Attachment 002 - Statement of Work (SOW) Amended.pdf
PDF 669 KB Posted
- Solicitation number
- 1282B124R0015_1120697
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a Statement of Work (SOW) for the Badger Fire Disaster Relief Water Developments project, which is being solicited by the U.S. Forest Service, Department of Agriculture.
The SOW requires the contractor to remove and replace a total of 20 stock water systems at various locations on the Minidoka Ranger District of the Sawtooth National Forest. The work includes removing and disposing of old infrastructure, constructing new infrastructure such as waterlines, troughs, spring headboxes, daylight drains, and associated valves and fittings. The contractor will also need to perform clearing, grubbing, excavation, backfill, trenching, and site restoration/cleanup. The project is located southwest of Burley, Idaho, and the contractor will be permitted to camp on-site in approved locations. The estimated construction value is between $250,000 and $500,000, and the project duration is from June 10, 2024, to November 15, 2024.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section C - Description/Specifications/Statement of Work Badger Fire Disaster Relief Water Developments
Amended on 04/18/2024 (changes highlighted below)
Project Description Furnish all labor, equipment, and materials as required to accomplish the work under this contract. This project will remove and replace a total of twenty (20) stock water systems at various locations on the Minidoka Ranger District of the Sawtooth National Forest. Work will consist of removing and disposing of all old stock water system infrastructure off forest, constructing new infrastructure consisting of new waterline, new cattle and sheep troughs, new spring headboxes, new daylight drains and all appurtenant new water valves, fittings, and pressure treated trough supports including connecting hardware. Work also includes performing all required clearing and grubbing of existing vegetation to accommodate new improvements, including hazard tree removal, completing all required excavating, backfill, and trenching as applicable, and performing site restoration / cleanup at each respective site when complete.
Project Location The project is located to the SW of Burley, Idaho, on the Minidoka Ranger District of the Sawtooth National Forest, Cassia County, Idaho. Specific site location coordinates are shown on the Drawings, and all sites are accessible via various Forest Roads and Trails. Off-road / trail travel will be required to get to some sites. Contractor shall coordinate approved routes prior to construction with Contracting Officer. If four-wheel drive (4WD) truck access is not possible, an all-terrain vehicle (ATV) or a utility task vehicle (UTV) could be used. However, machinery access for the sake of performing construction activities should not be a problem. Minimal hiking is likely required. The contractor should be able to drive relatively close to each site if not all the way.
Use of Premises (Camping) Camping will be permitted for contract personnel at locations only as approved on the ground by the Contracting Officer. Campsites must not encroach beyond the boundaries designated by the Forest Service, and be located to minimize impacts on streams, lakes, and other bodies of water.
Site disturbance shall be minimized, weed-free prevention practices shall be followed, and appropriate camp site cleanliness/etiquette shall be met.
Project Site Conditions The terrain in the burned area where the various sites are located is varied and moderately rugged with a general landform of benches and plateaus dropping down into moderately deep canyons.
Vegetation is comprised of sagebrush and mountain brush communities within interspersed patches of aspen and timber at higher elevations.
Inspection of Worksite The Contractor acknowledges they have taken the necessary steps to ascertain the nature and location of work and have investigated and satisfied themselves as to the general and local conditions that can affect the work or its cost. Any failure of the contractor to take the actions described and acknowledged in this paragraph will not relieve the Contractor from the
Attachment 002 - Statement of Work (SOW) Amended responsibility of estimating properly the difficulty and cost of successfully performing the work, or for proceeding to successfully perform the work without additional expenses to the Government.
Site Visit Information A Pre-Bid meeting for this project will be held on April 23, 2024, at 11:00 AM at the Forest Boundary where Forest Road 70500 enters the Forest.
Start Date June 10, 2024
End Date (Base Bid and all Option Items) November 15, 2024
Magnitude Of Construction Project:
Between $250,000 and $500,000
Specifications Standard Specifications (FP-14) and the attached Forest Service Supplemental Specifications (FSSS), including applicable “CSI Specs” Supplemental Specifications, are applicable to this contract. All applicable FSSS, including “CSI Specs” Supplemental Specifications, are included in full text. All specifications not included in the specification listing but referenced by listed specifications are applicable. Standard Specifications (FP-14) are available in pdf format on-line at https://highways.dot.gov/federal-lands/specs .
Attachment 002 - Statement of Work (SOW) Amended
File details come from the government source that posted it. Updated .