting Officer for evaluation.
At Proposal
2 Safety Plan and proposed schedule of operations
Upon contract award as successful offeror, provide safety plan for operations and proposed schedule for rockfall mitigation and removal.
At Proposal
3 Removal of rock and rock debris
Rockfall mitigation / removal to include a rock and debris to approved disposal site. If optional bid items awarded, remove rock(s) and debris to approved disposal site.
No later than five (5) business days before the contract is set to expire
6.0 Operating Constraints
Additional collaboration and planning for proposed road closure will be required.
7.0 Attachments
Engineering specifications and drawings have been included for reference.
| Project Title |
| 1.0 Purpose |
| 2.0 Scope or Mission |
| 3.0 Period and Place of Performance |
| 4.0 Background |
| 5.0 Performance Objectives |
| 6.0 Deliverables / Schedule |
| 7.0 Operating Constraints |
| 8.0 Attachments |