Attachment 001 - Schedule of Items (SOI).pdf

PDF 712 KB Posted

Attached to
Badger Fire Disaster Relief Water Developments Project
Solicitation number
1282B124R0015_1120697
Issued by

About this file

This document is a Schedule of Items (SOI) for the Badger Fire Disaster Relief Water Developments project, which is a solicitation issued by the U.S. Forest Service, Department of Agriculture.

The SOI lists the base bid and three option items, with detailed line items for various water infrastructure components such as waterline installation, spring headboxes, water troughs, and site cleanup/restoration. The base bid and each option item have a total price that bidders must provide. The required work includes removing and replacing a total of 20 stock water systems at various locations on the Minidoka Ranger District of the Sawtooth National Forest. Key tasks involve demolition, new construction, and site restoration. Bidders must provide unit prices for all line items, and the Government reserves the right to request additional pricing information. Award will be made to the responsible bidder whose proposal, conforming to the solicitation, is most advantageous to the Government, price and other factors considered.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I - THE SCHEDULE

SECTION B - SUPPLIES OR SERVICES AND PRICES

Badger Fire Disaster Relief Water Developments Sawtooth National Forest Minidoka Ranger District

Cassia County, Idaho

Schedule Notes:

The bidder must bid on all items. Only unit prices to the nearest $0.01 will be accepted. Where extended unit prices do not agree with totals or subtotals shown by the bidder, the unit price governs except as provided under the Federal Acquisition Regulations (FAR) 14.407, Mistakes in bids.

The Government reserves the right to request additional information as required to fully understand the contractor’s pricing structure and determine its reasonableness.

B.1 Schedule of Items

Base Bid Item No.

Description Qty Unit Method of Measure

Unit Price Total Price

15101 Mobilization 1 Lump Sum LSQ $_________ $__________

20301 Removal of Structures and Obstructions

1 Lump Sum LSQ $_________ $__________

20901 HDPE Distribution Waterline Installation, Trenching, Backfill & Compaction

2205 Lineal Foot AQ $_________ $__________

61101 Spring Headbox Construction Complete

3 Each AQ $_________ $__________

61102 Connect to Existing Spring Headbox

5 Each AQ $_________ $__________

61103 Type 1 Trough System Complete 3 Each AQ $_________ $__________

61104 Type 2 Trough System Complete 1 Each AQ $_________ $__________

61105 Type 3 Trough System Complete 4 Each AQ $_________ $__________

61106 Spring Headbox Infiltration Trench & Backfill

60 Lineal Foot AQ $_________ $__________

61107 Rodent Proof Daylight Drain 8 Each AQ $_________ $__________

62301 General Site Cleanup/Restoration 1 Lump Sum LSQ $_________ $__________

TOTAL PRICE (ALL ITEMS – Base Bid) $__________________

Method of Measurement:

AQ – Actual Quanties; CQ – Contract Quantities; LSQ - Lump Sum Quantities

Attachment 001 - Schedule of Items (SOI)

Option Item #1

Item No. Description Qty Unit Method of Measure Unit Price Total Price

15101(1) Mobilization 1 Lump Sum LSQ $_________ $__________

20301(1) Removal of Structures and Obstructions

1 Lump Sum LSQ $_________ $__________

20901(1) HDPE Distribution Waterline Installation, Trenching, Backfill & Compaction

2800 Lineal Foot AQ $_________ $__________

61101(1) Spring Headbox Construction Complete

1 Each AQ $_________ $__________

61102(1) Connect to Existing Spring Headbox

3 Each AQ $_________ $__________

61103(1) Type 1 Trough System Complete 1 Each AQ $_________ $__________

61104(1) Type 3 Trough System Complete 3 Each AQ $_________ $__________

61105(1) Spring Headbox Infiltration Trench & Backfill

20 Lineal Foot AQ $_________ $__________

61106(1) Rodent Proof Daylight Drain 4 Each AQ $_________ $__________

62301(1) General Site Cleanup/Restoration 1 Lump Sum LSQ $_________ $__________

TOTAL PRICE (ALL ITEMS – Option Item #1) $__________________

TOTAL PRICE (ALL ITEMS – Base Bid PLUS

Option Item #1)

Method of Measurement:

Option Item #2

Method of Measure Unit Price Total Price

15101(2) Mobilization 1 Lump Sum LSQ $_________ $__________

20301(2) Removal of Structures and Obstructions

1 Lump Sum LSQ $_________ $__________

20901(2) HDPE Distribution Waterline Installation, Trenching, Backfill & Compaction

2270 Lineal Foot AQ $_________ $__________

61101(2) Spring Headbox Construction Complete

2 Each AQ $_________ $__________

61102(2) Connect to Existing Spring Headbox

4 Each AQ $_________ $__________

61103(2) Type 1 Trough System Complete 4 Each AQ $_________ $__________

61104(2) Type 3 Trough System Complete 2 Each AQ $_________ $__________

61105(2) Spring Headbox Infiltration Trench & Backfill

40 Lineal Foot AQ $_________ $__________

61106(2) Rodent Proof Daylight Drain 6 Each AQ $_________ $__________

62301(2) General Site Cleanup/Restoration 1 Lump Sum LSQ $_________ $__________

TOTAL PRICE (ALL ITEMS – Option Item #2) $__________________

Option Item #1 PLUS Option Item #2)

Option Item #3

Method of Measure Unit Price Total Price

15101(3) Mobilization 1 Lump Sum LSQ $_________ $__________

20301(3) Removal of Structures and Obstructions

1 Lump Sum LSQ $_________ $__________

20901(3) HDPE Distribution Waterline Installation, Trenching, Backfill & Compaction

905 Lineal Foot AQ $_________ $__________

61101(3) Connect to Existing Spring Headbox

2 Each AQ $_________ $__________

61102(3) Type 1 Trough System Complete 1 Each AQ $_________ $__________

61103(3) Type 3 Trough System Complete 1 Each AQ $_________ $__________

61104(3) Rodent Proof Daylight Drain 2 Each AQ $_________ $__________

62301(3) General Site Cleanup/Restoration 1 Lump Sum LSQ $_________ $__________

TOTAL PRICE (ALL ITEMS – Option Item #3) $__________________

Option Item #1 PLUS Option Item #2 PLUS Option Item #3)